Summary
Overview
Work History
Education
Skills
Software
Accomplishments
Timeline
Generic
Subhankar Das

Subhankar Das

COMMISSIONING(MECHANICAL) ENGINEERING
PANSKURA

Summary

Focused Commissioning Engineer offering 3.8 years background overseeing installation of plants, systems and equipment. Expertise in creating and carrying out test procedures and investigating problems and troubleshooting issues. Focused leader dedicated to motivating teams to achieve higher levels of performance excellence.

Overview

4
4
years of professional experience
7
7
years of post-secondary education
3
3
Languages

Work History

Boiler & Turbine DCS Operator

OEG
Jharsuguda
08.2017 - 07.2018

JOB DETAILS:-

  • 36 TPH AFBC Boiler and 2*10 TPH WHRB coal and char fired boiler made by Thermax
  • 12 MW Steam Turbine made by Sinipon
  • Air cooling condenser (ACC) is being used as a condencer


JOB RESPONSIBILITIES:-

  • Boiler hydro test at 96 kg/cm2 pressure.
  • Boiler cold start up and hot start up
  • Boiler overhauling
  • Turbine cold and hot rolling.
  • PRDS line charging.
  • Deareator Charging.
  • smooth and efficient operation as per requirement.
  • Hogger and Ejector Charging .

Commissioning Engineering

Thermax Ltd.
jagdalpur
08.2019 - Current

Job Details-

  • I have experience of erection and commissioning and operation in 3*160 TPH boiler (THERMAX)using of Blast furnace gas, coke oven gas and balance gas, 2*40 MW steam turbine (GE-TRIVENI),3 Turbo blower(BHEL). 228 cubic meter/hr DM plant, ETP ,ACW & MCW system.
  • I have an experience in 32 MW GTG(SIEMENS) and 150 TPH HRSG commissioning and operation & maintenance at NFL, Nangal.
  • I have an experience in 32 MW GTG(SIEMENS) and 70 TPH HRSG (THERMAX)commissioning and operation & maintenance at NFL Bhatinda.

Job Responsibilities:-

  • Inspection of Boiler and its auxiliaries as per P&I Drawing.
  • Checking of starting permissive and trip logic of boiler.
  • Preparing schedule for commissioning activities.
  • De-bottlenecking and execution of commissioning activities within the commissioning schedule.
  • Ensure the Equipment safety during operation.
  • Customer co-ordination, Manpower management, Project schedule implementation.
  • Planning Manpower resources with required tools, consumables to carry out the erection and commissioning activities.
  • All motor and pump no load & load trail, vibration check and rectify the reason if vibration and temperature is high.
  • Lube oil flushing of BFP lube oil skid and turbine lube oil flushing as per P&ID.
  • All type valve maintenance like-SOV, MOV, control valve, goggle valve, control valve damper as per o&m
  • All gas type burner commissioning, boiler commissioning
  • Analyzed, troubleshooting software problems and communicated possible solutions with development team.
  • Verified resolution of differences in actual versus expected results and addressed development adjustments to plans.
  • Developed organizational processes, job results and accurate forecasts necessary to reach projected milestones.

Education

Higher Secondary - Science

Purba Chilka Lal Chand High School
Purba Chilka
03.2011 - 04.2013

B.Tech - Mechanical Engineering

Haldia Institute of Technology
Haldia
08.2013 - 07.2017

Post Graduate Diploma Course - Power Plant Engineering

NPTI
Faridabad
08.2018 - 08.2019

Skills

Thermal power plant operation and maintenanceundefined

Software

Ms-word

Ms-excell

Autocad

Catia

Solidworks

Accomplishments

  • Completed project on design and fabrication of Formula car organized by Formula Student India in 2014 to 2017.
  • Completed project on Improvement of power plant efficiency in 2018-19.
  • Completed project on CAR crashing analysis in 2017 using SIM-20 software.

Timeline

Commissioning Engineering

Thermax Ltd.
08.2019 - Current

Post Graduate Diploma Course - Power Plant Engineering

NPTI
08.2018 - 08.2019

Boiler & Turbine DCS Operator

OEG
08.2017 - 07.2018

B.Tech - Mechanical Engineering

Haldia Institute of Technology
08.2013 - 07.2017

Higher Secondary - Science

Purba Chilka Lal Chand High School
03.2011 - 04.2013
Subhankar DasCOMMISSIONING(MECHANICAL) ENGINEERING