Primavera P6 2019
Organized Planning & Scheduling and exceptional multitasker with top-notch verbal and written communication skills. Offering over 5 years of hands-on experience in collecting, analyzing and recording data on progress of planning permission applications and responding to queries about planning permission application process. and over 7 years of hands-on experience in Execution Piping spools fabrication and erection, Equipment erection and overhauling Project & Shutdown field gas, oil Refinery and Green Projects.
OQ Methanol and Ammonia Unit Planning and Scheduling Column, Vessel, Drum, Filter, Reformer, Heat Exchanger Overhauling and Piping MOC Works M&A TA 2023.
Column, Vessel, Filter, Heat Exchanger Overhauling, Piping Loops Hydrotesting and Heat Exchanger Replacement Shutdown Works MRPL TA 2023.
Revamp Project Piping Fabrication & Erection, Equipment & Rotary Erection Lobs Revamp Project BPCL MR 2021
Column, Vessel, Filter, Heat Exchanger Overhauling, Piping Loops Hydrotesting and Heat Exchanger Replacement Shutdown Works IOCL TA 2021
Column, Vessel, Drum, Filter, Heat Exchanger Overhauling, Piping Loops Hydrotesting and Heat Exchanger Replacement Shutdown Works CPCL TA2021
OSBL Piping Replacement & MOC Work ARC Job.
CCR Unit Heater, Column, Vessel, Filter. Drum & Heat Exchanger Overhauling and Piping Loops MOC, Replacement and Hyrotesting TA 2019
NFCC Unit Superheated IBR Piping Fabrication And Erection Works ARC Job.
Reformer Steam boiler Replacement Shutdown TA 2018
CDU- VDU Unit Heater Coil Replacement, Vessels, Filter, Drum, Heat Exchanger Overhauling and Piping Replacement, MOC and Piping Loops Hydrotesting Shutdown TA 2018.
KNPC Super Heater with Duplex Coil Fabrication 3 qty. 6 Month Project.
FCC UNIT Reactor Replacement TA 2017
CDU-VDU Unit Heat Exchanger & Finfan Exchanger Re-tubing Work TA 2017.
Heater Coil Replacement Works 2017
GCU Unit Piping MOC Fabrication & Erection Works TA 2017
CDU-VDU Unit Piping MOC Job and Column, Vessel Patchwork Works TA 2017
KNPC Piping Fabrication and BORL Module Piping Fabrication and Erection 8 Month Project.
SRU-1 Piping Erection, Mechanical Clearance, Hydrotesting and Pre-Commissioning 3 Year Project.
LTPC Piping Spools Fabrication and Hydrotesting 1 Year Project.
Fire -Fighting Piping Spools Fabrication and Erection 1 Year Project.
LTPC Piping Fabrication 1 Year Project.
Piping Spools Erection 5 Years Project.
Piping Spools Fabrication and Erection 2 Years Project.
Piping Spools Fabrication and Erection 1 Years Project.
Project & Shutdown Scheduling in Primavera P6
Vill.: Tiwari Mahamad Pur
PO.: Chacwand
Dist.: Pratapgarh
State: Uttar-Pradesh
Pin Code: 230129
Name: ABHAY CHANDRA PATEL
Date of Birth: 01/06/1986
Sex: Male
Nationality: Indian
Marital Status: Married
Father: Heera Lal Patel
Father’s Occupation: Government Job.
Primavera P6 2019
Microsoft Project MSP 2018
1. Planning:
· Scope Definition: Clearly define the scope of the turnaround, outlining the specific maintenance, inspection, and repair activities required.
· Budgeting: Develop a comprehensive budget considering resources, materials, and potential risks to ensure financial feasibility.
· Risk Assessment: Identify potential risks and develop mitigation plans to address safety, environmental, and operational concerns.
· Resource Allocation: Determine the human resources, equipment, and materials needed for the turnaround.
· Communication: Establish clear communication channels with all stakeholders to ensure everyone is informed about the planned shutdown.
2. Scheduling:
· Critical Path Analysis: Identify critical activities and their dependencies to create a realistic and achievable schedule.
· Resource Leveling: Optimize resource utilization by leveling workloads and avoiding resource bottlenecks.
· Sequence of Work: Establish the most efficient sequence for completing tasks, considering dependencies and constraints.
· Shutdown Timeline: Develop a detailed timeline for the shutdown, including start and end dates for each phase.
· Contingency Planning: Anticipate potential delays and develop contingency plans to minimize the impact on the overall schedule.
3. EXCUTION
· Monitoring and Executing all Heater Activities like Radiant Panel and Convection Modules, Arch, Breeching Section, Duct, Stack, FD Fans, ID Fans Erection and Assembly Works.
· Monitoring and Executing Heater Refractory works both Castable and Ceramic Modules Type.
· Monitoring and Executing Heater Insulation Works for Piping and Duct.
PIPING WORKS
· Fabrication, Erection, Hydro testing & Commissioning of different type of Piping System.
· Visual inspection and Hydro testing. (Punch list & Clearance, test pack preparation, Tie in Joint Final Box up.)
· Preparation of ISOMETRIC drawing w.r.t. G. A.Drawing.
· Fit up inspection, Alignment, Dimension, Visual, material verification & final spool clearance as per isometric drawings.
· Marked and Verified Piping loops as Per Piping Systems.
· Familiar with GAD, PFD, P&ID & Isometric Drawings.
· Familiar with Materials like Carbon steels (CS-A106Gr-A, B, C), Stainless Steels (SS-SA-304,316), Monel (UN04400), Inconel (UN06600).
· Familiar with application of international standards for process piping like, ANSI/ASME b 31.3/31.1 and ASTM specifications, with basic knowledge of ASME b16.5, AMSE b16.9, ASME b16.11 etc.
· Executing sequential erection of piping spools & supports in pipe racks & various equipment’s in Above ground and Underground piping unit.
· Monitoring and Executing Insulation Works for Process Piping.
· Making execution plan of job and do all activities to achieve the targets if fails to achieve then conclude the reason behind and solve the same.
· Participate in internal review meetings.
· Detailed BOQ including piping and structure work.
· Responsible for materials follow-up for continuous supply and smooth fabrication as well as erection.
· Ensure that the work is carried out as per standards, drawings, maintaining quality & safety.
· Contractors Billing as well as Company Billing.
Reporting to Project Manager on day-to-day work progress and request for additional resources to meet the work load and client site instruction.
I consider myself familiar with engineering aspects. I am also confident of my ability to work in a team.
I, hereby declare that all the information stated above is true to my knowledge and belief.
Place: Name: Abhay Chandra
Dtae: