Summary
Overview
Work History
Education
Skills
Timeline
Generic
Pandidurai K

Pandidurai K

Chennai

Summary

Paint shop Industrialization experience with 20+ years of experience in manufacturing engineering.

Hands-on experience as a design to manufacturing process engineer for new product development and launch in paint shop.

Experienced with two Greenfield and two brown field project in OEM and Tier-1 with equal experience in both shop floor and core engineering.

Expert in process planning with robot in paint shop installation and commissioning from creating specification to final handover to line.

Expert in handling of paint shop product quality measuring equipment and material testing.


Overview

20
20
years of professional experience

Work History

Paints Shop Industrialization Lead

Segula Technologies
03.2023 - Current
  • Role is work with global Stellantis design & process team on the J4U North America project to support the design to manufacturing for North America team.
  • Led vehicle and material hypothesis efforts, ensuring milestone deliverables were met according to desired timeline.
  • Achieved 100% adherence to On-Time Delivery (OTD) and First-Time Right (FTR) standards through effective coordination."

Paint Shop - Head

SMRC - Motherson Group
02.2021 - 03.2023
  • One of initial tasks was to implement 3C1B system to secure business deal with Royal Enfield.
  • This involved successfully launching two models, J1A and D2k/D3k, which included eight parts & 5 Colors (Matt & Glossy finish), (4 parts stickering 3C1B +1C1B).
  • Successfully launch Nano soft feel paint on passenger panel for Hyundai Creta.
  • This project required careful planning and execution to ensure new paint met all quality standards and customer expectations.
  • For Nissan, led launch of RED edition for Magnite model, limited variant with around 2,500 units. collaborated with Musashi paint team to validate color under production conditions.
  • New projects IQF study and capacity analysis for all paint shop.
  • New product jigs and fixture concept development density per carriage
  • Overall responsibility for daily management of all labor resources within paint shop and loading area - 152 members.
  • Ensure all scheduled maintenance is carried out on all paint plant.
  • Present performance of daily / weekly /monthly management briefings.

Industrialization Lead

Expleo Group
12.2017 - 02.2021
  • Tasked with revamping 20-year-old plant to meet Stellantis' entry-level quality, commissioning and introducing new color to market on cc21 model.
  • Initially,conducted thorough assessment of plant, identifying outdated machinery, inefficient processes, and gaps in quality standards.
  • Developed detailed plan, outlining timelines, resources, and key milestones - (cc21 industrial job master schedule , A3,Sourcing file).
  • In JCDC milestone present status of stage wise plannification of investment - Capacity,quality,maintenance and got go ahead, in total 23.5 M euro handled
  • Collaboratively work with various team like (Design,Styling,project,Planning,Marketing,Purchase, Production,Supply chain,Quality,maintenance,Finance) to accomplish task as well as smooth launch.
  • Development of new paint color & application process.
  • Design validation and feedback to designers to improve accessibility & adopt manufacturing requirements.
  • Auxiliary product cost per car convergence to achieve overall cost targets.
  • SSAR &STAR analysis to adopt layout.

Senior Engineer

Renault Nissan Automotive India Private Limited
06.2009 - 11.2017
  • Implement Alliance Production Way and New Product Launch Commissioning , during greenfield launch of nissan micra/sunny , Renault duster vehicle. Key responsibilities included product and process standardization, installation and commissioning support, Genba audits, documentation, and comprehensive training programs (Basic skills, Advanced skills, Offline training, OJT)
  • DST & DSTR Calculation for new models
  • Process Planning with Time Study to identify the bottle neck improve production & quality.
  • Developing Standard Operation Sheets/ Visual aids to help & improve the Operator inspection skill.
  • Bench marking Process good practice from others Renault Nissan plant.
  • Coach and develop team members to ensure they are able to do their job effectively delivering objectives and targets in line with scorecard metrics
  • Developed and implemented IMS procedures to verify compliance with engineering standards.

Junior Engineer

Hyundai Motors India
04.2007 - 06.2009
  • Worked as Quality Control In charge, during greenfield launch of i10 vehicle.
  • Handled ED and topcoat body audits, measured DFT, gloss, and wavescan , Spectophotometer, Oven temperature travel record,(TTR) and led PDI concern analysis and closure reporting in daily meetings.
  • In total 12 operator reported me as initial/final/offline inspection area.
  • Handled tear down for how Electro deposition reach car body interior as well as pocketed area based on result action implemented.
  • Hands on experience in paint quality systems, supplier audits, PFD,PFMEA,control plans, and equipment calibration in ensuring sustained car quality.
  • Collaborated with engineering team to determine project specifications.

Production Associate

Ford India Private Limited
06.2004 - 04.2007
  • Responsibility was spraying, inspection, sanding, polishing, and sealer application on Ikon model.
  • Coordinator for new model launch of Endeavor model.
  • I gained deep understanding of importance of painting in automotive manufacturing and became proficient in SQDCME scorecard metrics.
  • Actively participated in Non-Production Material Cost Reduction activities, contributing to operational efficiency improvements.

Education

Bachelor of Science - Engineering Technology

Birla Institute of Technology And Science
Pilani, India
05.2013

High School Diploma -

Thanapandiyan Polytechnic
Madurai
04.2004

Skills

  • Goal setting
  • Scheduling
  • Focus and Follow - Through
  • Department Oversight
  • Time Management
  • Statistical Problem Resolution
  • Process improvements
  • Standardized Process Documentation
  • Process planning
  • APQP
  • CATIA V5 and V6
  • Microsoft office (Excel, PowerPoint, Word)

Timeline

Paints Shop Industrialization Lead

Segula Technologies
03.2023 - Current

Paint Shop - Head

SMRC - Motherson Group
02.2021 - 03.2023

Industrialization Lead

Expleo Group
12.2017 - 02.2021

Senior Engineer

Renault Nissan Automotive India Private Limited
06.2009 - 11.2017

Junior Engineer

Hyundai Motors India
04.2007 - 06.2009

Production Associate

Ford India Private Limited
06.2004 - 04.2007

Bachelor of Science - Engineering Technology

Birla Institute of Technology And Science

High School Diploma -

Thanapandiyan Polytechnic
Pandidurai K