Summary
Overview
Work History
Education
Skills
Additional Information
Certification
Timeline
Generic
Adil Hasan  Siddiqui

Adil Hasan Siddiqui

Civil Engineer
Barabanki

Summary

.Supervision, Construction & Maintenance of Metro rail laying and civil execution work.

Supervision of ATW & FBW rail welding tolerance & USFD testing.

Supervision & Erection of PEB Structure work

Experience in survey work on digital level.

I have also been responsible for execution and supervision of the construction activities

I have responsible in Quality assurance and controlling aspect of all kind of activities at project

site & Coordinating with Quality head working all of site activities as per methodology.



Overview

10
10
years of professional experience
1
1
Certificate

Work History

Project Engineer

Aecom India
pune
12.2022 - Current
  • Supervise the installation of ballasted and ballast less track in Depot and on Main Line
  • Checking of all the FBW and AT welds for physical parameter and witnessing the USFD
  • Monitoring and contributing to the correct implementation of the track layout
  • Monitored installation of materials and equipment for compliance with drawings and specifications.
  • Determined and scheduled priorities as required to progress engineering work.
  • Assessed impact of modification requests for ongoing projects.
  • Completed construction tasks while providing safe working conditions, staying on budget and meeting project deadlines.

Sr.Engineer Track

Italferr S.P.A
Agra,Kanpur
09.2020 - 12.2022
  • Supervise the installation of ballasted and ballast less track in Depot and on Main Line.
  • Supervise the installation of ballasted and ballast less Turnouts and Scissors cross over in Depot and on Main Line.
  • Review of plinth data sheets.
  • Report to RE regarding non-conformance/ major observations and assist him in raising NCR .
  • Checking of all the FBW and AT welds for physical parameter and witnessing the USFD.
  • Witness the weld laboratory tests..
  • Attending the co -ordination meeting

Asst. Manager

Aarvee Associates architects, consultants Pvt. Ltd
Lucknow
03.2018 - 08.2020

· Installation of ballast less track on Main Line & Depot

· Rear work & final parameter making.

· Distressing of track & Buffer stop fixing.

· Documentation for CMRS.

· Preparing methodology & work procedure of various activities.


.Review of Quality Assurance Plan and Quality Plans, submitted by the Contractor's for adequacy of such plan to ensure execution of works in accordance.


Civil Expert

Reach Infra
Botad
04.2017 - 11.2017
  • Activities Performed Conversion of MG track into BG track (88.2 Km) from Sabarmati to Botad section in Bhavnagar Division of Western railway
  • Construction Supervision of New Station Building, water supply ,Drainage , Railway Platform, Staff quarter, Roadbed, Bridges, supply of Ballast, dismantling of existing MG track
  • Installation of track packages of major steel girder bridges along with foundation, substructure and related protection works on permanent diversion
  • Strengthening of the sub structure of existing bridges along with provision of new steel plate girder, protection work, Casting of RCC box bridges.
  • Earth work & Blanketing on approaches, and other allied works in connection with Gauge Conversion of Sabarmati-Botad section in Bhavnagar


Site Engineer

Nayak Infra Pvt.ltd
Agartala
07.2014 - 04.2017
  • Activities Performed Construction, Supervision and contributing to the correct implementation of the layout.
  • Preparation of Quality Control/Quality assurance procedures (QC/QA)
  • Construction of New Station Building, water supply, Drainage, Railway Platform,Staff quarter, Roadbed, Slope protection work, Casting of RCC box bridges,
  • Earth work & Blanketing on approaches


Education

Diploma - Civil Engineering

I.A.S.E University

B.tech - Civil Engineering

Manav Bharti University

Skills

    Supervision, Construction & Maintenance of Metro rail laying and civil execution work Supervision& execution of track installation for ballast less& ballasted track (Underground & Elevated) including Turn-out, Cross-over & Scissor cross over with documentation of final Track parameter for CMRS Supervision of ATW & FBW rail welding tolerance & USFD testing Supervision & Erection of PEB Structure work Experience in survey work on digital level Supervision & Construction of station building execution work

undefined

Additional Information

  • myself, my qualifications and my experience. Reporting Person Reference: Mr.Amit Lal( Senior Track expert/Italferr) MN-809015394 Mr. JP Singh (JGM/IRCON) MN- 8009187825 Mr. P.K Pandey (Manager/RVNL) MN-8874471996 Adil Hasan Siddiqui

Certification

CM - Certified Manager Certification

Timeline

Project Engineer

Aecom India
12.2022 - Current

Sr.Engineer Track

Italferr S.P.A
09.2020 - 12.2022

Asst. Manager

Aarvee Associates architects, consultants Pvt. Ltd
03.2018 - 08.2020

Civil Expert

Reach Infra
04.2017 - 11.2017

Site Engineer

Nayak Infra Pvt.ltd
07.2014 - 04.2017

Diploma - Civil Engineering

I.A.S.E University

B.tech - Civil Engineering

Manav Bharti University
Adil Hasan SiddiquiCivil Engineer