Results-driven Electrical & Instrumentation (E&I) Quality Manager with over 16 years of experience in vendor material inspection, site inspection, quality surveillance, and technical compliance within major Oil & Gas and Refinery EPCC projects. Expertise includes reviewing vendor documentation, conducting factory acceptance tests (FAT), and ensuring adherence to project specifications, international standards (IEEE, IEC, NEC), and client quality requirements. Proficient in coordinating efforts among vendors, third-party inspection agencies (TPIA), engineering consultants, and project stakeholders to ensure timely delivery and compliance of all E&I equipment. A solid foundation in site quality surveillance, ITP implementation, material inspection, FAT/SAT, field audits, NCR management, and vendor coordination drives quality excellence throughout project lifecycles.

Overview

18
18
years of professional experience
1
1
Certification

Work History

QA/QC Manager-E&I

Afcons Infrastructure Limited
09.2024 - Current
  • HRRL COT Mundra

QA/QC Engineer-E&I

Tata Projects Limited
04.2021 - 08.2024
  • HRRL Barmer & MS Block(IOCL)-April 2021-Aug 2024

Electrical QA/QC Engineer

Toyo Engineering India Pvt. Ltd
08.2018 - 03.2021
  • Capacity expansion Project(NCU) -August 2018- March 2021

E&I QA/QC Engineer

Sinsina corner company for contracting
03.2015 - 05.2018
  • BUCO and SAAC Project,Jubail (ARAMCO/TASNEE) - March 2015 – May 2018

Electrical QC Inspector

Sejong Saudi Arabia LLC
07.2013 - 07.2014
  • NGL Recovery And Utilities Project,Shaybha (SAUDI ARAMCO)- July 2013 to July 2014

Electrical QC Inspector

ELMATICS ENGINEERING Pvt. Ltd.
01.2012 - 06.2013
  • B.P.C.L. Mahul Gaon,Chembur,Mumbai- January 2012 to June 2013

Electrical QC Inspector

DAELIM SAUDI ARABIA CO. LTD
12.2009 - 12.2011
  • Saudi kayan HDPE Project,Jubail- Dec 2009 to Dec 2011

Electrical Site Engineer

PUNJ LLOYD LTD.
06.2008 - 11.2009
  • BXP and MSQ Project in I.O.C.L Barauni Refinery,Bihar-June 2008 to Nov 2009

Education

Bachelor of Engineering - Electrical

BIT SINDRI
Dhanbad, Jharkhand, INDIA

Skills

Application: MS word, excel, Power point, Internet, Aconex, Wrench

Customer focus orientation

Quality management systems

ISO standards

Quality control management

Problem-solving abilities

Documentation control

Certification

Approved and certified with LEVEL-1 QA/QC ELECTRICAL INSPECTOR in SAUDI ARAMCO PROJECT(SAP ID. NO-70017752)

Timeline

QA/QC Manager-E&I

Afcons Infrastructure Limited
09.2024 - Current

QA/QC Engineer-E&I

Tata Projects Limited
04.2021 - 08.2024

Electrical QA/QC Engineer

Toyo Engineering India Pvt. Ltd
08.2018 - 03.2021

E&I QA/QC Engineer

Sinsina corner company for contracting
03.2015 - 05.2018

Electrical QC Inspector

Sejong Saudi Arabia LLC
07.2013 - 07.2014

Electrical QC Inspector

ELMATICS ENGINEERING Pvt. Ltd.
01.2012 - 06.2013

Electrical QC Inspector

DAELIM SAUDI ARABIA CO. LTD
12.2009 - 12.2011

Electrical Site Engineer

PUNJ LLOYD LTD.
06.2008 - 11.2009

Bachelor of Engineering - Electrical

BIT SINDRI

Role & Responsibilities

  • Assured material received in accordance with the PO, ITP, and Technical Specification, Codes/ Material standards to determine conformity.
  • Performed receiving inspections such as visual, dimensional, verification of markings, review of Material Test Certificates / Inspection Release Notes in accordance with project specifications, codes / material standard and scope of work as noted in the PO, Data Sheet, Drawings, PR and ITP.
  • Coordinate remote/onsite inspections with vendors, PMC/Client, and third-party agencies.
  • Track vendor materials progress and ensure materials meet specifications.
  • Assisted in FAT planning and quality documentation.
  • Provided interpretation of applicable code/material standards and customer requirements.
  • Co-ordinated with PMC/Client for any deviation, clarification and waivers deemed necessary.
  • Identified any additional testing requirement and arranged/coordinated with approved testing laboratories for testing with PMC approval. Participate in witnessing the lab testing as and when required.
  • Coordinated / Interfaced with Vendor, TPIA, PMC, Certifying Authority, and Client assuring conformity to project specifications.
  • Liaised with customer representatives ensuring product conformity and stage release for each activity denoted in the PO/ITP.
  • Attended Kick off meetings, Pré-Inspection meeting(PIM) for the assigned project.
  • Visited vendor premises and conduct vendor inspections as and when required, as per PO/ITP.
  • Exercised proactive approach in prevention of a technical problem by interaction with Purchasing, Engineers, and Management personnel.
  • Reviewed documents like ITP, Procedures, MRB etc. submitted by Vendor as per DCI .
  • Review Subcontractors or supplier quality document submittals (Quality plans, Inspection test and plan procedure ) to ensure effective controls are in place in key area.
  • Prepared & issued overall Inspection Status Report, reviewed TPIA Inspection Report, Inspection Release Note(IRN) Maintenance of inspection logs and registers on Excel
  • Prepared or review compliance reports, inspection status summaries, punch point closures, etc
  • Coordinated with TPI to arrange inspection at supplier’s work/OEM
  • Interfaced with telecom equipment vendors (e.g., for VHF, PAGA, CCTV,Access Control System, Fiber optics Cable)
  • Coordinated with Site Team to resolved issued related to IMIR
  • Conduct Material receiving inspection of all electrical equipment, Instruments like PT,TT,FT, Level Transmitter,Rotameter,Mass Flow meter,LEL,Gas detection system, FCV, power cables,IC etc.
  • Monitoring and reporting on the status of implementation of the project quality management system and its effectiveness.
  • Check and review construction/installation drawing and ensure that the drawing conform to the project specifications and standards.
  • Co-ordinate with the client representative on matters involving quality assurance and control activities.
  • Prepare and submits Request For Inspection(RFI),IIR on completed works to clients for their approval.
  • Issues NCR on works that deviates standards and design specifications.
  • Knowledge of industry codes and standards related to the electrical installation and testing (ANSI, IEC, IEEE,NEC,NEMA etc.)
  • QA/QC documentations and review contractor construction electrical procedure.
  • Monitor activities of supervision contractor and construction contractor
  • Prepared MAR,IR,ITP,QA/QC Dossier, Method statement of HIPOT TEST, LV Panel board testing, Dry- Type Transformer testing, Neutral Grounding Resistor(NGR) testing etc.
  • Witnessed and verified continuity, egger, HIPOT Testing of MV cable.
  • Witnessed and verified megger,winding resistance, ratio test and function test of Dry Type transformer, MCB and MCCB testing of LV panelboard like megger,contact resistance and trip test.
  • Witnessed and verified Neutral Grounding Resistor testing, motor winding and IR testing.
  • Completely supervised and witnessed motor SOLO RUN test.
  • Site inspection for electrical equipment installation, cable tray installation ,trenches, cable laying and backfilling of LV,MV and grounding cables, cathodic protection for pipe lines,water sewer tank etc.
  • Indoor and outdoor lighting installation as per approved inspection and plan.
  • Pre-Installation and Installation Inspection of Switchgear, MCC , power Transformer, Dry type transformer, LV Panelboard, control panel etc.
  • Laying of cables and cable trays as per the drawings and standard provided.
  • Performed continuity and insulation resistance test of LV power, building wire and control cables.
  • Inspected cable pulling, cable dressing, glanding, termination and torque testing of power, grounding and control cables in transformer, switchgear, controlgear.
  • Supervised main bus bar torque testing of Switchgear, Controlgear and MV power cables.
  • Inspected installation of raceway, EMT conduit,FMC, outlet metal box, PVC conduit for receptacles.
  • Issued Punch listing for outstanding work
  • Inspected installation of cable bus for LV and MV cables
  • Replace the current transformer, potential transformer and switch gears in the board panel.
  • Manage all the procurement for the project.
  • Update as built drawing regarding actual load revision and change of all electrical work.
  • Complete knowledge of working in the areas of Risk assessment,knowledge of area classification, Work Permit System and Safety Standards.
  • Inspected all the lighting layout of the loading area.
  • Monitor site works as per programme & ensure that the schedule is adhered to in all aspects.
  • Ensured all materials meet or exceed the contract specifications.
  • Documented all Inspection and testing in QC reports.
  • Reviewed all inspection and material testing performed by third parties and co-ordinated with Vendor.
  • Monitored daily construction activities and materials delivered to the site.
  • Coordinated and scheduled field testing and performance QA/QC inspections.
  • Prepared Quality documentation and reports by collecting,analyzing and summarizing informations.
  • Relevant with IE Rules & Electricity Act 2003
  • Responsible for implementations and monitoring of all electrical related works at site.
  • Estimates, prepares and assigns the resources such as manpower, materials, consumables, equipment, tools, etc., required for all electrical and related works prior to execution.
  • Manages directly and provide engineering and technical supports to all the electrical work groups at site.
  • Plans the execution of all electrical related works and coordinates the works to mechanical and civil groups.
  • Coordinates with Client/Consultants representatives for any site instructions and inspection of works.
  • Submits site daily reports, inspection requests, estimates and all applicable monitoring reports on regular basis or as required.
  • Supports the Asst. Project Manager in accomplishing all the goals and targets for the electrical groups at site.
  • Ensures that all the works done are in accordance with the approved construction drawings, contract documents, project specifications, and all applicable standards whether local, national or international standards
  • Identify the resources required and make deployment schedule and arrange for the various resources required (Man / Materials & machinery) at site on time.
  • Interact with contractors / vendors to explain them the requirement and provide all drawings / specifications
  • Monitor the disposition of all issued nonconformance reports
  • Control all achieve documentation upon completion of project