Summary
Overview
Work History
Education
Skills
Timeline
OperationsManager

Nirav Panchal

Operations Manager
Mumbai,MH

Summary

Forward-thinking team leader skilled at operating departments efficiently to meet goals. Successful background matching employees with roles for maximum performance. Proactive and hardworking individual focused on continuous operational improvement.

Overview

9
9
years of professional experience

Work History

Operations Manager

Amar Equipments Pvt. Ltd.
11.2022 - Current
  • Empowered employees to take ownership of their responsibilities, leading to increased accountability and improved performance outcomes.
  • Developed strong relationships with vendors, resulting in better pricing and improved service quality.
  • Oversaw facility maintenance, ensuring optimal functionality of equipment and infrastructure at all times.
  • Implemented quality control systems that boosted overall product consistency and reliability.
  • Reduced turnaround time for project completion through effective resource allocation and team management.
  • Conducted regular performance reviews, identifying areas for improvement and developing action plans to address them.
  • Facilitated smooth collaboration between departments through clear communication channels.
  • Optimized supply chain operations through strategic vendor partnerships and efficient logistics planning.
  • Developed systems and procedures to improve operational quality and team efficiency.

Sr. Design Engineer

Kumar Metals Pvt. Ltd.
02.2021 - 11.2023
  • Coordinate with project team to develop and coordinate development of design and drawings.
  • Preparation of technical specifications, data sheets for mechanical equipment including pressure vessels, Tanks and other process equipment.
  • Ensure the required services meet of customer, and applicable statutory and regulatory requirements, on time and within budget
  • Review vendor documentation and drawings
  • Review/perform strength calculation (Pressure vessels mainly, including PV Elite report)
  • Specify mechanical components including piping, fittings, agitators, distributors, etc.
  • Secure design and verification process for appointed equipment and secure and support standardization of designs and products across project.

Sr. Project Engineer

Amar Equipments Pvt. Ltd
09.2020 - 02.2022
  • Identified potential risks early in the process, allowing proactive mitigation measures to prevent delays or setbacks.
  • Optimized resource allocation for cost-effective project management, ensuring projects stayed within budget constraints.
  • Mentored junior engineers to develop their skills, resulting in a more knowledgeable and versatile workforce.
  • Presented technical findings to stakeholders, ensuring clear understanding of project status and goals.
  • Established strong working relationships with clients through exceptional communication skills, fostering trust and collaboration.
  • Evaluated vendor proposals for equipment procurement, selecting optimal solutions based on performance requirements.
  • Improved team productivity by providing technical guidance and mentoring junior engineers.
  • Resolved critical issues during system integration phases, ensuring seamless transitions between design iterations.
  • Reviewed technical drawings developed by CAD technicians and drafters.

Sr. Engineer - Technical Sales and Projects

Bechtochem Consultants And Engineers Pvt. Ltd
05.2018 - 09.2020
  • Reduced estimation errors by conducting thorough reviews and revisions of project scopes and specifications.
  • Developed long-term relationships with suppliers, securing favorable pricing agreements that benefited both parties.
  • Facilitated smooth handoffs between engineering departments by clearly communicating the assumptions made during the estimation process.
  • Assisted in contract negotiations by providing accurate cost breakdowns and justification for proposed pricing structures.
  • Supported project managers throughout construction phases by providing up-to-date budget information as needed.
  • Provided technical support to customers during pre-sales consultations, addressing concerns, and offering solutions tailored to their needs.
  • Improved overall customer satisfaction by proactively addressing concerns and resolving issues in a timely manner, demonstrating a commitment to exceptional service.
  • Established long-term relationships with key clients for repeat business and referrals, cultivating a strong network within the industry.

Static Equipment Design Engineer

Amar Equipments Pvt. Ltd.
12.2016 - 05.2018

Mechanical Engineer

Armaco Chemical Process Systems Pvt. Ltd.
07.2015 - 12.2016

Education

Bachelor of Engineering - Mechanical Engineering

KJ Somaiya College of Engineering
Mumbai
04.2001 -

Diploma in Mechanical Engineering - Mechanical Engineering

Fr. Agnels Polytechnic
Navi Mumbai
04.2001 -

Navodaya English High School
Mumbai
05.2008

Skills

Engineering standards

undefined

Timeline

Operations Manager

Amar Equipments Pvt. Ltd.
11.2022 - Current

Sr. Design Engineer

Kumar Metals Pvt. Ltd.
02.2021 - 11.2023

Sr. Project Engineer

Amar Equipments Pvt. Ltd
09.2020 - 02.2022

Sr. Engineer - Technical Sales and Projects

Bechtochem Consultants And Engineers Pvt. Ltd
05.2018 - 09.2020

Static Equipment Design Engineer

Amar Equipments Pvt. Ltd.
12.2016 - 05.2018

Mechanical Engineer

Armaco Chemical Process Systems Pvt. Ltd.
07.2015 - 12.2016

Bachelor of Engineering - Mechanical Engineering

KJ Somaiya College of Engineering
04.2001 -

Diploma in Mechanical Engineering - Mechanical Engineering

Fr. Agnels Polytechnic
04.2001 -

Navodaya English High School
Nirav PanchalOperations Manager