Having 9.5 years of experience in construction field and Inspection had worked in Delhi Metro Project. At present working with M/s Nippon Koei India Pvt. Ltd. For DFCCIL (OHE & PSI) work at Vadodara as Assistant Manager/Electrical. I was also project Engineer of DMRC & BSES YMUNA POWER In Delhi. The detailed list of experience is attached separately.
Overview
10
10
years of professional experience
Work History
Engineer/Electrical
M/s Nippon Koei India Pvt.Ltd.
04.2019 - Current
PMC of Design, Construction, Supply, Installation, Testing and Commissioning of 2x25kv electrification and associated works of double track railway lines under construction, Rewari - Makarpura of Western Dedicated Freight Corridor
Follow up with vendor including manufacturing works visit and preparation of schedules, MOM and its monitoring to ensure timely work completion
Coordinating with project management, procurement and construction groups for scheduled and successful completion of the project
On-site technical issues resolution and co-ordinations with various contractors, so as to ensure the quality and timely completion of work
Coordinate, and resolve project related activities and issues with other multi-discipline project team members
Identify & implement the scope changes in terms of cost and project schedule
Construction support including resolving site queries, and performing site inspections during the construction phase of projects
Guide the assigned discipline engineers to align the engineering deliverables according to project requirements
Maintain quality and safety during execution of OHE & PSI work at site
Project Monitoring, Insuring field quality plan, coordination with client and contractor
Modification of old distribution system & Prepared infringement survey reports
All type of OHE structure foundation and Grouting work & Execution of Cylindrical foundations by using advanced machineries like tractor auger
Contact & Catenary wire stringing with real time tensioning simultaneously done by using OMEC machine Working experience with wiring deck, wiring deck with platform, truck mounted pal finger, UTV mounted Palfinger and KGT & Erection of all steel structures alignment containing Mast, Portals, Boom, SPS Erection and Cantilever
Stringing of Conductor consist of Feeder wire, Aerial earth wire, catenary wire & contact wire, Anti creep center wiring, buried earth conductor and return conductor, Bonding of structure and track
SED checking, Tower wagon checking, Megger of OHE and Earth fault test
Installation of neutral section - PTFE type and Section Insulators
Oliver G Checking & HOTO Verification
Site Supervision for Railway OHE Power Block Work
Portal and Mast Erection and wiring work at Power Block
Checking of LOPs, CSDs and SEDs
Experienced in working with multiple discipline projects
Erection, testing, and commissioning of 220kv/55kv Ringus Traction Substation, Srimadhopur North South SSP, Makarpura North & South SSP
Structure erection for HT side and LT of switching control posts
Erection of all structure & equipment, Stringing of Conductors with jumping, Erection of Control panel, relay Panel, Erection of ACDB & DCDB
Erection and commissioning of battery & battery charger
Complete Cable laying & termination of cable in Panel and equipment side
Testing & Commissioning of equipment
Engineer/Electrical (OHE)
M/s T&M Services Consulting Pvt ltd.
04.2018 - 03.2019
2x25kv electrification and associated works of double track railway lines under construction, Madar - Palanpur of Western Dedicated Freight Corridor
On-site technical issues resolution and co-ordinations with various contractors, so as to ensure the quality and timely completion of work
Maintain quality and safety during execution of OHE work at site
Project Monitoring, Insuring field quality plan, coordination with client and contractor
Modification of old distribution system
Prepared infringement survey reports
All type of OHE structure foundation and Grouting work
Site Supervision for Railway OHE Power Block Work
Portal and Mast Erection and wiring work at Power Block
Supervision, planning and execution of high rise overhead electrification work like mast erection, SPS, Bracket erection and wiring adjustment
Site supervision for OHE work, all General Electrical work
Preparation of pre-pegging plan and verification of pre-pegging plan at site
Engineer/Electrical
K.V.Prateek Enterprises
05.2016 - 03.2018
Mostly worked in PSI at BSES Ymuna power & Electrification work in DMRC Project
Erection of all structure, equipment, jumping, Erection of Control panel and commissioning of battery & battery charger also Complete Cable laying & termination of cable in Panel and equipment side
Preventive Maintenance in 66 kv Grid
Insulation resistance test & BDV Test of Oil
Voltage Ratio Test & Polarization Index Test
PM of 33/11 kv switch gear panel
Cable laying in DMRC 33kv,25kv,3.3kv
Engineer/Electrical
Tridev Enterprises
07.2015 - 04.2016
Project- Working for DMRC Project
Coordinate, and resolve project related activities and issues with other multi-discipline project team members
Manager - Water Supply, Sewerage & Rural Unit at Nippon Koei India Pvt Ltd, New DelhiManager - Water Supply, Sewerage & Rural Unit at Nippon Koei India Pvt Ltd, New Delhi