Summary
Overview
Work History
Education
Skills
Certification
Timeline
Generic
Rajeswari Tripathy

Rajeswari Tripathy

Senior Engineer
Gurgaon

Summary

Senior engineer with a focus on highway design, bringing over eight years of experience in roadway geometric design and modeling. Adept in using MX Road and Civil 3D for detailed design tasks, including drainage profiles and traffic analysis. Expertise in road marking and RRRAP analysis, ensuring compliance with engineering standards. Committed to delivering precise and effective highway solutions that enhance infrastructure quality.

Overview

8
8
years of professional experience
1
1
Certification
1
1
Language

Work History

Senior Engineer

Atkins
06.2020 - Current
  • GTC Secondment to Buckinghamshire council office, United Kingdom (April 2024 – Oct 2024):
  • Liaison with clients and other stakeholders for Project requirements, efficient delivery with quality and visiting local offices.
  • Involved as Project manager of three projects – which includes the stage gates, Fee estimations PSR submissions in Ecosys.
  • Supervise as a designer at live construction site with all the health and safety requirements.
  • Provided Lunch time sessions for use of ProjectWise, Project assurance tool (PAT) AutoCAD and civil 3D.
  • Attending the events for sustainability by JWD.
  • Multiple site visits and making site visit notes.
  • Network Safety Schemes (2024-2025), Buckinghamshire council: Network safety schemes involves seven schemes from feasibility design to detail design. Where her responsibilities include:
  • Leading three schemes as lead designer from UK during secondment
  • 2D layout and 3D model design using civil 3D as per DMRB Standards
  • 2D and 3D Topo review
  • Preparation and checking of design drawings
  • Site visits and Markups
  • Travel Hub, Cambridgeshire council: The detailed design project involves three schemes including Bus corridor, widening of the off slip to provide four lanes, A10 Junction improvement. Her responsibilities include:
  • Compliance check of Preliminary design drawings and Detail design drawings
  • 2D layout and 3D model design using civil 3D as per DMRB Standards
  • 2D and 3D Topo review
  • Preparation and checking of design drawings
  • Preparation of Specification
  • M65 Bus terminus, Lancashire County council: The detail design project involves widening of the off slip to provide two lanes with dual carriageway, Widening of Circulatory carriageway and widening in roundabout approaches to provide additional capacity. Her responsibilities include:
  • Compliance check of Preliminary design drawings and Detail design drawings
  • 2D layout and 3D model design using civil 3D as per DMRB Standards
  • 2D and 3D Topo review
  • Preparation and checking of design drawings
  • Preparation of Specification
  • RRRAP analysis
  • Virtual Street Design: Her key responsibility includes the design of corridor model with 3dx max output for WSP additional section and support in all VSD 3D works.
  • Salisbury River Park Corridor, Wiltshire Council: The detailed design project involves the two schemes including Ashley Road with segregated cycleway and pedestrian facilities and improvement of millstream shared used path, her responsibilities include:
  • 2D layout and 3D model design using civil 3D as per DMRB Standards
  • 2D and 3D Topo review
  • Preparation and checking of design drawings
  • Preparation of Specification
  • Millstream bridge corridor, Wiltshire Council: The detailed design project involves the new millstream bridge corridor with improvement of junction and shared used facility at the approaches connecting Salisbury rive park scheme. Her responsibilities include:
  • Compliance check of Detail design drawings
  • 2D layout and 3D model design using civil 3D as per DMRB Standards
  • 2D and 3D Topo review
  • Preparation and checking of design drawings
  • Providence Hill Cycle Route Detail Design, Hampshire County Council: The detailed design project involves the improvement of cycle facilities and junction improvements. Her responsibilities include:
  • Compliance check of Preliminary design drawings and Detail design drawings
  • 2D layout preparation as per DMRB Standards
  • Preparation and checking of design drawings
  • Pavement Design with report
  • Preparation of Specification document
  • TCF-Rushington Roundabout, Hampshire County Council: The detail design project involves widening of the Northbound carriageway to provide a Bus Lane to provide additional capacity at the entry to the roundabout to reduce queuing back up the Marchwood bypass. Her responsibilities include:
  • Compliance check of Preliminary design drawings and Detail design drawings
  • 2D layout and 3D model design using civil 3D as per DMRB Standards
  • 2D and 3D Topo review
  • Preparation and checking of design drawings
  • Pavement Design with report
  • Preparation of Specification document
  • Park Road South Detail Design, Hampshire County Council: The detailed design project involves widening of the southbound dual carriageway to provide a third lane southbound on Park Road South to provide additional capacity at the entry to the roundabout to reduce queuing back up the Park Road corridor from the town center. Her responsibilities include:
  • Compliance check of Preliminary design drawings and Detail design drawings
  • 2D layout and 3D model design using civil 3D as per DMRB Standards
  • 2D and 3D Topo review
  • Preparation and checking of design drawings
  • Pavement Design with report
  • Preparation of Specification document
  • Gosport bus station Detail Design, Hampshire County Council: The detail design project involves improving accessibility, and improvements to the transport infrastructure in the area for buses, pedestrians, and cyclists, such as providing a new bus station and maintaining a key interchange facility to serve the ferry terminal and the Eclipse bus services. Her responsibilities include:
  • Preliminary design drawings compliance Check, Swept Path Analysis
  • 2D and 3D Topo review
  • Pavement Design with report and specification
  • HCC Maintenance: Her key role is as a checker and to ensure that the deliveries are sent right at first time. She is responsible of Checking various drawings including Resurfacing, drainage, civils, road marking etc.
  • Developer’s Check: She is responsible for checking all types of drawings received from client like horizontal, vertical geometry drawings, detailed cross sections, long sections, sign schedule, general arrangement, compliance and non-compliance report for the Scheme given below.
  • North Chippenham Consortium.
  • Road Marking and Studs Schedule: She is responsible of Preparing the Road Markings and Site clearances drawings, Labelling and to locate the departures as per DMRB Standards for various roadways scheme given below.
  • Area 6 TO 54.
  • M27 Junction 10 Capacity Improvement, Hampshire County Council: The project included provision of slip roads, improvement of existing slip roads and links and roundabout with utility Diversion. Her responsibilities include:
  • Detailed Design of Utility diversion with 3D View
  • Assessment for the Maintenance works
  • Preparation of Cross sections with detailing
  • Portchester District Detail Design, Hampshire County Council: The detail design project involves modification in existing central reserve, Improved bus journey reliability and passenger transport journey and to enhance pedestrian and cycle facilities. Her responsibilities include:
  • Compliance check of Preliminary design drawings and Detail design drawings
  • 2D layout and 3D design using civil 3D as per DMRB Standards
  • 2D and 3D Topo review, Swept Path analysis
  • Preparation and checking of design drawings

Assistant Highway Design Engineer

Accrete Consulting Engineers Pvt Ltd
08.2017 - 03.2020
  • Key Projects:
  • Improvement and up-gradation of existing carriageway to two-lane with paved shoulder from km. 0.000 (Chhawani) to Km. 55.000 (near Chhapia village) of NH-227A in the State of Uttar Pradesh on EPC mode.
  • Roles & Responsibility:
  • Detail design including horizontal design, Vertical design, carriageway modelling, Superelevation, Extra Widening, curve table, HIP, VIP, Detailed Cross Section, Earthwork quantity, Inception report, Design Basis Report, Site visits and meeting with Authority Engineer and officials from client and other agencies involved, Preparation of Plan & Profile Drawings.
  • Plan & Profile of ten no’s ROBs of Patna in the State of Bihar.
  • Danapur ROB
  • Sachivalay ROB
  • Phulwari ROB
  • Mokama ROB
  • Sahari Halt ROB
  • Barh ROB
  • Neora ROB
  • Sonpur ROB
  • Karbighaiya ROB
  • Kargilchowk ROB
  • Roles & Responsibility:
  • Detail design including horizontal design, Vertical design, carriageway modelling, Detailed Cross Section, Inception report, Design Basis Report, Site visits and meeting with Authority Engineer and officials from client and other agencies involved, Preparation of Plan & Profile Drawings for Detail Project Report.
  • Rehabilitation and upgradation of Muzaffarnagar to Baraut section of (MDR- 135w) from existing km 2+970 to km 62+144 in the state of Uttar Pradesh to two-lanes with paved shoulder on EPC mode.
  • Roles & Responsibility:
  • Detail design including horizontal design, Vertical design, carriageway modelling, Superelevation, Extra Widening, curve table, HIP, VIP, Detailed Cross Section, Earthwork quantity, Inception report, Design Basis Report, Site visits and meeting with Authority Engineer and officials from client and other agencies involved, Preparation of Plan & Profile
  • Construction of S L Bridge over River Baitarani at 1st Km on Ambo-Batto Road in the District of Keonjhar (Odisha).
  • Roles & Responsibility:
  • Detail design including horizontal design, Vertical design, carriageway modelling, Superelevation, Extra Widening, curve table, HIP, VIP, Detailed Cross Section, Earthwork quantity, Inception report, Design Basis Report, Site visits and meeting with Authority Engineer and officials from client and other agencies involved, Preparation of Plan & Profile Drawings.
  • Rehabilitation and upgradation of Watul to Talgaon section of NH-17 [new NH no. 66] from existing km 332/200 to km 367/200 [design km 165+270 to km 198+528] in the state of Maharashtra to four-lanes with paved shoulders on EPC mode under NHDP-IV.
  • Roles & Responsibility:
  • Design of Service Road, Drainage Profile with Drain Hydrology, Junction Profile, Earth work Quantity along with Detailed Cross Section and Liaising with client.
  • Construction of Four Laning of Tarsod-Fagne (Package-IIB) Section of NH-6 from Km 422.700 to Km 510.000 in the state of Maharashtra to be executed on hybrid Annuity mode under NHDP Phase IV.
  • Roles & Responsibility:
  • Design of Service Road, Drainage Profile with Drain Hydrology, Junction Profile, Earth work Quantity along with Detailed Cross Section.
  • Development and upgradation of Banar - Bhopalgarh -Kuchera section of (SH-63) from existing km 0+000 to km 126+500 in the state of Rajasthan to two-lanes/four-lane under RSHDP-II.
  • Roles & Responsibility:
  • Horizontal design of some stretches and vertical design, carriageway modelling, super elevation, curve table, HIP, VIP, Extra widening, Earth work Quantity and Traffic analysis.
  • Rehabilitation & Upgradation of Two-lane flexible pavement to 2lane with / without paved shoulders on Bhawi-Pipar-Khimsar, state highway 86C in the state of Rajasthan design Ch- 0+000 to ch-20 +950, 30+555 to 70+850, 74+750 to 96+975 in the state of Rajasthan under RSHDP-II.
  • Roles & Responsibility:
  • Horizontal design of some stretches and vertical design, carriageway modelling, super elevation, curve table, HIP, VIP, Extra widening, Earth work Quantity and Traffic analysis.
  • Construction of 2-lanning with paved shoulders road on Amravati-Bhatkuli-Asara road joining Bhatkuli taluka HQ to Amravati district HQ SH-280 in the state of Maharashtra under MRIP on hybrid annuity mode.
  • Roles & Responsibility:
  • Horizontal design of some stretches and vertical design, carriageway modelling, super elevation, curve table, HIP, VIP, Extra widening, Earth work Quantity and Traffic analysis.

Education

B. Tech - Civil Engineering

Orissa Engineering College
Bhubaneswar, Odisha

Skills

AutoCAD and Civil 3D design Navisworks modeling Bentley MX road design RRRAP analysis and pavement design

Certification

GMICE

Timeline

Senior Engineer

Atkins
06.2020 - Current

Assistant Highway Design Engineer

Accrete Consulting Engineers Pvt Ltd
08.2017 - 03.2020

B. Tech - Civil Engineering

Orissa Engineering College
Rajeswari TripathySenior Engineer