Ardent fan of Magnus Carlson and FIDE rated chess player
Experienced crew management personal with hands on latest technology and aviation softwares. Excellent reputation for resolving problems and improving crew satisfaction.
Achievements:
● Recognized for cost saving pairings and crew routes.
● Increased the efficiency of the pairings to 4.3 Avg. Block/ Trip Day and improved the productivity of
the cabin crew.
● Liaised between Cabin crew and management to improve the Quality of Life.
● Successfully tested the complete package of planning and scheduling version releases from AIMS
(Airline Information Management System).
● Successfully tested the complete package of ADOPT optimizer for crew pairings.
Responsibilities:
● Conceptualized models to study, analyze, predict and estimate crew head counts, crew training
ancillary cost- layover cost, deadheading cost and transport cost.
● Specialized in AIMS software for rostering, pairing and scheduling modules.
● Knowledge of AD-OPT pairing optimizer for developing pairings.
● Conceptualized and analyzed changes in internal scheduling, planning buffers, future rules and
company policies.
● Strategized and developed processes and functions for developing rosters based on different
parametrical conditions like bases, ranks etc.
● Coordinating and working closely with the Director- Crew Resource and Planning, VP- Operation
Control Center and other stakeholders
● Analyzed, rectified and recommended the errors on system generated deadheads and layover.
● Predicted and estimated the Head Count requirement utilized for flying operations to meet the
commercial plan and company requirements.
● Conceptualized and developed optimal pairings to yield better productivity & resource
utilization.
● Liaised with training department, scheduling and in-flight services for predicting the optimal crew
required post activities like training, leave and stand-by.
● Scenario evaluations of rosters with the objective of block distribution variance and 100% flight
coverage
● Analyzed, evaluated and validated the crew rosters to meet the KPI objective of roster metrics
● Conceptualized and estimated the Headcount requirement to meet the operational needs
● Ensured required stand-by blocks/reserve patches provided by the Resource Plan are built within
resource targets to achieve optimum coverage for each crew workgroup on N/A.
Crew scheduling
Ardent fan of Magnus Carlson and FIDE rated chess player
Participated at Malaysian National Sports day(chess)
TATA TOMORROW UNIVERSITY COURSES on Digital transformation and people development