Summary
Overview
Work History
Education
Skills
Strength Skills
Disclaimer
Languages
Timeline
Generic

Agni Maharaja Kathiresan

Madurai

Summary

Solutions-oriented engineering professional with more than 15 years of experience.

Highly-motivated employee with desire to take on new challenges. Strong worth ethic, adaptability and exceptional interpersonal skills. Adept at working effectively unsupervised and quickly mastering new skills.

Overview

17
17
years of professional experience

Work History

Piping Engineer

Keppel Shipyard Limited (currently known as Seatrium Ltd)
Singapore
06.2022 - Current
  • To Understand/Study the project specifications (Piping material Spec, Support Standard, Painting spec), drawings (P &ID, GA & ISO), schedule, scope of work, Project Execution Plan, QA/QC procedure, Safety Procedure prior to executing projects.
  • To plan accordingly to execute the work in cost effective & efficient manner.
  • Ensure timely delivery of approved drawings, procedures & specification to Subcontractors.
  • Ensure sufficient manpower requirement/mobilization with subcontractors to execute the work.
  • Conduct/arrange welders for welder qualification test with QA/QC concerns & safety training program to all.
  • Ensure the Material received status with Material department, coordinate with concern authorities to request for priority-wise requirements/resolve issues if any deviation in material.
  • Ensure the site ready to erect.
  • Coordinate to resolve any delays/ obstructions with other departments.
  • Conduct daily meeting to plan, execute, inspection (ITP), Hydro testing/ Pneumatic testing, Flushing & Reinstatement work with subcontractor.
  • Any obstructions/delays to be rectified immediately to achieve project schedule.
  • Ensure contractors prepared & disperse information to workers about Job Risk Assessment, Lifting plan & Job Safety Analysis.
  • Ensure contractors’ valid work permit to execute the work.
  • Daily reporting of progress, any delays/ obstruction/ route modification on site condition to be highlighted to Project/ Section Manager.
  • Ensure & follow the punch list issuance, rectification up-to work completion with Owner/Client.
  • Involved project: Golar Gimi FLNG(liquefaction capacity of 2.7 million tonnes per annum), Bacalhau FPSO(It will have a large topside designed to produce up to 220,000 barrels of crude oil per day, produce and inject up to 530 million standard cubic feet of associated gas per day and inject up to 200,000 barrels of seawater per day
  • Its minimum storage capacity of crude oil will be 2,000,000 barrels); Repair Vessel – AL Zubrah

Piping Engineer

M/S Dharuna Engineering and Construction
India
12.2019 - 03.2020
  • Preparation of material take off (MTO) from P&ID layout Preparation and Updating of Material control for Project Documentation control of Piping and other disciplines Review of P&ID's, layouts, GADs, Isometrics & various piping related drawings and documents
  • Developed piping plan with emphasis to process, economics and safety of the piping system
  • Checked and reviewed construction drawings to reflect actual site arrangement
  • Proficient in using international design codes and standards such as ASME, API and ASME.
  • Reviewed piping designs to ensure conformance with applicable codes and standards.
  • Developed piping layouts using 3D CAD software packages such as AutoCAD, PDMS, and MicroStation.
  • Performed pipe stress analysis calculations utilizing CAESAR II software.
  • Coordinated the preparation of material specifications for all piping components.
  • Provided technical guidance on design criteria, construction methods, and materials selection for piping projects.

Piping Engineer

Hyundai Heavy Industries
Kuwait
03.2014 - 09.2018
  • Developed and implemented engineering strategies to improve production efficiency.
  • Provided support during the installation, maintenance, repair, and calibration of equipment.
  • Generated reports summarizing engineering results for internal review.
  • Participated in team meetings to discuss project progress updates.
  • Finished projects on time and within budget.
  • Involved project: Az-zour North IWPP(1,500MW gas-fired combined-cycle power plant & 405,000m³/d) of drinking water)

Project Engineer

Technical sources
Saudi Arabia
10.2010 - 02.2014
  • Assigned tasks to personnel based on their skill sets and monitored progress to ensure timely completion.
  • Managed resources such as equipment, materials, personnel and subcontractors to achieve project goals.
  • Conducted risk assessments and created mitigation strategies for potential risks associated with projects.
  • Identified cost saving measures that could be implemented without compromising safety or quality standards during the project life cycle.
  • Compiled reports detailing progress updates, budget information and other relevant data related to the assigned project.
  • Coordinated meetings with clients, subcontractors and other parties involved in the project.
  • Monitored work performance against established milestones ensuring adherence to approved schedules.
  • Prepared change orders when required due to unforeseen circumstances or additional scope changes requested by client.
  • Ensured all necessary permits were obtained prior to commencement of any works on site.
  • Conducted regular inspections at job sites in order to monitor safety protocols being followed by contractors.
  • Documented lessons learned from completed projects which could be used in future endeavors.
  • Involved project: Marafiq IWPP(16 units of gas fired GE turbines with a net capacity of c.2,700 MW and 27 desalination units manufactured by SIDEM, producing 800,000 m3/day of desalinated water)

Piping Engineer/Draughtsman

Essen Global L.L.C
UAE
11.2009 - 07.2010
  • Reviewed piping designs to ensure conformance with applicable codes and standards.
  • Developed piping layouts using 3D CAD software packages such as AutoCAD.
  • Coordinated the preparation of material specifications for all piping components.
  • Created isometric drawings for installation of new piping systems and modifications to existing systems.
  • Analyzed field measurements to verify accuracy of installed equipment dimensions prior to fabrication or erection activities.
  • Investigated field problems encountered during construction activities related to piping systems or components.
  • Involved project: Firenze FPSO (15,000 bpd of oil and roughly 25 million cubic feet per day of associated gas)

Mechanical Design Engineer

Caresoft Global Pvt. Ltd
India
09.2007 - 07.2009
  • Developed mechanical designs for new products and modified existing products to meet customer requirements.
  • Performed calculations to ensure parts met design specifications such as strength, weight, and cost.
  • Generated technical documentation such as drawings, BOMs, instructions. for manufacturing processes.
  • Developed assembly procedures for complex systems while ensuring precision accuracy of components during assembly process.
  • Verified that all components used in a system complied with industry standards before finalizing the design.

Education

Bachelor Of Engineering - Mechanical Engineering

Raja College of Engineering & Technology
03.2007

Skills

  • MS word
  • MS Excel
  • Powerpoint
  • CAESAR II
  • Stress Analysis Proficiency
  • 3D Modeling Skills
  • Piping Material Take-off
  • Isometric Drawing Creation
  • AUTOCAD
  • PRO-E
  • PDS
  • MICROSTATION
  • PRIMAVERA
  • C and C Language
  • Java

Strength Skills

  • Piping GA,Isometric,standard Support Drawing,plant Layout drawing generate & Reviewing using CAD.
  • Sound Knowledge in modeling of Stress Analysis(Modeling,Reviewing & Analysis Using Caesar II to check Displacements,Forces & Stress on Piping Systems)
  • Knowledge of using international codes and standard used in Oil & Gas Industry(ASME B 31.3) & Power Plant(ASME B 31.1) (API, ASME, ASTM, MSS SP, ISO,NFPA, NACE).
  • Knowledge of various calculation as per ASME B31.3 such as Pipe thickness, High Pressure Pipe Thickness, RF pad etc.
  • Sound knowledge of Piping Material Specification(PMS).
  • Sound knowledge to extract BOM from Isometric & Prepare MTO.
  • Sound Knowledge in P & ID,PFD.
  • Sound Knowledge in Piping Fabrication,Erection & Pre-Commissioning activities.

Disclaimer

I hereby declare that the above written particulars are true to the best of my knowledge and belief.

Languages

Tamil
First Language
English
Advanced (C1)
C1
Hindi
Advanced (C1)
C1

Timeline

Piping Engineer

Keppel Shipyard Limited (currently known as Seatrium Ltd)
06.2022 - Current

Piping Engineer

M/S Dharuna Engineering and Construction
12.2019 - 03.2020

Piping Engineer

Hyundai Heavy Industries
03.2014 - 09.2018

Project Engineer

Technical sources
10.2010 - 02.2014

Piping Engineer/Draughtsman

Essen Global L.L.C
11.2009 - 07.2010

Mechanical Design Engineer

Caresoft Global Pvt. Ltd
09.2007 - 07.2009

Bachelor Of Engineering - Mechanical Engineering

Raja College of Engineering & Technology
Agni Maharaja Kathiresan