Resourceful Assistant Manager for a pharmaceutical Industry known for high productivity and efficient task completion.
Specialized in project management, Preparing the Cost Estimations, Completion of Equipment Installation & Commissioning activities as per schedule, Preparation of Equipment Qualification Documentation, Performing the Qualification of the Equipments or facility as per the Standard Operating Procedures.
Excel in communication, problem-solving, and adaptability, using these soft skills to successfully lead projects to completion.
Prioritize collaboration and innovation to meet project goals effectively.
Overview
14
14
years of professional experience
3
3
years of post-secondary education
Work History
Executive - Projects
Tianish Laboratories pvt Ltd - Unit 7
Hyderabad
06.2024 - Current
Reviewed existing procedures and implemented changes as required by organizational policies.
Procured and organized project documents, reports and files.
Provided guidance and support to junior staff members working on assigned projects.
Maintained detailed records of all expenses related to each assigned project.
Coordinated resources across multiple teams to meet project objectives efficiently.
Ensured compliance with relevant safety regulations during all phases of a project's life cycle.
Liaised with senior management to identify areas for improvement in project operations.
Assisted in the preparation of project plans and budget estimates.
Monitored progress of projects against agreed timelines, budgets, and outcomes.
Executive
Mylan Laboratories Limited, Unit 7
Hyderabad
09.2015 - 05.2024
Collaborated with cross-functional teams to ensure project objectives were met.
Managed daily operations of engineering departments including budgeting, resource allocation, and personnel management.
Reviewed contracts related to engineering projects prior to execution.
Generated engineering documentation and oversaw design projects.
Identified and resolved technical problems related to equipment installation.
Created detailed reports outlining progress made on each equipment installation project.
Maintained accurate records of all equipment installation and configuration details.
Communicated with customers regarding progress of equipment installation projects.
Participated in team meetings discussing current projects involving avionics equipment installation or upgrades.
Managed projects related to equipment installation or maintenance, coordinating efforts between various teams involved in the project.
Design Engineer
Rajamane Telectric Pvt Ltd
Bangalore
12.2013 - 07.2014
Utilized CAD software ( Solidworks ) to create tooling designs and generate CNC programs.
Analyzed product drawings, created 3D models, and generated 2D prints for tools.
Developed detailed tool designs to meet customer specifications and requirements.
Collaborated with engineers and machinists to optimize tool design performance.
Design Engineer
Deebee Technologies
Hyderabad
08.2011 - 12.2013
Developed and tested prototypes of mechanical components utilizing CAD software.
Generated technical drawings, assembly instructions and bill of materials.
Provided engineering support to production personnel during the manufacturing process.
Troubleshooted existing products in order to identify potential design improvements.
Created 3D models for physical prototypes using SolidWorks or Inventor software packages.
Presented new product ideas to management teams through formal presentations and demonstrations.
Deep Knowledge on the effective Utilization of various Process Pumps , Vacuum Pumps for the Process equipments
Deep Knowledge on the effective Utilization of Dry Air, Nitrogen, Instrument Air,Breathing Air, CT water, Chilled Water, Brine , Hot water, Steam, liquid Nitrogen for the Manufacturing activities
Pipelines Routing as per Requirement according to the facility
Ability to read , understand the Process Flow Diagramsof any Products related to API's
Preparation of Equipment Qualification Documents ( URS ( User Requirement Specification ) ,Data Sheet, IQ ( IQ Protocol & IQ Report ), OQ (OQ Protocol & OQ Report ))
Preparation of Addendum Qualifications as per the modifications ( If any )
Preparation of Asset Installation & Commissioning Reports
Preparation of Cost Estimations - Mechanical ( Pipes & Fittings Costs, Insulation Material Costs, Fabrication work Costs , Insulation work Costs etc,)
Raising new Purchase Requisitions in SAP( using ME51N , ME52N )
Checking Material Stocks in SAP(using MIGO)
Following Work order Procedures in SAP ( using IW21, IW22,IW28,IW32,IW38,IW41)
Deep Knowledge on Work order Permit Procedures & Loto Procedures
Project Reporting
Project development
Material Management Module ( SAP Front End )
SAP expertise
Microsoft Office expertise
Compliance with GMPs
Cost Estimations
Safety and compliance
Key Projects - Summary
Involved in the Installation & Commissioning of 20 Ton coal Boiler at Mylan Laboratories Limited, Unit 7.
Active team member in the Completion of a new Solvent Recovery Plant ( SRP-04 ) at Mylan Laboratories Limited, Unit 7.
Active team member in the Completion of a new Manufacturing Block (MB-13 ) at Mylan Laboratories Limited, Unit 7.
Active team member in the renovation of Manufacturing Blocks - 8 Blocks ( MB-01 / MB-02 / MB-03 / MB-05 / MB-06 / MB-08 / MB-09 / MB-10 ) at Mylan Laboratories Limited, Unit 7.
Involved in the Clean Room Renovations in Manufacturing Blocks at Tianish Laboratories Private Limited & Mylan Laboratories Limited, Unit 7.
Education and Training
true,other,true,other,true,other
Work Preference
Work Type
Full Time
Work Location
On-SiteRemoteHybrid
Important To Me
Career advancementWork-life balanceCompany CultureFlexible work hoursPaid time off
TEAM MEMBER - QMS (INVESTIAGTION AND IMPROVEMENT PROJECT) at Dr. Reddys Laboratories (Sterile Formulation Unit)TEAM MEMBER - QMS (INVESTIAGTION AND IMPROVEMENT PROJECT) at Dr. Reddys Laboratories (Sterile Formulation Unit)
Microbiologist, Laboratory Quality Control at Niedlfree Technologies Pvt LtdMicrobiologist, Laboratory Quality Control at Niedlfree Technologies Pvt Ltd