Summary
Overview
Work history
Education
Skills
DECLARATION
Timeline
Generic
A.K. DEEPAK RAJ

A.K. DEEPAK RAJ

Abu Dhabi

Summary

Proficient in AutoCAD, E3, Revit Architecture & MEP (BIM), and MS Office with advanced VBA capabilities. Demonstrates strong technical expertise in design and drafting software, complemented by a solid foundation in building information modelling and electrical schematics. Adept at streamlining workflows and enhancing project efficiency through innovative use of software tools. Committed to leveraging technical skills to contribute to high-quality design solutions and optimised project outcomes.

Overview

14
14
years of professional experience

Work history

Senior Engineer – Installation

Toshiba Elevator Middle East
2024.07 - 2026.07
  • Responsibilities: Elevator & Escalator Installation & Project Coordination
  • Customer & Stakeholder Coordination: Partnered with clients to define project specifications, ensuring smooth execution from planning to final handover. Served as the primary point of contact for resolving installation challenges efficiently.
  • Component Installation & Assembly: Expertly installed and configured elevator systems, including cab frames, doors, motors, and control systems, adhering to technical blueprints and manufacturer specifications.
  • Escalator Installation & Commissioning: Installed and aligned escalator systems including truss structures, step chains, handrails, and drive mechanisms. Ensured precise mechanical and electrical integration in accordance with manufacturer guidelines and site-specific requirements. Conducted functional testing and safety checks to validate operational readiness.
  • Quality Assurance & Compliance: Conducted rigorous inspections of completed installations to verify compliance with safety regulations and quality standards. Performed MIR (Material Inspection Report) and WIR (Work Inspection Report) alongside consultants to validate adherence to project requirements.
  • Performance Optimization: Monitored system functionality post-installation, implementing corrective measures to improve reliability, efficiency, and safety.
  • Electrical Troubleshooting: Diagnosed and rectified electrical malfunctions during installation and commissioning, minimising downtime.
  • Supply Chain Collaboration: Worked closely with procurement and inventory teams to maintain adequate stock of critical spare parts, preventing project delays.
  • Cross-Team Alignment: Synchronized schedules with construction crews to ensure timely installation and overall project completion.

Asst Manager – R&D (Electrical)

Hitachi lifts India pvt ltd
2023.07 - 2024.06
  • RESPONSIBILITIES: Electrical design & Localization
  • Played a key role in cost reduction initiatives for existing volume products by analysing wiring schematics & improving material selection.
  • Conducted feasibility studies and developed new testing equipment to enhance elevator operations, ensuring full functional compatibility and reliability across different systems.
  • Validated new designs through rigorous testing to ensure compliance with safety standards and operational efficiency.

Assistant Manager – GTD/LDC (Electrical)

OTIS India pvt ltd
2022.11 - 2023.06
  • RESPONSIBILITIES: Global Cost Reduction and Standardization Initiatives
  • Played a key role in cost reduction initiatives for existing volume products by identifying and implementing efficiency improvements.
  • Collected and analysed global data (harmonization) to support technical evaluations for cost reduction projects.
  • Gathered and analysed global technical data to support the development of a standardized 'golden module.'
  • Coordinated meetings with global platform owners (Madrid, China, Gein, etc.) to discuss and implement new cost-saving ideas.
  • Worked on standardizing CAD designs globally by contributing to the development of unified CAD standards.

Assistant Manager-Technical Support/NPDI

Toshiba Johnson elevator pvt ltd
2018.05 - 2022.11
  • Responsibilities: New Product Development
  • Developed and qualified vendors for elevator components, ensuring strict compliance with industry codes and standards.
  • Researched, designed, and tested new equipment to enhance elevator operations, focusing on functionality and adaptability.
  • Spearheaded equipment specification, vendor drawing reviews, startup, and commissioning support for critical systems.
  • Conducted performance testing of drives, ARD (Automatic Rescue Device), group control panels, SUP panels, door drive units, and hall fixtures.
  • Led detailed engineering efforts, including installation documentation and wiring manuals for seamless deployment.
  • Drove cost-reduction initiatives for high-volume products through design optimization and supplier collaboration.

Assistant Engineer – R&D/Project Design/Testing

Fujitec India Pvt ltd
2012.06 - 2018.04
  • Research & Development (R&D)
  • Led comprehensive Product Change Management (PCM) for new product development, ensuring rigorous testing, validation, and smooth implementation to enhance product reliability.
  • Designed & developed detailed electrical circuit schematics for elevator control systems, including power distribution, signal interfacing, and safety interlocks, optimizing functionality and maintainability.
  • Developed wiring diagrams to support standardized cable harness designs (hoist-way, traveling, motor), improving assembly efficiency and reducing errors.
  • Conducted thorough compliance studies and verification against IS 14665 and other elevator safety standards to guarantee regulatory adherence.
  • Designed electrical controllers ensuring seamless integration with existing systems, incorporating modular circuit architectures to facilitate upgrades and maintenance.
  • Performed Why-Why analysis to identify and resolve design output errors; documented root causes and corrective actions via SAP to promote continuous improvement.
  • Testing & Validation
  • Tested critical components: drives, ARD, group control panels, SUP panels, door drive units, and fixtures (hall buttons, lanterns, car operation boards, LCD displays) using jigs
  • Provided job-site technical support, troubleshooting errors, and ensuring compliance with safety and performance standards.
  • Electrical Design & BOM Engineering
  • Prepared BOMs for elevator control systems, including schematic development, component selection, and integration of safety interlocks to ensure safe and reliable operation.
  • Reviewed and validated BOMs against electrical design drawings, identifying discrepancies and optimizing material usage to reduce costs and prevent installation delays.
  • Developed electrical designs and BOMs by referencing project specifications and General Arrangement Drawings (GADs), ensuring alignment with site requirements, load capacities, and control logic. Adapted schematics and components for non-standard configurations in compliance with regulatory standards.

Education

B.Tech - EEE

SRM University
Ramapuram

Diploma - EEE

Panimalar Polytechnic College

Skills

  • AutoCAD
  • E3
  • Revit Architecture & MEP (BIM)
  • MS Office & VBA

DECLARATION

I hereby declare that the particulars of information and facts stated herein above are true, correct, and complete to the best of my knowledge and belief. PLACE: ABU DHABI, U.A.E DATE: Yours truly [A.K. DEEPAK RAJ]

Timeline

Senior Engineer – Installation

Toshiba Elevator Middle East
2024.07 - 2026.07

Asst Manager – R&D (Electrical)

Hitachi lifts India pvt ltd
2023.07 - 2024.06

Assistant Manager – GTD/LDC (Electrical)

OTIS India pvt ltd
2022.11 - 2023.06

Assistant Manager-Technical Support/NPDI

Toshiba Johnson elevator pvt ltd
2018.05 - 2022.11

Assistant Engineer – R&D/Project Design/Testing

Fujitec India Pvt ltd
2012.06 - 2018.04

Diploma - EEE

Panimalar Polytechnic College

B.Tech - EEE

SRM University
A.K. DEEPAK RAJ