Noida International Airport Project -Design & Built project till date capable of handling 12 million passengers, consisting of Passenger Terminal Building, 02 No’s of Piers which Includes 10 bridges serving C, E and F Type Aircrafts.
Associate Manager-MEP In Goa International Airport - Design & Built project till date capable of handling 4 million passengers, consisting of Passenger Terminal Building, 02 No’s of Piers which Includes 5 bridges serving C, E and F Type Aircrafts.
• Handled & coordinated the entire mechanical works.
• Looked after 70 Cr. of work mechanical works.
Senior Project Engineer-HVAC In Muscat International Airport -The biggest Design & Built project till date capable of handling 12 million passengers,consisting of Passenger Terminal Building, 03No’s of Piers which Includes 29 bridges serving C, E and F Type Aircrafts,air-side hotel with 90 rooms.
• Handled & coordinated the entire HVAC and related IBMS, Fire Fighting works.
• Provided support in terms of project management, Planning Procurement & Scheduling, Design Management, Contract Management, Resource Management & Relationship Management other than execution.
• Developed project related documentation including interface matrix, risk & mitigation plan, ,BOQ,DBOQ inspection procedures, work scopes, conducting site surveys with sub-contractors engineering group; proposing new possibilities where interference occurred.
• Planned and anchored on-site erection to ensure completion of project within the time & cost parameters and effective resource utilization to maximize the output.
• Reviewed ongoing and after completion erection of entire mechanical installation works of mechanical works.
•Monitored and ensured that the quality of work assigned is excellent and complies well with the safety norms maintaining first-level quality assurance to confirm that the installation of all work within the discipline is in accordance with the plans, specifications, and industry standards.
• Ensured that tests and inspections are performed, witnessed, and documented in accordance with approved procedures.
• Mentoring young thriving local talent as a part of Omanization.
Senior Project Engineer-MEP- Quest Mall - It was biggest lifestyle mall in Eastern Region of India.
•Provided technical inputs, coordinating site management activities, preparing & reviewing method statements and work specific quality control plans and ensuring materials received are in accordance with quality.
• Been the focal point for delivery of inspection programs including communication with clients, suppliers & inspection of technical support; conducting internal & external reviews.
• Have developed project related documentation including inspection procedures, work scopes, risk assessments and related specifications; conducting site surveys with sub-contractors engineering group; proposing new possibilities where interference occurred.
• Have planned and anchored on-site erection, testing & commissioning activities to ensure completion of project within the time & cost parameters and effective resource utilization to maximize the output.
• Have reviewed ongoing and after completion erection of entire mechanical installation works of HVAC, IBMS and related Fire-Fighting works.
• Have monitored and ensured that the quality of work assigned is excellent and complies well with the safety norms maintaining first-level quality assurance to confirm that the installation of all work within the discipline is in accordance with the plans, specifications, and industry standards.
• Have ensured that tests and inspections are performed, witnessed, and documented in accordance with approved procedures.
• Have ensured strict adherence to customer’s safety rules and corporate safety policy.
• Have ensured timely projects handing over including testing & commissioning of all MEP works in compliance with local & international EHS codes.
• Visakhapatnam Airport
• Reliance KGD6-Oil Gas Project
• Hotel Manaswai
• Hometown
• Have provided technical inputs, coordinating site management activities, preparing & reviewing method statements and work specific quality control plans and ensuring materials received are in accordance with quality.
•Have been the focal point for delivery of inspection programs including communication with clients, suppliers & inspection of technical support; conducting internal & external reviews.
• Have developed project related documentation including inspection procedures, work scopes, risk assessments and related specifications; conducting site surveys with sub-contractors engineering group; proposing new possibilities where interference occurred.
• Have planned and anchored on-site erection, testing & commissioning activities to ensure completion of project within the time & cost parameters and effective resource utilization to maximize the output.
• Have reviewed ongoing and after completion erection of entire mechanical installation works of HVAC, IBMS and related Fire-Fighting works.
• Have monitored and ensured that the quality of work assigned is excellent and complies well with the safety norms maintaining first-level quality assurance to confirm that the installation of all work within the discipline is in accordance with the plans, specifications, and industry standards.
• Have ensured that tests and inspections are performed, witnessed, and documented in accordance with approved procedures.
• Have ensured strict adherence to customer’s safety rules and corporate safety policy.
• Have ensured timely projects handing over including testing & commissioning of all MEP works in compliance with local & international EHS codes.
Interface Scope & L5 Construction Planning
Resource Optimization
Cost Control Administration
Site Management - Erection & Installation
Material Management & Consumption Based Management
Relationship Management
Budgeting/Forecasting
HSE & Compliance
Quality Management
Drawing & Documentation
Bahwan Engineering Company LLC,Muscat
Mobile:+968-97290892