A seasoned Pavement Cum Material Engineer with a proven track record at LEA GROUP HOLDINGS, I excel in materials characterization and construction management. My expertise in geotechnical engineering and quality assurance, coupled with strong decision-making abilities, has significantly enhanced project efficiencies. Achievements include innovative solutions in high-performance concrete designs, underlining my commitment to excellence and collaborative project success.
Coordinated and evaluated manufacturing processes for efficiency and profitability
Asphalt plants, Concrete batch plants and audit to steel, cement & all manufactured items for ensuring supply of quality products
Applied core engineering principles when working through manufacturing processes and ensured best fit product to project
Experimented with new materials and experimental TRIALS RUN for manufacture of SG.GSB,WMM,HMP,CMD products
Developed and improved commonly used tools and systems for effective data base for all lab activities for project
Developed product material for HMA manufacturing process taking environmental concerns into consideration
Interacted with different engineering professionals outside of company staff on projects and initiatives
Accurately wrote operational documents after receiving technical author review and approval
Associate General Manager
Expressway, Mumbai Green Field Expressway, LEA GROUP HOLDINGS
01.2008 - 01.2021
Consultancy Services for Authority's, for Supervision of Construction of Eight Lane access -Controlled Expressway starting from MP/Gujarat Border near Chhayan village and ending at Junction with NH-47 near Bhamaiya Village in Panchmahal District (Ch.696+920 to Ch.781+282) section of Delhi-Vadodara Greenfield Alignment (NH-148N) on EPC mode under Bharatmala Pariyojana in state of Gujarat (Delhi -Vadodara/NH-148N/AE/Pkg 26,27,28)
ACTIVITIES PERFORMED-Responsible for construction supervision, QA/QC Material approvals/Mix design with innovative methods for HMP, CMD, Method statement for all construction activities of Expressway
Implemented innovative solutions to address challenges faced by project organization, leading to improved operational efficiency
Implementation of Quality Control Aspects and Quality Assurance Program using modern technology(High performance concrete using mineral admixtures)
Provision to ensure that field-testing laboratories are adequately equipped, and all equipment is duly calibrated
Testing soils and other materials by carrying out various tests to determine their suitability and ensure that material testing and sampling are in accordance with specifications
Carry out suitability tests of materials for acceptance, rejection, or improvement for same
Provision to ensure that all necessary quality control tests are carried out and establishing Quality Lab data Base for every IPC of EPC
Supervise all field works for pavement investigation (test pitting, DCP test, and sampling and laboratory tests) and material sites/Geo-technical investigations for Major Structures
Improved overall team performance by implementing strategic management initiatives and fostering a collaborative work environment
Optimized resource allocation by analyzing workforce requirements and adjusting staffing levels accordingly
Boosted employee morale through recognition programs, open communication channels, and team-building activities
Streamlined processes for higher efficiency, by identifying bottlenecks and reorganizing workflows in department
Navigated complex negotiations with external partners to secure favorable terms for organization while maintaining strong working relationships
Strengthened relationships with external partners by maintaining open lines of communication and promptly addressing their needs
Pavement cum Material Engineer
LEA GROUP HOLDINGS
05.2016 - 10.2018
Kenyan Urban Road authority
Main project features: Length: 10.4 Km; 4 Lane; Flexible Pavement (Asphalt Concrete Road Work); Project Cost: US$ 96.73 Million; Details of Structure: 1 Flyover: 955.5m Length with maximum span of 24.5 m)
Accurately wrote operational Design asphalt, concrete, soil documents after receiving technical author review and approval
Coordinated and evaluated manufacturing processes of Hot Mix Asphalt, Concrete for efficiency
Applied core engineering principles when working through manufacturing processes
Interacted with different engineering professionals outside of company staff on projects and initiatives
Streamlined manufacturing processes to remove unnecessary steps and produce quality products through faster, more efficient systems
Experimented with new materials and experimental hardware for manufacture of Sub Grade and Subbase of highway
Developed and improved commonly used tools and systems of Central Lab
Material Engineer
IKAM Engineering Consultants
Muscat
03.2015 - 04.2016
Name of Assignment or Project: Construction Supervision for 4-Laning of Batinah Highway along with Grade Separated Junctions (Stage 3 (Part1) in Oman; (Asphalt Concrete Road Work)., Ministry of Transport & Communications
Main project features: Length: 45 Km; 4 lanes; Rigid/ Flexible Pavement; (Asphalt Concrete Road Work); Project Cost: US$ 68.24 Million; Total no of girders 100 nos.; Constructed MSE wall 32,000 sq
M; Box Culverts New-11no's
Extended-13nos; Pipe culverts Extended- 23 no's;, Improved material selection process by conducting thorough research on various materials and their properties
Implemented process improvements that reduced waste generation during manufacturing operations, resulting in significant cost savings for the company
Collaborated with cross-functional teams to optimize material usage and reduce production costs
Designed and implemented advanced material characterization techniques to better understand material behavior under various conditions
Spearheaded the development of new materials that met stringent industry standards for performance, safety, and environmental impact
Developed innovative solutions for material challenges, resulting in increased product lifespan and durability
Conducted failure analysis investigations to determine root causes of material-related issues, leading to improved product quality and reliability
Name of Assignment or Project: Construction Supervision for Rehabilitation and Upgradation to 2 lane with paved shoulders of Multai Chhindwara - Seoni Highway Section of NH-69A and Narasinghpur Amarwara Chhindwara -Saoner Highway Section of NH-26B including construction of Ring Road and connecting Roads in Chindwara Town in States of Madhya Pradesh & Maharashtra; (Asphalt Concrete Road Work)
(Including Bridges/ROB as detailed below)
Madhya Pradesh & Maharashtra, National, Authority
07.2012 - 03.2015
Of India
Main project features: Length: 420 Km; 2 -lane; Flexible Pavement; (Asphalt Concrete Road Work); Project Cost: US$ 254.07 Million; including Over Pass Underpass, Vehicle Underpass & Cattle Underpass: 23 Nos.; Culverts Nos
(109 Box, 33 Slab & 578 HP)
Conducted research to identify and evaluate new technologies and concepts as HPE
Performed complex calculations to analyze and optimize engineering processes
Lead Team member of Rapid action Force formed by PD-NHAI to resolve highway alignment /survey issues of Chhindwara Ring Road.As RAF lead successfully completed the task within 30days as time fixed by NHAI-PD Mr.Sanjay Arya
Technical evaluations of engineering designs and innovative methods in widening of existing rod without disturbing existing traffic
Analyzed and interpreted data to identify trends and recommend improvements for crust/pavement design over existing road to proper standards
Developed high-quality engineering designs and plans to meet industry standards
Designed and implemented quality control processes to facilitate customer/client satisfaction
Developed and maintained relationships with Contractors to facilitate quality and timely delivery of materials
Implemented automated systems to improve accuracy and efficiency of engineering processes
Name of Assignment or Project: Construction Supervision for Upgradation of the road from Haveri to Tadas State Highway in the state of Karnataka (Asphalt Concrete Road Work)
(Contract No
KSHIP-II/STG/ICB/WEP2, Karnataka State Highways Improvement Project
Main project features: Project Length: 75.26 Km; 2 lane; Flexible Pavement (Asphalt Concrete Road Work); Project Cost: US$ 36.20 Million
Evaluated staff performance through regular reviews, identifying areas for improvement while recognizing achievements that contributed positively to the department''s mission
Assisted in budget planning and management, allocating resources strategically for optimal department performance
Mentored new recruits during their probationary period, offering guidance on policy adherence, tactical skills, and professionalism within the force
Coordinated multi-agency operations for complex cases, sharing information efficiently while protecting sensitive data
Collaborated with multiple departments to develop effective strategies for case management and resource allocation as DRE
Survey Finalizations
Budget /bill checking
Material Engineer
HBK- QATAR
Doha
01.2011 - 06.2011
Of Assignment or Project: Construction Supervision for Development of Main Highways at Zone 46 (reconstruction of the Najma Road) including E- Ring Road (West of Najma) in Doha, Qatar; Domestic funded project, executed under FIDIC condition of contract
(Asphalt Concrete Road Work)., ASGHAL
Main project features: Project Length: 120 Km; 4- lane; Flexible Pavement (Asphalt Concrete Road Work).; Project Cost: US$ 120.52 Million, Improved material selection process by conducting thorough research on various materials and their properties
Designed and implemented advanced material characterization techniques to better understand material behavior under various conditions
Collaborated with cross-functional teams to optimize material usage and reduce production costs
Developed comprehensive training programs aimed at increasing staff knowledge of material science, contributing to a more skilled and efficient workforce
Spearheaded the development of new materials that met stringent industry standards for performance, safety, and environmental impact
Developed innovative solutions for material challenges, resulting in increased product lifespan and durability
Conducted failure analysis investigations to determine root causes of material-related issues, leading to improved product quality and reliability
Pavment-Material Engineer
NICE PVT LTD
04.2007 - 01.2011
SISTER CONCERN AARVEE ASSOCIATES HYDERABAD, Name of Assignment or Project: Construction Supervision for 4 laning of Widening & Strengthening of existing two lane to 4 lane from Km 336.00 to Km 463.6 of National Highway NH-7 (Sector 2, N-S Corridor) in the state of Andhra Pradesh and Karnataka; (Asphalt Concrete Road Work
Pavement cum Material Engineer
Andhra Pradesh
04.2007 - 01.2011
National Highways Authority of India
Main project features: Project Length: 120 Km; 4 lanes; Flexible Pavement (Asphalt Concrete Road Work); Project Cost: US$ 155.44 Million, As PME was responsible for reviewing the test results of bore holes, quarry and borrow area material, checking quality assurance aspect of the construction works and supervise the setting-up of the impact rock crusher and bituminous concrete hot mix plants, Quality Control and Material Testing, establishing all required materials sampling and testing procedures, Testing the soils and other materials by carrying out various tests to determine their suitability and ensure that the material testing and sampling are in accordance with specifications
Responsible for inspecting the Contractor's field laboratories to ensure that they are adequately equipped and capable of performing all the specified testing requirements of the contract and looking into the quality assurance aspect of the construction works and supervise the setting-up of the various Concessionaire's rock crushers and bituminous mixing plants to ensure the specified requirements are fully met with contractual equipment
He is also responsible for supervising all the tests to be done in different stages of construction, besides ensuring that specified tests are done as per codal stipulations and as per the specifications laid down in the contract for all the different stages of construction
Also supervised setting up and running of field laboratories, its running, Inspection of the field laboratories to ensure that they are adequately equipped and capable of performing all the specified testing requirements of the contract
Review and acceptance of mix design, maintaining records of test results, calibration of lab
Equipment
Preparation and implementation of Quality Control Aspects and Quality Assurance Programme using modern technology
Responsible for checking crusher for aggregate quality and production, checking HMP and concrete plant for calibration and capacity etc
Name of Assignment or Project: Construction supervision for 2 laning of Wataman-Pimpri section of Highway SH-6 from km
69.00 to km 94.00 and Dholka-Bagodra section of SH-16 as part of Gujarat State Highway Project
Phase II B for GSHP-13, in the state of Gujarat, executed under FIDIC conditions of contract; (Asphalt Concrete Road Work
Quality Control Engineer/ Material Engineer
Roads and Buildings Department
12.2003 - 04.2007
Gujarat
Main project features: Executed under FIDIC conditions of contract; Length: 48 Km; 2 lane; Flexible Pavement (Asphalt Concrete Road Work); Project Cost: US$ 28.93 Million;, Inspected raw materials and finished products to verify quality and disposed items that did not meet safety requirements
Maintained detailed records on all quality-related matters for easy retrieval during audits or investigations if needed
Reviewed and validated quality requirements for manufacturing planning, supplier purchase orders, and engineering specifications to meet contract compliance regulations
Performed quality control audits on pre-production supply chain, verifying continuity of raw materials
Documented and executed detailed test plans and test cases and summarized and logged audit findings for reporting purposes
Developed and audited practices, programs, and reporting system metrics for optimal efficiency
Quality Control Engineer/ Material Engineer
NICE PVT LTD
02.2001 - 11.2003
Sister Concern AARVEE ASSOCIATES)
NAME OF ASSIGNMENT OR PROJECT: Construction Supervision of Various State Highway sections including Bridges as part of Andhra Pradesh Economic Re- structuring Project, Phase- 2 at Karimnagar District in the state of Andhra Pradesh; (Asphalt Concrete Road Work, GovtOf Andhra Pradesh, PROJECT FEATURES: Project Length: 120 Km; 2 lanes; Flexible (Asphalt Concrete Road Work)/Rigid Pavement; Project Cost: US$ 21.49 Million
He was responsible for supervise the setting-up of the various rock crushers and bituminous mixing plants to ensure that the specified requirements for such equipments are fully met
Latest Quality Management techniques have been used during construction of highly projects
Quality Control and Material Testing, Establish quality assurance programs for construction of the highway as per the specifications /standards of MORTH and other internationally accepted best practices
Supervise setting up, organization and layout of contractor's field laboratories to ensure they are adequately equipped and capable of performing all specified testing requirements of the contract
Quality Control and Testing the soils and other materials by carrying out various tests to determine their suitability and ensure that the material testing and sampling are in accordance with specifications; Monitor mobilization of the testing equipment and ensure that the same are being mobilized in accordance with the specified testing equipment of the project
Supervise functioning of the laboratories and ensure that they are staffed with qualified personnel and equipped with duly calibrated testing equipment
Review test results of quarry and borrow area soil.
Material Engineer
MRC/SHELADIA USA/PBI JV
05.2000 - 01.2001
Name of Assignment or Project: Preparation of Detailed Project Report and Feasibility Study for Rehabilitation and Upgrading to 4/6 lane of Ichapuram- Khurda town section from Km
233.000 to Km
388.000 of National Highway NH-5 (package VI) in the states of Andhra Pradesh and Orissa; Pavement (Asphalt Concrete Road Work)
As Material Engineer was responsible for reviewing the test results of bore holes, quarry and borrow area material, checking quality assurance aspect of the construction works and supervise the setting-up of the impact rock crusher and bituminous concrete hot mix plants, Quality Control and Material Testing ,establishing all required materials sampling and testing procedures, formats recording and approval criteria
Responsible for inspecting the Contractor's field laboratories to ensure that they are adequately equipped and capable of performing all the specified testing requirements of the contract and looking into the quality assurance aspect of the construction works and supervise the setting-up of the various rock crushers and bituminous mixing plants to ensure the specified requirements are fully met with contractual equipments
Testing the soils and other materials by carrying out various tests to determine their suitability and ensure that the material testing and sampling are in accordance with specifications; He is also responsible for supervising all the tests to be done in different stages of construction, besides ensuring that specified tests are done as per codal stipulations and as per the specifications laid down in the contract for all the different stages of construction
Also supervised setting up and running of field laboratories, its running, Inspection of the field laboratories to ensure that they are adequately equipped and capable of performing all the specified testing requirements of the contract
Review and acceptance of mix design, maintaining records of test results, calibration of lab
Equipment
Preparation and implementation of Quality Control Aspects and Quality Assurance Programme using modern technology
Responsible for checking crusher for aggregate quality and production, checking HMP and concrete plant for calibration and capacity etc
PROJECT NO.11
NAME OF ASSIGNMENT OR PROJECT: Preparation of Detailed Project Report and Feasibility Study for Rehabilitation and Upgrading to 4/6 lane of Ichapuram- Khurda town section from Km
233.000 to Km
388.000 of National Highway NH-5 (package VI) in the states of Andhra Pradesh and Orissa; Pavement (Asphalt Concrete Road Work).
Material Engineer
M/s. KMC Constructions Ltd
06.1999 - 05.2000
Preparation of Detailed Project Report and Feasibility Study for Rehabilitation and Upgrading to 4/6 lane of Ichapuram- Khurda town section from Km
233.000 to Km
388.000 of National Highway NH-5 (package VI) in the states of Andhra Pradesh and Orissa; Pavement (Asphalt Concrete Road Work)
Supervised work of technologists, technicians and other engineers and scientists
Planned and evaluated new projects, consulting with other engineers and corporate executives as necessary
Gathered and organized material samples to use in third-party testing, evaluated results and reported on findings to optimize materials choices
Gathered documentation such as photographs and evidentiary reviews and generated detailed reports outlining findings
Investigated requests for deviations from established materials or suppliers and made appropriate approval or denial judgments
Collaborated with cross-functional teams to optimize material usage and reduce production costs
Designed and implemented advanced material characterization techniques to better understand material behavior under various conditions
Quality Control Engineer and Material Engineer
M/s. KMC Constructions Ltd
06.1998 - 05.1999
Of Assignment or Project: Preparation of Detailed Project Report and Feasibility Study for Rehabilitation and Upgrading to 4/6 lane of Ichapuram- Khurda town section from Km
233.000 to Km
388.000 of National Highway NH-5 (package VI) in the states of Andhra Pradesh and Orissa; Pavement (Asphalt Concrete Road Work)
Inspected raw materials and finished products to verify quality and disposed items that did not meet safety requirements
Maintained detailed records on all quality-related matters for easy retrieval during audits or investigations if needed
Reviewed and validated quality requirements for manufacturing planning, supplier purchase orders, and engineering specifications to meet contract compliance regulations
Performed quality control audits on pre-production supply chain, verifying continuity of raw materials
Conducted regular vendor evaluations to maintain supplier performance standards and drive ongoing improvements in component quality
Ensured consistent product performance by routinely calibrating equipment, monitoring test results, and adjusting processes accordingly
Institution of Engineers (India), M-147305-5, Life Member
Indian Road Congress, India, 103098, Life Member
Indian Geotechnical Society, India, LM-2099, Life Member
Accomplishments
Conducted Seminar on 'Material Characterization' for Panchayat Raj Engineering Department officials of Andhra Pradesh (at NIT Warangal) Sponsored by NRRDA on 10/22/2003
Attended online Seminar on Review of Highway Design conducted by LEA HO-Delhi
Attended online Seminar on Review of Bridge Design conducted by LEA HO -Delhi
Attended online Seminar on Pavement Design conducted by LEA HO-Delhi
Attended online Seminar on Contract Management for EPC projects conducted by LEA HO-Delhi
Senior Engineer (Geomatics) at LEA Associates South Asia Pvt. Ltd. (A LEA Group of Company)Senior Engineer (Geomatics) at LEA Associates South Asia Pvt. Ltd. (A LEA Group of Company)