
• Project 1
• timing closure during the ECO phase, resolving critical setup, hold, and transition violations .
• Eliminated DRC and Signal EM violations in high-density routing regions by implementing targeted physical fixes and optimizing wire geometries.
• Mitigated dynamic IR drop issues during late-stage ECOs by strategically inserting decoupling capacitors (decaps) and reinforcing the local power grid structure.
• Analyzed and resolved cross-talk and timing bottlenecks concurrently, ensuring a robust, violation-free design ready for final tape-out sign-off.
• Project 2
• Built custom clock for different clocks having multiple entry points to achieve proper latency .
• Automated pipe addition for compressor and decompressor paths .
• Built custom buffer bank for minimal cross-talk , opitimum delay paths for critical data path between pipe stages.