Summary
Overview
Work History
Education
Skills
Certification
Work Availability
Interests
Languages
Work Preference
Timeline
Accomplishments
Personal Information
ABHRANIL BASU

ABHRANIL BASU

Construction Project Planning & Management
Greater Noida

Summary

Goal-driven project management professional with 5+ years of experience in commercial and residential construction. Skilled in BIM, ERP, Primavera P6, and MS Project for planning, tracking, and execution. Proven expertise in design coordination with consultants, and cross-functional alignment with finance, procurement, design, leasing, and CRM teams. Strong in project flowcharting, WBS creation, baseline scheduling, cost control, risk management, and resource allocation. Committed to delivering projects on time and within budget through tech-driven Next Gen collaborative construction management.

Overview

6
6
years of professional experience
3
3
Languages
7
7
Certificates

Work History

DM Planning & Coordination

Trehan IRIS
05.2023 - Current

Project: IRIS Broadway Grenowest (10 Lakh Sqft Commercial Project, budgeted Cost 423cr), Newly Open iris sarovar portico (Cost 27cr)


  • Developed and finalized project budget Cash Flow from concept stage, including material reconciliation, budget allocation, and cash flow management aligned with actual execution needs.
  • Created L1 to L5 project schedules in MSP, performed resource allocation, critical path identification, and risk management for timely project delivery.
  • Led coordination between site and design teams, managing drawing reviews, resolving RFIs, and ensuring seamless communication for technical clarity.
  • Managed material planning and indent processes, tracked progress through dashboards, and prepared detailed weekly/monthly reports with actual vs planned analysis.
  • Handled contractor bill verification, secured final approvals, and coordinated closely with accounts for smooth financial closure and payment tracking.


Project: upcoming Ultra-Luxury Residential Project (15 lakh Sqft, Designed by UHA, Budgeted 753cr ) and its Premium Boutique Experience Center designed by ESTEVA (Ongoing) | Sector 80, Gurgaon (Budgeted ₹26cr)


  • Prepared the concept budget, developed the L1 MSP schedule, and finalized the WBS structure for design and build alignment of the project.
  • Currently leading the planning & site coordination efforts for the Experience Center — a high-end boutique interior project — ensuring timely execution while maintaining premium quality standards.
  • Coordinating between design consultants, site teams, and procurement to resolve execution challenges in real-time.


BIM Coordinator

Trehan IRIS
02.2022 - 04.2023

Project Highlight: IRIS Broadway GrenoWest – 10 Lakh Sqft Commercial Development

  • Successfully developed a 400-level BIM model in Revit for a 10 lakh sqft built-up area, delivering complete architectural, structural, and MEP coordination for IRIS Broadway GrenoWest in initial Phase.
  • Finalized the concept budget based on schematic design and early-stage quantities.
  • Created a detailed Work Breakdown Structure (WBS) to align stakeholders and streamline planning.
  • Used Augmented Reality (AR) 3D visualizations to enhance design communication and present virtual walkthroughs to the MDs to better understanding.
  • Conducted initial clash detection using Autodesk Navisworks to preempt design conflicts.
  • Delivered 4D simulation (time-linked) of the project’s initial phases for better timeline understanding and stakeholder alignment.
  • Established BIM-based workflow and collaboration structure through Google Workspace.

BIM Modeler

Prithu Homes
07.2019 - 01.2022
  • Managed 4D BIM-based time-linear project planning using Primavera P6 and Microsoft Project (MSP), ensuring accurate construction sequencing and progress visualization.
  • Assisted the site execution team by interpreting and simplifying complex BIM models through Autodesk Revit, improving field-level understanding and reducing execution discrepancies.
  • Conducted clash detection and coordination using Autodesk Navisworks, resolving interdisciplinary conflicts across architecture, structure, and MEP services before execution.
  • Contributed to the BIM coordination process, ensuring alignment between design consultants, contractors, and site teams.
  • Delivered accurate quantity take-offs and material estimates using BIM software, resulting in optimized resource allocation.
  • Delivered high-quality graphics rendering for architectural and construction visuals to support client presentations and internal reviews.

Intern

Habcon Engineers
01.2019 - 06.2019

Education

Bachelor's Degree - CIVIL ENGINEERING

ADAMAS INSTITUTE OF TECHNOLOGY, Kolkata, West Bengal
01.2015 - 01.2019

Skills

MS project

undefined

Certification

BIM Management from Autodesk India, AP702735096039664626519, Autodesk Inc, USA

Work Availability

monday
tuesday
wednesday
thursday
friday
saturday
sunday
morning
afternoon
evening
swipe to browse

Interests

Reading & Writing Novels

Classical Music

Deep five in the WORLD OF AI

Playing and Watching Football

Languages

English
Advanced (C1)
Hindi
Advanced (C1)
Bengali
Bilingual or Proficient (C2)

Work Preference

Work Type

Full Time

Work Location

On-SiteRemoteHybrid

Important To Me

Career advancementCompany CultureFlexible work hoursPersonal development programsHealthcare benefitsWork-life balance

Timeline

DM Planning & Coordination - Trehan IRIS
05.2023 - Current
BIM Coordinator - Trehan IRIS
02.2022 - 04.2023
BIM Modeler - Prithu Homes
07.2019 - 01.2022
Intern - Habcon Engineers
01.2019 - 06.2019
ADAMAS INSTITUTE OF TECHNOLOGY - Bachelor's Degree, CIVIL ENGINEERING
01.2015 - 01.2019

Accomplishments

  • Achieved 3 lakh sqft of slab casting and 1.2 lakh sqft of foundation work within just 1.6 months through efficient planning, resource optimization, and seamless coordination across teams.
  • Successfully handed over a 75-key premium hotel project, including banquet hall, swimming pool, and restaurant, within 10 months by ensuring close coordination with contractors, maintaining seamless cash flow, and proactively managing risks.
  • Led the end-to-end implementation of an integrated ERP System across Finance, Engineering, Procurement, and Human Resource departments, significantly improving organizational efficiency.
  • Collaborated with KPMG in formulating Standard Operating Procedures (SOPs), organizational management systems, and performance dashboards to enhance process transparency and decision-making.
  • Spearheading the digital transformation of the organization by promoting a paperless environment through:
    DGQC for digital quality management,
    ASite for design documentation and coordination,
    Google Forms for real-time Daily Progress Reporting (DPR).

Personal Information

  • Date of Birth: 05/03/1998
  • Marital Status: Unmarried
ABHRANIL BASUConstruction Project Planning & Management