Summary
Overview
Work History
Education
Personal Details
Key Responsibilities
Major duties and responsibility
Major duties and responsibilities
Additional responsibilities
Timeline
Generic
AKSHAY KUMAR

AKSHAY KUMAR

HIGHWAY
Sandha

Summary

  • To work in an engineering / construction industry offering outstanding career and professional growth this work
  • As a Dy. MANAGER( DPM in Highways)having Civil Engineering diploma(3years ,Maharashtra Technical Board ) with over 24 year As a Highway Engineer and Structure (execution & design): -
  • Prepare of various type bed like embankment, sub grade, GSB, WMM, DBM & BC Approach Road Junction
  • Median Drain, Kerb Laying, Miscellaneous works of highway, Fixble Pavement WMM,DBM, BM, BC, Road Rigid Pavement: DLC & PQC
  • Fabricating of Structural Steel, temporary arrangements, lifting and launching scheme and also Knowledge
  • Batching plant foundation, Precast long beam, cross beam Casting.
  • RE -Panal Erection Casting, Retaining wall ,Toe wall , Friction Slab precast and Cast in situ etc.

Overview

25
25
years of professional experience

Work History

SP Singla Construction India Pvt Ltd
01.2025 - Current
  • Clint:- NHAI EPC Contrector:-IRCON Hridwar bypass ltd HAM projects Project cost-863cr
  • Duration- Jan 2025 to Till now

SP Singla Construction India Pvt Ltd
12.2021 - 01.2023
  • Clint:- MOtRh EPC Projects NH-96 Six lane bridge and Approch Consultant:- ITC with Dohwa and transteck Project cost- 968cr
  • Duration-Dec 2021 to Jan 2023

ITD Cementation India Ltd (Formely Skanska Cementation India Ltd.)
05.2019 - 03.2021
  • . Major Responsbility..... .CP 30 Batching Plant Foundation, Mobilization ,Labour Colony,Load Out Jety . Precast Long Beam . Project Name:- Bulk Berth, SPI Chhara Port Gujrat . . Client:- SPI (Simar Port Private Ltd). . Consultant:- Royal Hoskoning DHV
  • . Duration :- May 2019 to March 2021

ITD Cementation India Ltd (Formely Skanska Cementation India Ltd.)
12.2015 - 08.2018
  • .Major Responcebilityt Lng tank Base Slab, Wall ,Lng tank perifaric Road , Link Road ,Drain . Project Name:-Two LNG Storage Tank IHI MUNDRA GUJRAT . Client:- IHI Japan . CONSALTANT:- WESSHOSE OIL and GAS Limited . HOWNER:- G S P C LNG LTD
  • . Duration:-Dec 2015 to Aug 2018 . Delhi office Aug 2018 to May 2019.

ITD Cementation India Ltd (Formerly Skanska Cementation India Ltd.)
07.2013 - 12.2015
  • Project Name: Civil and structural for raw water pumping cum station at eklehara, Nasik. Dharna pipe ov
  • Consultant :- INDIABULLS REAL TECH LTD
  • Duration: -From July, 2013 to Dec,2015

ITD Cementation India Ltd (Formerly Skanska Cementation India Ltd.)
04.2012 - 07.2013
  • Project Name: Widening 8 lanes upgrading of existing 4 lanes road and Auxiliary works in the state of
  • Client: - NATIONAL HIGHWAY AUTHORITY OF INDIA
  • EPC :- P.S TOLL ROAD PVT. LTD (RELINCE INFRA LTD)
  • Duration: -From April 2012 to July 2013.

ITD Cementation India Ltd (JV)
12.2011 - 04.2012
  • Project Name: Civil and structural works for Domestic and International Airport Link Road, Air side Road
  • Consultant :- AIRPORT AUTHORITY OF INDIA
  • Duration: -December 2011 to April 2012

ITD Cementation India Ltd (Formerly Skanska Cementation India Ltd.)
11.2005 - 12.2011
  • Project Name: - Widening of 4 to 6 lanes upgrading of existing 2 lanes road and Auxiliary works in th
  • Client: - NATIONAL HIGHWAY AUTHORITY OF INDIA
  • Consultant :- LASA, FEEDBACK (J.V)
  • Duration: -From November 2005 to December 2011

Engineer

Actya construction Pvt. Ltd.
09.2002 - 11.2005
  • Project Name: - Four lining & strengthening of existing 2 lane Section between km 180 to km 240 on NH=2
  • Client = GAMMON INDIA LTD.
  • Consultant :- SMEC INTERNATIONAL PVT LTD.
  • Duration: - from September 2002 TO November 2005 as a Engineer.

Surveyor

Actya construction Pvt. Ltd.
08.2001 - 08.2002
  • Project Name: - Four lining & strengthening of existing 2 lane Section between km 180 to km 240 on NH
  • Client: - NATIONAL HIGHWAY AUTHORITY OF INDIA
  • Consultant :- C E S PVT LTD
  • Duration: August 2001 to August 2002.

Site Engineer (Contract Base)

National Project Construction Corporation
08.2000 - 08.2001
  • Project Name: Marhowrah Polytechnic Collage
  • Client: - P W D
  • Duration: August 2000 to August 2001

Education

B.Geography (Hons) - undefined

J.P University
01.1998

Diploma - Civil Engineering

Maharashtra Board of Technical Education
01.1997

undefined

Intermediate Consil
01.1995

undefined

B.S.E.B
01.1993

Personal Details

a) Father's Name: Late Bishwa Nath Singh b) Permanent Address :At+Post - Sandha Ayodhya Nagar , Near Trector Agency ,Sandha ,Dist: Chhapra,(Bihar) c) Date of Birth:-10 August 1976 I hereby declare that the information furnished above is correct to best of my knowledge and belief. Place: Date: (AKSHAY KUMAR)

Key Responsibilities

  • # Key Responsibilities
  • Define Project scope, time line , budget,and allocation resources effectively.
  • Day to Day DPR prepration
  • Design,testing and all Construction.
  • Cordinate of Consultant,PRW Contrector and Staff.
  • Supervision at site day to day,timely compliance Resolve.

Major duties and responsibility

  • Establishment of B.M.P and TBM of the project and getting approval from consultants.
  • Taking O.G.L of road's and structures and getting approval from consultant.
  • Preparation of Highway field data (i.e. FRL, Lear d
  • Preparation of typical cross- section of road for calculates the quantity.

Major duties and responsibilities

  • Responsible for establishment of Control Point, T.B.M .and B.M.P. and getting approval from consultant. La
  • DLC & PQC
  • Also responsible for preparation of various bed i.e. sub grade, G.S.B, W.M.M, D.B.M, BC and also getting ap
  • Preparation of daily site progress report (quantity and turn over in respect of planning program)

Additional responsibilities

  • Responsible for redesigns and resetting of vertical and horizontal profiles as per IRC refer for suitable at sit
  • Determine the actual skew angle of structure (Pipe culvert and Drain)
  • Preparation of Working drawing of all kind of structure, cross section of road , and calculate the quantity a

Timeline

SP Singla Construction India Pvt Ltd
01.2025 - Current

SP Singla Construction India Pvt Ltd
12.2021 - 01.2023

ITD Cementation India Ltd (Formely Skanska Cementation India Ltd.)
05.2019 - 03.2021

ITD Cementation India Ltd (Formely Skanska Cementation India Ltd.)
12.2015 - 08.2018

ITD Cementation India Ltd (Formerly Skanska Cementation India Ltd.)
07.2013 - 12.2015

ITD Cementation India Ltd (Formerly Skanska Cementation India Ltd.)
04.2012 - 07.2013

ITD Cementation India Ltd (JV)
12.2011 - 04.2012

ITD Cementation India Ltd (Formerly Skanska Cementation India Ltd.)
11.2005 - 12.2011

Engineer

Actya construction Pvt. Ltd.
09.2002 - 11.2005

Surveyor

Actya construction Pvt. Ltd.
08.2001 - 08.2002

Site Engineer (Contract Base)

National Project Construction Corporation
08.2000 - 08.2001

B.Geography (Hons) - undefined

J.P University

Diploma - Civil Engineering

Maharashtra Board of Technical Education

undefined

Intermediate Consil

undefined

B.S.E.B
AKSHAY KUMARHIGHWAY