Summary
Overview
Work History
Education
Skills
Certification
Affiliations
Personal Information
Languages
Assignments
Timeline
Generic

Abhisek Mohapatra

Nimapara

Summary

Offering more than 12 years of experience in Project, installation, commissioning support & Detail Design and engineering for Instrumentation control and automation.

Overview

13
13
years of professional experience
1
1
Certification

Work History

Sr. Design Engineer for Instrumentation & Control

Atlas Copco Global engineering center
01.2023 - Current
  • Lead instrumentation and control for Gas and process division
  • Preparation of sketch, automation architecture, IO list, Instrument Index, Cable schedule, JB drawing, wiring diagram, Terminal details, Control Narrative, Detailing, testing and commissioning
  • Supporting commissioning team, Instrument selection, installation, troubleshooting
  • Understand the process criticality, Process safety in terms of process operation along with instrumentation Criteria with SIL level instruments, Cause & effect
  • Supporting customer with various problems, helping in Process risk assessment
  • Site visit review and FAT
  • Leading project, deliverables, roadmaps, specification and detailing of project task
  • Preparation of the schedule and BOM for cabling and instrumentation
  • Preparation of logic diagram and control philosophy as per the project
  • Preparation of RFQ, VDR, Cable scheduling, maintaining hazardous area specification as per standard
  • Basic engineering & Detail engineering for project and process
  • Project Review & Design Review
  • Commissioning support
  • Participate in vendor evaluation and pre-qualification process
  • Review Instrument Engineering standards and Design Guidelines

Projects

  • Samsung heavy industries crude oil ship utility including compressor & Booster. (Feb 24 to till)
  • Sonatrac oil refinery project for Compressor & Booster. (Aug 23 to Jan 24)
  • Pretrobrass Oil refinery Project. (Aug 23 to Feb 24)
  • EMIRATES Oil refinery project for compressor, N2 booster, Nitrogen gen generator. (June 24 to till)
  • ADNOC Oil refinery project for Snuffing compressor, N2 Booster, & expanders. (Sept 24 to till)
  • Reliance industries Hydrocarbon project. (June 24 to till)
  • IOCL project for hydrogen gas extraction. (Completed)

Instrumentation and Control Lead

Cargill India Pvt. Ltd.
01.2012 - 01.2023
  • Project Management & Detail Engineering
  • Participation in engineering P&ID, RFQ, BOQ, Design drawings
  • Installation of filed instrument, commissioning
  • Best maintenance techniques & engineering practice
  • Preparing and ensuring compliance to standard maintenance procedures, preventive, predictive maintenance schedules to increase machine, instruments uptime & equipment reliability
  • Proficient in Inventory Modeling, generating Purchase requisition and follow up of Purchase orders; development of equipment task list, Maintenance plan in SAP
  • Calibration procedure, strategically maintenance schedule and head to tail test of instruments
  • All instruments installation calibration
  • Automation loop check a control logic check-up
  • Detailing of CV, FT, Actuated valve, PT, TT & LS and maintenance
  • Knowledge about safety interlocks
  • Overall commissioning & troubleshooting
  • Detailing and trouble shooting of PLC panel
  • Safety and instruments safe installation as per P&ID and approved drawings
  • Timely review and tracking of engineering and execution progress against the budget and schedule baseline
  • Taking care of all best practice, standard and safety to be followed during engineering and construction
  • Developing maintenance procedure and operation standard for easy operation
  • Review of TBA & CBA
  • SAP Using for material tracking, service entry & budget
  • Techno commercial offer evaluation
  • Overall installation & commissioning
  • Preparation of CSD and calibration schedule
  • Intrinsic safety instruments
  • Hazardous area defined instruments with flame proof
  • Process Risk Analysis & LOPA
  • Continuous improvement project
  • Cause & effect diagram
  • Calibration and troubleshooting

PLC & DCS knowledge with Panels

  • SEIMENS MAKE S7-300, S7-400H with redundancy, S7-1500, S7-200
  • PILZ MAKE SAFETY PLC
  • RIO panel with redundancy module
  • Communication protocol
  • PI system installation
  • IOT
  • IDM Integrated data management system
  • Automation architecture

Efficiently construction & commissioning of the projects

  • High pressure hydrogenation plant
  • (2017-2021)
  • Refinery consolidation with capacity enhancement
  • (2015-2017)
  • FR3 transformer oil plant
  • (2014-2015)
  • Boiler enhancement project with conversion of bagasse to coal
  • (2017-2018)
  • Effluent treatment plant
  • Vacuum system for Distilled fatty acid plant
  • (2022-2023)
  • High pressure hydrogenation plant commissioning at Turkey (Delovasi Plant)
  • (2019 feb -march)
  • Hydrogen plant commissioning
  • (2022 sept- dec)
  • Thermic fluid boiler commissioning
  • (2023 jan-feb)

Education

3YearsDiploma -

Applied Electronics & Instrumentation

B. Tech -

Electronics & Telecommunication

Diploma -

operation management

MBA -

project management

Skills

  • Engineering & commissioning
  • Instrument selection
  • Installation
  • Commissioning
  • Field Instruments
  • Control equipment
  • P&ID
  • RFQ
  • BOQ
  • Design drawings
  • Engineering documents preparation
  • Inter lock list preparation
  • Cause & effect diagram preparation
  • Instrument procurement activities
  • Vendor Document review
  • Safety PLC
  • Capex & schedule tracking
  • Vendor assessment
  • Inspection of materials
  • Safety norms administration
  • Criticality Asset identification
  • CSD identification
  • Continuous improvement
  • Energy saving strategy
  • Trouble shooting
  • RCA
  • Equipment Criticality analysis
  • Risk rating
  • Reliability improvements
  • RCM principles application
  • Incident management
  • PRA
  • HAZOP
  • LOPA
  • Hazardous area instrumentation
  • Control loop
  • SIL Level of instruments
  • Calibration of instrumentation
  • Fire and Gas detection
  • Project Management
  • Design & Engineering
  • Problem analysis
  • Planning and organizing
  • Communication skills
  • Judgment and decision-making
  • Teamwork
  • Production

Certification

  • VLSI
  • Industrial Automation
  • Advance Diploma in Hardware-Networking
  • 30 Hours Construction Safety from Cargill

Affiliations

  • MSOffice
  • SAP
  • Excel
  • AutoCAD
  • Smart plant instrumentation

Personal Information

  • Date of Birth: 06/11/89
  • Marital Status: Married

Languages

  • English
  • Hindi
  • Oriya
  • Marathi

Assignments

Offering more than 12 years of experience in Project, installation, commissioning support & Detail Design and engineering for Instrumentation control and automation., Engineering & commissioning, Engineering site execution, instrument selection, installation, commissioning, Selection of instruments as per the process application, Experience of instruments like FT, PT, TT, LT & Level switches, installation & calibration with loop checking, Field Instruments and control equipment’s, Knowledge of instruments for high hazard process like Hydrogen, PRA, Knowledge of Hazardous area instruments like ATEX & FLAME PROOF, Experience in P&ID, RFQ, BOQ & Design drawings

Timeline

Sr. Design Engineer for Instrumentation & Control

Atlas Copco Global engineering center
01.2023 - Current

Instrumentation and Control Lead

Cargill India Pvt. Ltd.
01.2012 - 01.2023

3YearsDiploma -

Applied Electronics & Instrumentation

B. Tech -

Electronics & Telecommunication

Diploma -

operation management

MBA -

project management
Abhisek Mohapatra