Summary
Overview
Work History
Education
Skills
Declaration
Timeline
Certification
Accomplishments
Work Availability
Affiliations
Work Preference
Quote
Software
Languages
Interests
AccountManager
Bhagat Singh Mehta

Bhagat Singh Mehta

Civil Survey Engineer

Summary

Assistant Manager specializing in survey planning, tunnel alignment, and total station operations for hydro, bridge, railway, and tunneling works. Delivers layout control, benchmark transfer, cross-section plotting, and quantity calculations across large infrastructure packages, including barrage, bridge, and TBM alignment work. Supports complex field execution with AutoCAD documentation, coordinate control, and on-site survey supervision.

Overview

21
21
years of professional experience
1
1
Certificate
2
2
Languages

Work History

Assistant Manager

Rithwik Projects Pvt. Ltd.
Pune , maharasta
12.2012 - Current
  • Project : Civil & Hydro Mechanical Works of 1500 MW Tarali Pumped Storage Project" at Dangistewadi Village in Patan Taluka, Satara District, Maharashtra, INDIA.
  • Client : adani.
  • Project cost Civil Works 2,803Crores.
  • Project : Construction of Barrage & Desilting Chamber Package Tapovan Vishnugad Hydro Electric Power Project (4 x 130 MW) on River Dhaulganga in District Chamoli, State Uttarakhand.
  • Client : NTPC.
  • Project cost : 470 Crores.
  • Description of Duties: Conducting reconnaissance and preliminary survey for selected area and Tunnel alignment , Bridges and other structures. Carrying out and establishing the coordinates along the tunnel alignment, Carrying out and supervising the traversing work and transferring levels from bench marks and establishing the TBM along the Tunnel, Carrying out and supervising of stacking out of design centre lines using Total Station, Setting out of vertical and horizontal curves of barrage Radial Gate ,centre lines of tunnel, Bridges, Barrage, Desilting Chamber detailed survey of junctions, fixing of alignment of bypass. Layout of structures, layout of well foundation, monitoring civil work, layout of open Foundation, Profiling, section of tunnel and Excavation Area using total station. Plotting X-section and-L-section and quantity calculations using AutoCAD.
  • Project : RVNL Project - Rishikesh to Karan Prayag Section Package No 6
  • Client : Rail Vikas Nigam Limited (RVNL)
  • Project cost : INR 1660 Crores
  • Description : Construction of Single Line BG Tunnel No. 11 (9050 M), Major & Minor Bridges, Formation Works and other Ancillary works from Chainage 73+489 KM to 83+899
  • From 1st December 2012 to till Date

Assistant Manager

V.K. Gupta & Associates Engineers & Contractors
Dehradun , uttrakhand
02.2010 - 11.2012
  • Project: 01 : Dobra Project New Tehri. The 440-metre long Dobra Chanti Bridge is India's longest motorable single lane suspension bridge. And 250-metre span of the bridge
  • Client : PWD.
  • Project cost : 150 Crores.
  • Description of Duties: Responsible for fixing and checking of Bench Mark, traverse point and alignment checking recording of OGL fixing of tower member vertical member, Checking of horizontal tower Erection. Layout of Bridge Pier, Wind Anchor foundation marking pier cape and over span bridge alignment and checking of suspension bridge rope sag.
  • Project: 02 : Manali - Solang Nala Bridge Near Rohtang tunne, Himachal Pradesh.
  • Client : BRO.
  • Project cost : 32 Crores.
  • Description of Duties : Responsible for fixing Bridge alignment. Layout of Bridge Pier, foundation marking pier cape and over span bridge alignment and Earthwork Quantity & calculation supervising of Civil Work.
  • Project: 03 : Suspension bridge over Alaknanda river near Srinagar adjoining the famous Dhari Devi temple, Uttarakhand.
  • Client : GVK.
  • Project cost : 5 Crores.
  • Description of Duties: Fixing Bridge alignment. Layout of Bridge Pier, foundation marking pier cape and alignment and Earthwork Quantity calculation & supervising of Civil Work.
  • Project: 04 : Suspension bridge over Alaknanda river near Malyashu papdasu Village , Uttarakhand.
  • Client : GVK.
  • Project cost : 5 Crores.
  • Description of Duties : Fixing Bridge alignment. Layout of Bridge Pier, foundation marking pier cape and alignment and Earthwork Quantity calculation & supervising of Civil Work.
  • Feb 2010 to Nov 2012

Surveyor

Intensive Complete Survey
Dehradun , uttrakhand
04.2008 - 02.2010
  • Project : Consultancy Project.
  • Description Of Duties : Deals in digital Topographical survey of Road/Land/Thermal Power project /hydro project/river/canal with stake out/alignment and DPR of all project contour plan of hydro project total catchments area of all project.
  • From April 2008 to Feb 2010

Assistant Surveyor

BD Joshi Survey enterprises
Dehradun
08.2005 - 06.2008
  • Project : Consultancy Project.
  • Industrial area, Survey of India project ropeway project, hydro project total catchments Area Purkal Village, PO: Bhagwantpur, Dehradun.
  • Description Of Duties : Plotting land demarcation of Boundary Deals in digital Topographical survey of Road/Land/Thermal Power project /hydro project/river/canal with stake out/alignment and DPR of all project contour plan of hydro project total catchments area of all project.
  • From August 2005to Jun 2008

Education

AutoCAD Civil3D Course -

Cadd Center Dehradun
Ballupur Chowk, India

Diploma - Civil Engineer

Institute Of Management and Engineering
NEW DELHI, India

BA - undefined

01-2009

12th - undefined

UK
01-2008

10th - undefined

UK
01-2005

Skills

Survey planning

Total station surveying

Traverse calculations

Bench mark setting

Alignment staking

AutoCAD

Quantity calculations

Cross-section plotting

Data processing

Site layout planning

Declaration

I do hereby declare that the above information is true and correct to the best of my knowledge & belief. Place: Date: Bhagat Singh Mehta

Timeline

Assistant Manager

Rithwik Projects Pvt. Ltd.
12.2012 - Current

Assistant Manager

V.K. Gupta & Associates Engineers & Contractors
02.2010 - 11.2012

Surveyor

Intensive Complete Survey
04.2008 - 02.2010

Assistant Surveyor

BD Joshi Survey enterprises
08.2005 - 06.2008

10th - undefined

12th - undefined

BA - undefined

Diploma - Civil Engineer

Institute Of Management and Engineering

AutoCAD Civil3D Course -

Cadd Center Dehradun

Certification

Rithwik projects

Accomplishments

Barrage and silt flushing tunnel

Work Availability

monday
tuesday
wednesday
thursday
friday
saturday
sunday
morning
afternoon
evening
swipe to browse

Affiliations

  • Rithwik projects

Work Preference

Work Type

Full Time

Location Preference

On-Site

Important To Me

Career advancementPersonal development programsHealthcare benefitsWork from home optionPaid time offStock Options / Equity / Profit Sharing401k matchPaid sick leaveTeam Building / Company RetreatsCompany CultureWork-life balanceFlexible work hours

Quote

The way to get started is to quit talking and begin doing.
Walt Disney

Software

Rithwik projects

Languages

English
Intermediate (B1)
Hindi
Beginner (A1)

Interests

Rithwik projects

Bhagat Singh MehtaCivil Survey Engineer