Assistant Manager at Schneider Electric specializing in installation and testing procedures. Achieved significant improvements in lab productivity and inventory management. Expertise in technical troubleshooting and team supervision, leading to enhanced operational efficiency and customer satisfaction. Dedicated to upholding high standards in equipment maintenance and project management.
Execution of installation and testing procedures for air-cooled and water-cooled chillers.
Supervising two technicians to streamline daily operations.
Analyzing test requirements from internal stakeholders to align objectives.
Performing routine and preventive maintenance on chillers, cooling towers, AHUs, pumps, heaters, humidifiers, and dehumidifiers.
Ensuring the proper calibration of measuring instruments to maintain accuracy.
Managing the inventory of lab consumables to support uninterrupted operations.
Optimizing the productivity in the lab by minimizing test durations.
Maintaining to 5S principles and EHS rules within the workspace.
Executed validation of pre-commissioning standards for VRF and Chiller installations.
Monitored technical parameters of Blue Star VRF and Chiller systems during commissioning.
Installed devices for remote monitoring to enhance system oversight.
Integrated BMS with VRF and Chiller units to streamline operation management.
Delivered services like flow measurement and electrical power analysis when required.
Programmed PCB controllers as needed to maintain project timelines.
Conducted site visits for troubleshooting of various commercial air conditioning systems.
Diagnosed issues in VRF, Chiller, inverter ducted, and package units during critical interventions.
Executed AMC work on HVAC systems including chillers, VRF, cooling towers, pumps, and AHUs.
Supervised manpower across multiple sites to ensure efficient AMC execution.
Managed customer support calls to resolve inquiries and fulfill requirements.
Prepared BOQs tailored to client specifications for accurate project execution.
Analyzed layout drawings to facilitate precise job execution and installation.
Attended kickoff meetings leading to successful system commissioning.
Installed various HVAC systems including chillers, pumps, cooling towers, and split units.
Conducted air and water balancing while preparing testing and commissioning reports.