AUTOCAD
OBJECTIVE Seeking for a challenging position as a Civil Engineer, where I can use my planning, designing and overseeing skills in construction and help grow the company to achieve its goal.
PROJECT TITLE: CONSTRUCTION OF CIVIL WORK IN RE PROJECT BETWEEN BANIHAL BARAMULLA SECTION, CONSTRUCTION OF PRECAST RCC BOUNDARY WALL & BOUNDARY PILLARS FROM ARPINCHALA YARD TO BRIDGE No.145 B, BANIHAL (CHAINAGE KM 123/920 TO KM 150/440) & STRENGTHENING AND IMPROVEMENT OF EXISTING APPROACH ROAD FROM HOLINA & NH 44 TO TUNNEL T-74R (NORTH) ON USBRL PROJECT, J&K (PACKAGE: RE & PROTECTION WORKS)
CLIENT: IRCON INTERNATIONAL LIMITED
ROLE: SITE ENGINEER & BILLING ENGINEER
· Supervision and execution of checking of reinforcement laying operation and technical specifications
· Checking of formwork ,shuttering, reinforcement of COLUMN,BEAM,SLAB,FOOTING etc
· Preparation of bar bending schedules working drawings as per D.P.R drawings.
· Checking the adequacy of form work, laying of concrete including curing operation
· Checking and controlling the proper mix designs.
· Submissions of client RA/Final Bill
· Responsible for study of BOQ (Bill of Quantity) as per specifications and taking out
Quantities from drawings
· Preparation and Certification of RA bills.
· Identification and preparation of extra items.
· Preparation of monthly reconciliation statement of building material.
· Responsible for verification of certified RA bills.
· Preparing all billing records and marinating it.
· Proper entering of bills without errors
PROJECT TITLE: Construction Of 6 Lane Nh-334m-Package-3 From Nagloi Najafgarh Road, Km 28+450 To Dwarka Sector 24 Road, Km 38+111 In The State Of Delhi On EPC Mode.
CLIENT: National Highway Authority of India (NHAI)
ROLE: SITE ENGINEER
· Supervision and execution of checking of reinforcement/cables laying operation and technical specifications
· Checking of formwork ,shuttering, reinforcement of Box Culvert, MNB,VUP,FLYOVER
· Preparation of bar bending schedules working drawings as per D.P.R drawings.
· Preparation of staging drawings load calculation as D.P.R. drawings
· Checking the adequacy of form work, laying of concrete including curing operation
· Checking and controlling the proper mix designs.
PROJECT TITLE:
Redesigning, Rehabilitation and Up-gradation to Four Lane Configuration & Strengthening of SONEPAT ROHANA Section (Package-1 KM 0.000 to KM. 44.800) of NH-334B in the State of Haryana.
CLIENT: National Highway Authority of India (NHAI)
ROLE: SITE ENGINEER
· Supervision and execution of checking of reinforcement/cables laying operation and technical specifications
· Checking of formwork ,shuttering, reinforcement of Box Culvert, MNB,VUP,FLYOVER
· Preparation of bar bending schedules working drawings as per D.P.R drawings.
· Preparation of staging drawings load calculation as D.P.R. drawings
· Checking the adequacy of form work, laying of concrete including curing operation
· Checking and controlling the proper mix designs.
AUTOCAD
MS EXCEL
MS WORD
MS POWERPOINT
ETABS