Results-driven Civil Quality Engineer with over 7 years of expertise in quality control and concrete technology, specializing in concrete and inspection management. Notable achievements include effectively overseeing quality control activities for various government metro projects, resulting in zero non-conformities during audits by the Central Vigilance Commission. Core competencies encompass project management, regulatory compliance, and quality assurance. Committed to leveraging skills to enhance the delivery of high-quality infrastructure at a progressive organization.
Project Details:- Directed design and construction of tunnel from underground ramp near Fatheaded Road metro station to end of ramp after RBS College metro station along Corridor-1 of Agra MRTS Project.
Executed all assigned roles and responsibilities efficiently.
Project Detail:- RVNL Package IV Construction of tunnels, formation, construction shaft and other ancillary works from chain age 47+360 to 63+117 km (FLS) with TBM and NATM under Package-4 in connection with new BG line between Rishikesh and Karanprayag (125 km) in the state of Uttarakhand, India.
Assigned Roles and Responsibility
Project Detail:- DMRC Contract CC-127: Design & Construction of Twin Box Tunnel by Cut & Cover method and one underground station namely ECC Centre including Architecture Finishing, Water Supply, Sanitary installation & Drainage work from chain age 22732.711 or 24765.993 for extension of Airport Express line from Dwarka Sector-21 to ECC centre at Dwarka Sector-25 Phase-III.
Assigned Roles and Responsibility
Assigned Roles and Responsibilities