Summary
Overview
Work History
Education
Skills
Additional Education
Handling of Program Control
Languages
Personal Information
Disclaimer
Timeline
Generic
A.Amul Doss

A.Amul Doss

Chennai

Summary

To attain a challenging and responsible position through work excellence and hard working good interpersonal skills, ability to work and interact well with team members. Highly-motivated employee with desire to take on new challenges. Strong work ethic, adaptability, and exceptional interpersonal skills. Adept at working effectively unsupervised and quickly mastering new skills.

Overview

20
20
years of professional experience

Work History

Engineer - Vendor Development

ANVAL VALVE PVT LTD
Chennai
09.2022 - Current
  • Developed and implemented engineering strategies to improve production efficiency.
  • Working closely with vendors on a daily basis.
  • Helping with planning and creating the vendor management procedures, policies, and programs.
  • Aiding with vendor selection and negotiation processes.
  • Monitoring vendor risk management even after the contract is completed.
  • For example, observing performance levels and analyzing current due diligence.
  • Communicating with all departments within the enterprise, such as internal audit and senior management, etc. To monitor tasks.
  • Maintaining an effective database of all relevant information related to third parties, and communicating the same information to senior management, stakeholders, and the board.

Junior Engineer - Production Planning

ANVAL VALVE PVT LTD
Chennai
09.2020 - 09.2022
  • Create optimized schedules that balance production efficiency and delivery performance.
  • Maximize throughput on bottleneck resources to increase revenue.
  • Synchronize supply with demand to reduce inventories.
  • Provide company-wide visibility to resource capacity.
  • Enable scenario data-driven decision making.
  • Collaborated with other departments on cross-functional initiatives.
  • Implemented cost-saving measures that improved efficiency within the department.
  • Created accurate project specifications, documenting in technical manuals.
  • Conducted analyses addressing failure, reliability or yield improvement.

Machine Shop Supervisor

ANVAL VALVE PVT LTD
Chennai
09.2018 - 09.2020
  • Trained new employees on the use of equipment, tools, and safety procedures.
  • Provided technical support to machinists regarding complex operations involving CNC lathes, mills, grinders, drill presses.
  • Reviewed drawings and blueprints for accuracy prior to beginning a job.
  • Held regular meetings with staff members to discuss issues or concerns related to production goals.
  • Analyzed shop floor operations looking for opportunities to reduce costs or improve efficiency.
  • Ensured that all safety rules were followed by workers while operating machinery.
  • Troubleshot machine malfunctions and took corrective action when needed.
  • Maintained accurate records related to production output, downtime, inventory levels.
  • Compiled reports on machine performance data for management review.
  • Performed maintenance tasks on machines such as lubricating parts and replacing worn components.

Setter and Programmer

ANVAL VALVE PVT LTD
Chennai
08.2017 - 09.2018
  • Monitor machine operations and adjust settings as needed to ensure quality standards are met.
  • Inspect finished products for defects and make necessary corrections.
  • Perform daily maintenance on molds, tools, and machines.
  • Ensure that all safety protocols are followed while operating machinery.
  • Communicate with supervisors regarding progress and issues with production runs.
  • Identify defective parts produced by machine and take corrective action as required.
  • Recommend modifications for improved efficiency or cost savings.
  • Maintained neat and clean workspaces to prevent safety issues.
  • Troubleshot and resolved problems with tools, instruments, and gauges.
  • Tracked machine's overall yield and quality of product to reduce scrap.
  • Adjusted daily work procedures to meet schedules and maintain product quality standards.

5 Axis Setter and Operator

MENCAST PVT LTD
Singapore
03.2014 - 03.2016
  • Set up and operate injection molding machines to produce parts or products according to customer specifications.
  • Inspect finished products for defects and make necessary corrections.
  • Perform daily maintenance on molds, tools, and machines.
  • Ensure that all safety protocols are followed while operating machinery.
  • Communicate with supervisors regarding progress and issues with production runs.
  • Inspected finished products for defects and conformity to specifications.
  • Adjusted daily work procedures to meet schedules and maintain product quality standards.

4th Axis Setter and Operator

HAMWORTHY PVT LTD
Singapore
08.2007 - 01.2012
  • Identify defective parts produced by machine and take corrective action as required.
  • Learned additional tasks to back up team members.
  • Measured and inspected products for surface and dimension defects to verify conformance to specifications.
  • Set appropriate stops and guides to specified lengths as indicated by scale, rule or template.
  • Positioned and secured workplaces on machines to start feeding mechanisms.
  • Observed machine operations to detect problems and make necessary adjustments to correct issues.
  • Performed routine preventive maintenance and upkeep of production equipment to maximize performance and minimize downtime.
  • Monitored material inventories for supervisor.

3rd Axis VMC and VTL Operator

GEEKAYS AUTO COMPONENTS
Chennai
06.2004 - 09.2006
  • Performed routine maintenance on equipment to ensure optimal performance.
  • Maintained cleanliness of work area and equipment in accordance with safety regulations.
  • Checked product quality against specified standards at each stage of production process.
  • Reported any discrepancies or abnormalities in the production process immediately to supervisor.
  • Provided training assistance to new operators on proper machine operation techniques.
  • Maintained production and quality documentation.
  • Checked control panel and gauges during equipment operation.
  • Followed daily preventive maintenance schedule for cleaning and lubricating machinery.
  • Met or exceeded target for on-time customer shipments.

Education

Diploma - Mechanical Engineering

Sri Ayyappa Polytechnic College
Cuddalore
04-2004

Skills

  • Process Improvement
  • Quality Assurance Controls
  • Cost Analysis
  • Root Cause Analysis
  • Resource Planning
  • Vendor assessment
  • Problem-solving abilities
  • Strategic planning abilities

Additional Education

Ministry of Small Scale Industries

CNC PROGAMMING AND OPERATION - Chennai

June - 2004

EastWest Education Centre

UNIGRAPHICS NX4 - Singapore

September - 2008

Handling of Program Control

MAZAK

FANUC

MITSUBISHI

TOSHIBA

SIEMENS

HASS

Languages

English

Tamil

Personal Information

Passport Number: F236227

Date of Birth: 12-06-1984

Nationality: Indian

material status: Married

Disclaimer

I hereby declare that the above particulars are true and correct to the best of my knowledge and belief.

Timeline

Engineer - Vendor Development

ANVAL VALVE PVT LTD
09.2022 - Current

Junior Engineer - Production Planning

ANVAL VALVE PVT LTD
09.2020 - 09.2022

Machine Shop Supervisor

ANVAL VALVE PVT LTD
09.2018 - 09.2020

Setter and Programmer

ANVAL VALVE PVT LTD
08.2017 - 09.2018

5 Axis Setter and Operator

MENCAST PVT LTD
03.2014 - 03.2016

4th Axis Setter and Operator

HAMWORTHY PVT LTD
08.2007 - 01.2012

3rd Axis VMC and VTL Operator

GEEKAYS AUTO COMPONENTS
06.2004 - 09.2006

Diploma - Mechanical Engineering

Sri Ayyappa Polytechnic College
A.Amul Doss