Summary
Overview
Work History
Education
Skills
Languages
Hobbies and Interests
Projects
Training
Disclaimer
Personal Information
Resume Headline
Affiliations
Accomplishments
Extracurricular Activities
Timeline
Generic

Ajay Chandra

Raebareli

Summary

Dynamic Site Engineer with proven expertise in installation management and project coordination at Alstom Co. Ltd. Skilled in testing and commissioning, I excel in client relations and team supervision, ensuring timely project delivery. Adept at technical documentation and site inspections, I drive successful outcomes through effective planning and execution. Responsible Site Engineer coordinates and manages multiple third-party and internal providers. Trusted organizer of rapid and diligent workforces. Applies deep technical knowledge and humanistic management skills to reaching project completion under budget and within prescribed timeframes.

Overview

7
7
years of professional experience

Work History

Site Engineer (Team Leader)

1)Alstom co. Ltd.
Mumbai
07.2023 - Current
  • Overall responsibility of Installation, Testing and Commissioning of Mumbai Metro Line 3
  • Preparation of daily planning and progress report to the management and Client
  • Planning and execution of secondary cable tray, PSC cabinet, power system and other electrical equipment installation.
  • Planning and execution of cable laying, Installation and Termination of cables.
  • Installation checking of the PSD system along with clients.
  • Testing and Commissioning of the PSD system along with clients.
  • Installation, Testing, & Commissioning of Prototype system.
  • Installation, Testing, & Commissioning of SCADA system.
  • Integration Testing with signalling system and rolling stock.
  • To supervise and ensure that the maintenance of the PSD equipment is being done properly.
  • Attend regular meetings with clients.
  • Coordinated with other engineers, contractors, subcontractors, inspectors, suppliers, and owners in order to ensure timely completion of projects within budget constraints.
  • Provided technical guidance to field personnel regarding installation of equipment and systems as needed.
  • Maintained records of daily activities including measurements taken at various stages of construction.
  • Supervised a team of junior engineers and construction workers, providing guidance and training.

Installation Manager

2)CRRC Co. Ltd. Mumbai metro line 7
Mumbai
08.2022 - 06.2023
  • Interface with all the contractors to fulfill our requirement and contractor requirement for smooth coordination of work.
  • Attend Interface meeting with client and contractor
  • Preparation of daily planning and progress report to the Management
  • Overall responsibility of Installation, Testing and Commissioning of PSD system on 13 stations of Mumbai Metro Line 7
  • Planning and execution of secondary cable tray, PSC cabinet, power system, and other electrical equipment installation.
  • Planning and execution of cable laying, Installation and Termination of cables.
  • Installation checking of the PSD system along with client.
  • Installation, Testing, & Commissioning of Prototype system.
  • Installation, Testing, & Commissioning of SCADA system.
  • Integration Testing with signaling system and rolling stock.
  • Attend regular meetings with clients and MMMOCL.
  • Assisted in developing detailed plans for each install project, including scheduling timelines and resources needed.
  • Monitored progress of projects on a daily basis and adjusted schedules as necessary to meet deadlines.
  • Provided guidance and direction to team members while ensuring they had access to appropriate resources needed for successful completion of tasks associated with installations.
  • Planned, coordinated, and monitored all aspects of installations to ensure customer satisfaction.
  • Coordinated project management, commissioning, and technical support for installations.
  • Planned and directed site installation work and engineering activities to get equipment and controls set up and verified.
  • Supervised field installation staff and handled escalated issues to maintain progress.

Site Engineer

3)CRRC Co. Ltd./ Sub. Contractor- MCML Pvt Co. Ltd Mumbai metro line 7
Mumbai
04.2021 - 07.2022
  • Overall responsibility of Installation of PSD system
  • Preparation of daily planning and progress report to the Management
  • Attend weekly review meeting with Management
  • Planning and execution of secondary cable tray, PSC cabinet, power system and other electrical equipment installation
  • Prepared detailed engineering plans, drawings, and specifications for the project.
  • Surveyed sites, collected measurements, and assessed project conditions.
  • Inspected project sites to monitor progress and conform to design specifications and safety or sanitation standards.
  • Surveyed project sites to establish reference points to guide construction.

Site Engineer

4)Sub. Contractor-Shakya Enterprises/Kolkata metro rail corporation
Kolkata
09.2018 - 03.2021
  • Installation and alignment of Fixed Door Panel (FDP), Emergency Exit Door (EED) and Platform End Door (PED).
  • Preparation Of daily planning and progress report to the Management
  • Completed site surveys, marked locations and oversaw construction of various projects.

Site Engineer

5)Sub. Contractor-Shakya Enterprises/Noida metro Rail Corporation(Aqua Line)
Noida
02.2018 - 08.2018

Ø Installation and alignment of Fixed Door Panel (FDP), Emergency Exit Door (EED) and Platform End Door (PED).

Ø Preparation Of daily planning and progress report to the Management

Ø Integration Testing with signalling system and rolling stock.

Ø To supervise and ensure that the maintenance of the PSD equipment is being done properly.

Education

B.Tech - Mechanical Engineering

R.B.S. Engineering Technical Campus
Agra
07.2017

Senior Secondary (10+2) -

D.A.V Public School Unchahar
Raebareli
06.2013

High Secondary School -

D.A.V Public School Unchahar
Raebareli
06.2010

Skills

  • Installation management
  • Testing and commissioning
  • Cable laying
  • Integration testing
  • Project management
  • Client relations
  • Technical documentation
  • Site inspections
  • Progress reporting
  • Site supervision
  • Site inspection
  • Team supervision
  • Site survey analysis
  • Scheduling and planning
  • AutoCAD proficiency
  • Contractor relations
  • Work planning

Languages

  • English
  • Hindi

Hobbies and Interests

  • Playing Games
  • Meeting People
  • Watching Movies

Projects

Design and Fabrication of Gear Box, 5

Training

NTPC, 07/18/16, 08/15/16, Unchahar, Raebareli, I learnt the basics of Turbine and Boiler Maintenance

Disclaimer

I hereby declare that the information furnished above is true to the best of my knowledge and belief.

Personal Information

  • Date of Birth: 06/23/92
  • Gender: Male

Resume Headline

B. Tech, Mechanical Engineering with 68.15% and my academic project is Design and Fabrication of Gear Box.

Affiliations

  • · Discipline In charge of Abhiruchi (The Hobby Club) Society.

Accomplishments

  • Btech Degree Honours from Abdul Kalam Technical University,

Extracurricular Activities

Participitated in HSE Safety week challenges

Timeline

Site Engineer (Team Leader)

1)Alstom co. Ltd.
07.2023 - Current

Installation Manager

2)CRRC Co. Ltd. Mumbai metro line 7
08.2022 - 06.2023

Site Engineer

3)CRRC Co. Ltd./ Sub. Contractor- MCML Pvt Co. Ltd Mumbai metro line 7
04.2021 - 07.2022

Site Engineer

4)Sub. Contractor-Shakya Enterprises/Kolkata metro rail corporation
09.2018 - 03.2021

Site Engineer

5)Sub. Contractor-Shakya Enterprises/Noida metro Rail Corporation(Aqua Line)
02.2018 - 08.2018

B.Tech - Mechanical Engineering

R.B.S. Engineering Technical Campus

Senior Secondary (10+2) -

D.A.V Public School Unchahar

High Secondary School -

D.A.V Public School Unchahar
Ajay Chandra