Summary
Overview
Work History
Education
Skills
Key Projects - Summary
Education and Training
Work Preference
Timeline
AccountManager

Aditya Nidamarthi

Executive - Engineering
Hyderabad,TG

Summary

  • Resourceful Assistant Manager for a pharmaceutical Industry known for high productivity and efficient task completion.
  • Specialized in project management, Preparing the Cost Estimations, Completion of Equipment Installation & Commissioning activities as per schedule, Preparation of Equipment Qualification Documentation, Performing the Qualification of the Equipments or facility as per the Standard Operating Procedures.
  • Excel in communication, problem-solving, and adaptability, using these soft skills to successfully lead projects to completion.
  • Prioritize collaboration and innovation to meet project goals effectively.

Overview

14
14
years of professional experience
3
3
years of post-secondary education

Work History

Executive - Projects

Tianish Laboratories pvt Ltd - Unit 7
Hyderabad
06.2024 - Current
  • Reviewed existing procedures and implemented changes as required by organizational policies.
  • Procured and organized project documents, reports and files.
  • Provided guidance and support to junior staff members working on assigned projects.
  • Maintained detailed records of all expenses related to each assigned project.
  • Coordinated resources across multiple teams to meet project objectives efficiently.
  • Ensured compliance with relevant safety regulations during all phases of a project's life cycle.
  • Liaised with senior management to identify areas for improvement in project operations.
  • Assisted in the preparation of project plans and budget estimates.
  • Monitored progress of projects against agreed timelines, budgets, and outcomes.

Executive

Mylan Laboratories Limited, Unit 7
Hyderabad
09.2015 - 05.2024
  • Collaborated with cross-functional teams to ensure project objectives were met.
  • Managed daily operations of engineering departments including budgeting, resource allocation, and personnel management.
  • Reviewed contracts related to engineering projects prior to execution.
  • Generated engineering documentation and oversaw design projects.
  • Identified and resolved technical problems related to equipment installation.
  • Created detailed reports outlining progress made on each equipment installation project.
  • Maintained accurate records of all equipment installation and configuration details.
  • Communicated with customers regarding progress of equipment installation projects.
  • Participated in team meetings discussing current projects involving avionics equipment installation or upgrades.
  • Managed projects related to equipment installation or maintenance, coordinating efforts between various teams involved in the project.

Design Engineer

Rajamane Telectric Pvt Ltd
Bangalore
12.2013 - 07.2014
  • Utilized CAD software ( Solidworks ) to create tooling designs and generate CNC programs.
  • Analyzed product drawings, created 3D models, and generated 2D prints for tools.
  • Developed detailed tool designs to meet customer specifications and requirements.
  • Collaborated with engineers and machinists to optimize tool design performance.

Design Engineer

Deebee Technologies
Hyderabad
08.2011 - 12.2013
  • Developed and tested prototypes of mechanical components utilizing CAD software.
  • Generated technical drawings, assembly instructions and bill of materials.
  • Provided engineering support to production personnel during the manufacturing process.
  • Troubleshooted existing products in order to identify potential design improvements.
  • Created 3D models for physical prototypes using SolidWorks or Inventor software packages.
  • Presented new product ideas to management teams through formal presentations and demonstrations.

Education

B. Tech ( Mechanical )

Swarnandhra College of Engineering & Technology
04-2011

Intermediate

Aditya Junior College
Tadepalligudem, Andhra Pradesh
06.2005 - 04.2007

SSC

Ideal Educational Academy
Jinnur, Andhra Pradesh
06.2004 - 04.2005

Skills

  • Equipment Installation & Commissioning skills ( Reactor, Centrifuge,RCVD,ANFD,Nutsche Filter, Sparkler Filter,Tray Drier , Vacuum Tray Drier, Blender, Multimill, Micronizer, etc, )
  • Deep Knowledge on the effective Utilization of various Process Pumps , Vacuum Pumps for the Process equipments
  • Deep Knowledge on the effective Utilization of Dry Air, Nitrogen, Instrument Air,Breathing Air, CT water, Chilled Water, Brine , Hot water, Steam, liquid Nitrogen for the Manufacturing activities
  • Pipelines Routing as per Requirement according to the facility
  • Ability to read , understand the Process Flow Diagrams of any Products related to API's
  • Preparation of Equipment Qualification Documents ( URS ( User Requirement Specification ) ,Data Sheet, IQ ( IQ Protocol & IQ Report ), OQ (OQ Protocol & OQ Report ))
  • Preparation of Addendum Qualifications as per the modifications ( If any )
  • Preparation of Asset Installation & Commissioning Reports
  • Preparation of Cost Estimations - Mechanical ( Pipes & Fittings Costs, Insulation Material Costs, Fabrication work Costs , Insulation work Costs etc,)
  • Raising new Purchase Requisitions in SAP( using ME51N , ME52N )
  • Checking Material Stocks in SAP(using MIGO)
  • Following Work order Procedures in SAP ( using IW21, IW22,IW28,IW32,IW38,IW41)
  • Deep Knowledge on Work order Permit Procedures & Loto Procedures
  • Project Reporting
  • Project development
  • Material Management Module ( SAP Front End )
  • SAP expertise
  • Microsoft Office expertise
  • Compliance with GMPs
  • Cost Estimations
  • Safety and compliance

Key Projects - Summary

  • Involved in the Installation & Commissioning of 20 Ton coal Boiler at Mylan Laboratories Limited, Unit 7.
  • Active team member in the Completion of a new Solvent Recovery Plant ( SRP-04 ) at Mylan Laboratories Limited, Unit 7.
  • Active team member in the Completion of a new Manufacturing Block (MB-13 ) at Mylan Laboratories Limited, Unit 7.
  • Active team member in the renovation of Manufacturing Blocks - 8 Blocks ( MB-01 / MB-02 / MB-03 / MB-05 / MB-06 / MB-08 / MB-09 / MB-10 ) at Mylan Laboratories Limited, Unit 7.
  • Involved in the Clean Room Renovations in Manufacturing Blocks at Tianish Laboratories Private Limited & Mylan Laboratories Limited, Unit 7.

Education and Training

true,other,true,other,true,other

Work Preference

Work Type

Full Time

Work Location

On-SiteRemoteHybrid

Important To Me

Career advancementWork-life balanceCompany CultureFlexible work hoursPaid time off

Timeline

Executive - Projects

Tianish Laboratories pvt Ltd - Unit 7
06.2024 - Current

Executive

Mylan Laboratories Limited, Unit 7
09.2015 - 05.2024

Design Engineer

Rajamane Telectric Pvt Ltd
12.2013 - 07.2014

Design Engineer

Deebee Technologies
08.2011 - 12.2013

Intermediate

Aditya Junior College
06.2005 - 04.2007

SSC

Ideal Educational Academy
06.2004 - 04.2005

B. Tech ( Mechanical )

Swarnandhra College of Engineering & Technology
Aditya NidamarthiExecutive - Engineering