Certified Project Management Professional and Plant Manager with 15 plus years of experience working with teams to accomplish short- and long-term project goals. Managed budgets and monitored project costs with extended record of excellence in leading the Complex and Challenging Projects in Oil & Gas Modular Skids Package, Surge Relief Skids, Chemical Injections Skids, Utilities & Instruments Air Receiver Skids & Truck Loading Skids, Metering Skids, Fabrication and Installation of Pipe Spools/Pipelines, Storage Tanks, Column & Pressure Vessels, Pipe Rack Modules, Heavy Structures Steels, Maintenance and Shutdown Projects like recondition of Pipelines, Storage Tanks and Reactors from the ideation through to completion. Well – Experienced in delivering projects on time, within budget and with the desired outcomes aligned to the End User Objective.
Project Management
undefined1) Problem: Engineering NMR documents approval from client and material delivery from sub-vendors delayed the Project Schedule and Production.
Action Taken: Expedited NMR approval from client and material delivery from sub- vendors and Supplier, Started parallel production activities. Thus achieved the project and operation objectives.
Result: Project completed on schedule & received Appreciation certificate from the Saudi Aramco for shut down project of "Replacement of Pressure Vessels-Hawiyah and Uthmaniah GOSPs.
2) Improved project margins by 5- 8 % with the aid of meticulous planning,
3) Reduced Project expenses by 10 % by Process improvement and eliminating waste.
4) Identified mechanical & procedural limitations that were hurdles for work efficiency.
5) Certificate of recognition (twice) from Saudi Aramco.
6) Certificate of Appreciation from MMQ Sons, Saudi Arabia.
7) Recognition from GSW management for high standards of performance and commitment.
Project Management Professional PMP
LIST OF PROJECTS EXECUTED:
1) Column for Marjan Gas Plant (Quantity- 2 Nos. Ea). Client: Técnicas Reunidas, End User: Saudi Aramco
2) Pressure Vessels-Marjan increment package-9 &11(Qty-6 Ea). Client: Técnicas Reunidas/ Aramco.
3) Flash Gas Absorber/Amine Flash Absorber/ Amine Regeneration Reflux Drum -Marjan Increment
package-10 (Qty-9 Ea). Client: SAIPEM, End User: Saudi Aramco.
4) Desalter Pressure Vessels-Uthmaniah GOSP-10 (Qty-1 Ea.), Client: GSCC, End User: Saudi Aramco.
5) Pressure Vessels for Jafurah Gas Processing: Client: SAMSUNG, End User: Saudi Aramco
• Inlet Condensate Separator (Qty-2 Ea). • Condensate Separator (Qty-2 Ea).
• Amine Flash Drum (Qty-2 Ea). • Flash Gas Absorber (Qty-2 Ea).
• Amine Sump Drum (Qty-2 Ea). • Hydrocarbon Skim Drum (Qty-2 Ea).
• Regeneration Gas Compressed Suction KO Drum (Qty-2 Ea).
• Dehydration Steam Condensate Pot (Qty-4 Ea).
• Propane Drain Drum (Qty-2 Ea). • Demethanizer Reboiler Condensation Drum (Qty-2 Ea).
6) DS-B Collection Vessel (Qty-1 Ea). Client: SICIM, End User: Saudi Aramco
7) Pressure Vessels - Dew Point Control Unit (Qty-6 Ea). Client: PENTAR, End User: Saudi Aramco
8) Pressure Vessels - Jafurah Gas Compression Plant (Qty-11 Ea). Client: L & T, End User: Aramco
9) Pipe rack modules – Saudi APCC PDH Pipe Rack (Qty-10 Ea). Client: SAMSUNG, End User: Aramco
10) Pipe rack and Equipment modules – Dew Point Control Facilities Shaybah NGL Modules (Qty-73 Ea).
Client: WISON Engineering Ltd, End User: Saudi Aramco
11) Surge Relief Skids (Qty- 6 Nos Ea.)
12) Corrosion Inhibitor Skids (Qty- 14 Nos Ea.)
13) Corrosion Inhibitor Skids (Qty – 5 Nos Ea.)
14) Slope Injection Skid (Qty – 1 No)
15) Gas modular/OPTF/Annuli Riser Skids (Qty-5 Nos Ea.)
16) C.S Pressure Vessel. (QTY-70 Nos Ea.), Client: TECNICAS REUNIDAS
Project: Marjan Increment Program - Tanajib Gas Plant Project PK9 & 11
17) S.S Pressure Vessel (QTY-8 Nos Ea.), Client: TECNICAS REUNIDAS
Project: MARJAN INCREMENT PROGRAM - TANAJIB GAS PLANT PROJECT PK9 & 11
18) C.S Pressure Vessel (QTY-4 Nos Ea.), Client: M.R. Al Khathlan Co. for Contracting
19) Oil Modular Skids For Harad: (QTY-10 No Ea.), Client: Saudi Aramco
20) Utility and Inst. Air Receiver Skids (QTY-4 No Ea.), Client: Saudi KENTZ
19) C.S Pressure Vessel: Wet Compressor (18 Nos) / Nitrogen Receiver (9 Nos Ea.) / Instrument Air
Receiver (18 Nos) (QTY-45 Nos Ea.), Client: TECNICAS REUNIDAS
20) S.S Pressure Vessel: Corrosion Inhibition (QTY-26 Nos Ea.), Client: TECNICAS REUNIDAS
21) Gas Modular Skids, OPTF Skid, Annuli Riser Skids: Project Value SAR 300 Million (Qty-51 Nos.)
22) Ainder, Harad, Khurais: Oil & Gas modular skid: project value 350 million (qty-33 & 40 nos.)
23) Oil (Khurais)& Gas modular skid: project value 220 million (Qty-45 & 10 nos.)
24) Methanol injection skids: project value 40 million (Qty-40nos.)
25) Corrosion and scale inhibitor injection skids: (Qty-4 nos.)
26) Khuff gas: chemical injection skid (qty-70 nos.): project value 30 million
27) Waqar & Harad manifolds: chemical injection skid (Qty-02 nos.)
28) Marjan-GOSP-1, ZULUF-GOSP-2, ZULUL-GOSP-3: chemical injection skid (Qty-03 nos.)
29) Rasatanura refinery plant: Diesel truck loading skid (Qty - 2nos)
30) Installation and Recondition of Pipelines. Client: SAUDI ARAMCO
31) Project: Elena Power and Infrastructure Limited. (5 X 270 MW), India, Client: India Bulls Power
32) Acid Storage Tanks Project. Client: SWCC Jeddah, KSA
33) Fabrication of Diesel and Crude oil Storage Tanks. Client: SECO, KSA
Business Management from Indian Council for Technical Research & Development (ICTRD)
Lean Six Sigma Green Belt from Q.H.S.E Learning Centre.
ISO Certified for ISO9001:2015 from Q.H.S.E Learning Centre.
ISO Certified for ISO14001:2018 from Q.H.S.E Learning Centre.
CSPO - Certified Scrum Product Owner - Master Id -001521679
CSM- Certified Scrum Master Id -001160769
Project Management Professional PMP
• Gender : Male / 41 (Born in 1982) • Notice Period : Immediate • Nationality: Indian
• Passport valid up to May 2028 • Marital Status: Married • Possess Saudi Driving License
• Gender : Male / 40 (Born in 1982) • Notice Period : Immediate • Nationality: Indian
• Passport valid up to May 2028 • Marital Status: Married • Possess Saudi Driving License