Summary
Overview
Work History
Education
Designation
Contact Numbers
Qualifications
Personal Information
Timeline
Generic

AKKIREDDY Bala Bhasakara Srinivasa Rao

Visakhapatnam

Summary

Seasoned professional with 22 years in the installation, commissioning, and maintenance of field instruments and control room systems in the oil and gas and refinery industries. Currently involved in project commissioning and maintenance at ADNOC Offshore, ASSEIFIYA Island, focusing on IP phase project activities. Proven track record with leading companies such as KOC, KNPC, PDO, and Technip, delivering successful project outcomes.

Overview

32
32
years of professional experience

Work History

Instrument Technician

M/s.ZADCO/ADNOC
08.2014 - Current
  • Carried out maintenance activities, Well Head Control Systems
  • Commissioning/ Maintenance activities in Upstream Oil & Gas plant including 3 phrase separation.
  • Day to day preventive maintenance and corrective maintenance activities.
  • Day to day Fire & Gas preventive maintenance and corrective maintenance activities.

Instrument Supervisor

Petrofac International Limited
07.2011 - 05.2013
  • Ruwais 4th NGL Train designed to process 27,000TPD NGL\LPG and to produce 4750 TPD Ethane, 7850 TPD Propane 9360 TPD Butane and 3540 TPD Paraffinic Naphtha.
  • The Project overall cost is US $2.1 billion Joint venture between Petrofac Emirates group & GS E&C from M/s. GASCO Ruwais NGL-04 Project, Abudhabi.
  • Handling construction activities in Utility Area consists of 5 Boilers of Mac chi make (Italy) and 3 Instruments Air Compressors.
  • Assign day to day activities to the sub-contractors and Mechanical Completion walk down with client.
  • Start up of Boilers is going at present. IA compressor already commissioned and lined up to IA headers in plant.

Instrument Supervisor

Petrofac International Limited
09.2009 - 12.2010
  • Petroleum Development Oman LLC.
  • Harweel development is one of PDO’s major EOR projects and is based on high pressure miscible gas injection.
  • The Harweel cluster plays a major role in the recovery of PDO’s production and is predicted to contribute over 100,000 bbl per day by 2010.
  • Assist commissioning and support to sub systems wise start-up scope.
  • Implement testing of control narratives and C&E matrices to ensure detailed design specification is achieved.
  • Updating all associated commissioning documents, including 'as Built' mark ups.
  • Cause and effect checking of F&G instruments, ESD safety system and IMCS.
  • Contributing to the Commissioning Group's improvement process and close-out report.
  • Pre commissioning and commissioning activates of all field instruments, F&G instruments and MHMS.
  • Loop checking of all IPS, Foundation field bus instruments, MHMS and IMCS.
  • Power up of control panels and SAT checking.

Instrument Supervisor

Petrofac International Limited
11.2008 - 05.2009
  • Involved in Construction of Hasdrubal Terminal Project LNG/GAS Treatment plant in Tunisia.
  • Involved in Export Compressor Area & LPG construction completion and Clearing A-punch list with client.

Instrument Technician

Petrofac International Limited
12.2006 - 10.2008
  • Involved in pre-commissioning, commissioning & maintenance of Field Instruments for CRU, De salter HP & LP Separators & Scrubbers.
  • Involved in Change over of Existing control System, Relay Logic and F&G System to New Delta-V, Hima, and ICS (F&G) Systems.
  • Also involved in Operations activities.

Instrument Technician

Technip (Abu-Dhabi)
12.2005 - 01.2006
  • Involved in pre-commissioning & commissioning activities in Vapour Recovery unit, separators, de-salters, gas injection LP& MP compressors.

Instrument Technician

Petrofac International Limited
09.2004 - 01.2005
  • Involved in commissioning activities.

Instrument Foreman

M/s. Al - Bahar Jacorossi for instrumentation
09.2002 - 03.2003
  • Involved in daily Preventive Maintenance Jobs.

Instrument Technician

M/s. KHALIFA AL-DAIJ-AL-DABBOOS & Bros. Co.
04.1998 - 09.2001
  • HONEYWELL TDC 3000 DCS for total Plant Process control.
  • HIMA MAKE PLC Systems hooked up with DCS for Emergency & Sequential shut down logics.
  • COOPER BESSEMER make Condensate recovery compressors with Entronic make PLC based FT – 50 Control system.
  • Dehydration, Desalting & Oil/Gas Separation process using Honeywell, Rosemount make Smart Transmitters, Fisher governor & Masoneilan make control valves & level trolls.
  • Computerized maintenance & material management system (MMMS) for day-to-day Plant requirements.
  • Worked on following major Process equipment’s in KOC oil fields: High Pressure & Low-Pressure oil wells, separators, HP/LP gas collection systems, Booster stations, Heaters, De-salters, Tank farm for crude oil storage.
  • Transit pumps driven by Gas Turbines or variable speed drives, Gas Compressors & Wastewater treatment Plants.
  • Modification jobs in Condensate recovery unit, FT-50.
  • Gas Turbine (General Electric make Mark II) modification, revamping jobs in Booster stations and hand on experience in overhauling, shutdown jobs.
  • Experience in Speedtronic Mark –II calibration, Pre-commissioning and commissioning checks.
  • Familiar with Honeywell TDC 3000 and Rosemount RS3 systems.

Instrument Technician

M/s. Bharat Heavy Plates & Vessels Ltd.
Visakhapatnam
08.1996 - 10.1997
  • Company Overview: M/s. Bharat Heavy Plates & Vessels Ltd. Is a Public undertaking Company of India, BHPV manufactures Boilers, Fired Heaters, Gas Processing plants and Oxygen Plant.
  • Involved in calibration, Erection and Commissioning of the Instruments for the 'Crude Stabilization Unit project'.
  • M/s. Bharat Heavy Plates & Vessels Ltd. Is a Public undertaking Company of India, BHPV manufactures Boilers, Fired Heaters, Gas Processing plants and Oxygen Plant.

Instrument mechanic

Protech Controls Pvt. Ltd.
Madras
02.1996 - 07.1996
  • Involved in Erection and Commissioning activities.

Instrument mechanic

Jaya Engineering (P) Ltd.
Visakhapatnam
09.1995 - 12.1995
  • Involved in Erection, Construction & Instrument Commissioning activities.

Apprentice

Coromandel Fertilizers Ltd.
Visakhapatnam
07.1994 - 08.1995
  • Involved in installation of Instruments and Calibration of Instruments Like Pressure & Temperature Gauges, D/P Switches, Flow Switches, Draft Gauges, Temperature Switches and Pneumatic Transmitters and Maintenance of the Instruments.

Instrument Mechanic

Jaya Engineering (P) Ltd.
Visakhapatnam
08.1993 - 07.1994
  • Involved in Erection, Construction & Instrument Commissioning.

Education

Instrument Mechanic -

NCVT (I.T.I)
07.1993

Matriculation -

Andhra University
India
03.1988

Designation

Instrument Supervisor

Contact Numbers

+919000256178, +91 891 2513358

Qualifications

Matriculation, Andhra University-India, 03/01/88, Instrument Mechanic, NCVT (I.T.I), 07/01/93

Personal Information

  • Passport Number: Z4355527
  • Date of Birth: 12/05/72
  • Nationality: India
  • Marital Status: Married

Timeline

Instrument Technician

M/s.ZADCO/ADNOC
08.2014 - Current

Instrument Supervisor

Petrofac International Limited
07.2011 - 05.2013

Instrument Supervisor

Petrofac International Limited
09.2009 - 12.2010

Instrument Supervisor

Petrofac International Limited
11.2008 - 05.2009

Instrument Technician

Petrofac International Limited
12.2006 - 10.2008

Instrument Technician

Technip (Abu-Dhabi)
12.2005 - 01.2006

Instrument Technician

Petrofac International Limited
09.2004 - 01.2005

Instrument Foreman

M/s. Al - Bahar Jacorossi for instrumentation
09.2002 - 03.2003

Instrument Technician

M/s. KHALIFA AL-DAIJ-AL-DABBOOS & Bros. Co.
04.1998 - 09.2001

Instrument Technician

M/s. Bharat Heavy Plates & Vessels Ltd.
08.1996 - 10.1997

Instrument mechanic

Protech Controls Pvt. Ltd.
02.1996 - 07.1996

Instrument mechanic

Jaya Engineering (P) Ltd.
09.1995 - 12.1995

Apprentice

Coromandel Fertilizers Ltd.
07.1994 - 08.1995

Instrument Mechanic

Jaya Engineering (P) Ltd.
08.1993 - 07.1994

Instrument Mechanic -

NCVT (I.T.I)

Matriculation -

Andhra University
AKKIREDDY Bala Bhasakara Srinivasa Rao