Summary
Overview
Work History
Education
Skills
travelling ,reading and music
Timeline
Akshay Murkute

Akshay Murkute

Pune

Summary

Dynamic Project Engineer with a proven track record at Buen Manejo Del Campo India Private Limited, excelling in project management and team coordination. Spearheaded the successful design and commissioning of a biogas genset, enhancing renewable energy solutions. Adept at planning and deployment, driving efficiency and innovation in engineering projects.

Overview

12
12
years of professional experience
4
4
years of post-secondary education

Work History

Project Engineer-R&D

Buen Manejo Del Campo India Private Limited
06.2023 - Current
  • Designed and implemented project plans ensuring alignment with client specifications and industry standards.
  • Collaborated with cross-functional teams to optimize project workflows and enhance communication.
  • Managed project documentation, ensuring accuracy and compliance with regulatory requirements.
  • Project Planning, Budget Management, Team Coordination, Feasibility Studies, Timeline Management.

Genset Projects

  • Spearheaded the design, installation, and commissioning of a 7.5 kVA biogas genset, leveraging organic waste to provide renewable electricity for a rural household.
  • Converted a standard diesel engine to run on 100% biogas by installing a specialized conversion kit, resulting in a more sustainable energy source.
  • Coordination with the throttle, control panel, and canopy vendor to meet the product requirement.
  • Coordination with the field team for installation and commissioning to test the genset in the field.

Senior Design Engineer

BGLIIN Electricals Ltd
04.2014 - 06.2023
  • Led design projects from concept to completion, ensuring alignment with client specifications and industry standards.
  • Mentored junior engineers, fostering skill development and enhancing team performance.
  • Developed innovative systems, improving efficiency and reliability of designs as well as manufacturing
  • Collaborated with cross-functional teams to integrate feedback and optimize design solutions.
  • Standardized documentation procedures across the department; improving overall consistency within project files.
  • Implemented rigorous testing protocols to validate designs, leading to increased reliability and reduced field failures.
  • Developed comprehensive engineering documents for all projects.


Projects -

  • 70A Starter Relay for HMCL.
  • 100A Starter Relay for Bajaj BS6.
  • Solenoid for John Deere wet clutch application.

Education

B.E. Mechanical -

MIT Engineering College , Aurangabad
06.2009 - 02.2013
  • Completed Coursework: CAD CAM Course at Pune, 2014

Skills

Project management

travelling ,reading and music

Travelling with friends family ,Reading historical books and listing music 

Timeline

Project Engineer-R&D - Buen Manejo Del Campo India Private Limited
06.2023 - Current
Senior Design Engineer - BGLIIN Electricals Ltd
04.2014 - 06.2023
MIT Engineering College - B.E. Mechanical,
06.2009 - 02.2013
Akshay Murkute