Summary
Overview
Work History
Education
Skills
travelling ,reading and music
Timeline
Akshay Murkute

Akshay Murkute

Pune

Summary

Dynamic Project Engineer with a proven track record at Buen Manejo Del Campo India Private Limited, excelling in project management and team coordination. Spearheaded the successful design and commissioning of a biogas genset, enhancing renewable energy solutions. Adept at planning and deployment, driving efficiency and innovation in engineering projects.

Overview

12
12
years of professional experience
4
4
years of post-secondary education

Work History

Project Engineer-R&D

Buen Manejo Del Campo India Private Limited
06.2023 - Current
  • Designed and implemented project plans ensuring alignment with client specifications and industry standards.
  • Collaborated with cross-functional teams to optimize project workflows and enhance communication.
  • Managed project documentation, ensuring accuracy and compliance with regulatory requirements.
  • Project Planning, Budget Management, Team Coordination, Feasibility Studies, Timeline Management.

Genset Projects

  • Spearheaded the design, installation, and commissioning of a 7.5 kVA biogas genset, leveraging organic waste to provide renewable electricity for a rural household.
  • Converted a standard diesel engine to run on 100% biogas by installing a specialized conversion kit, resulting in a more sustainable energy source.
  • Coordination with the throttle, control panel, and canopy vendor to meet the product requirement.
  • Coordination with the field team for installation and commissioning to test the genset in the field.

Senior Design Engineer

BGLIIN Electricals Ltd
04.2014 - 06.2023
  • Led design projects from concept to completion, ensuring alignment with client specifications and industry standards.
  • Mentored junior engineers, fostering skill development and enhancing team performance.
  • Developed innovative systems, improving efficiency and reliability of designs as well as manufacturing
  • Collaborated with cross-functional teams to integrate feedback and optimize design solutions.
  • Standardized documentation procedures across the department; improving overall consistency within project files.
  • Implemented rigorous testing protocols to validate designs, leading to increased reliability and reduced field failures.
  • Developed comprehensive engineering documents for all projects.

Projects -

  • 70A Starter Relay for HMCL.
  • 100A Starter Relay for Bajaj BS6.
  • Solenoid for John Deere wet clutch application.

Education

B.E. Mechanical -

MIT Engineering College , Aurangabad
06.2009 - 02.2013
  • Completed Coursework: CAD CAM Course at Pune, 2014

Skills

Project management

Planning and deployment

Prototype development

Design Review and release for development

Technical content creation

Design Optimization

travelling ,reading and music

Travelling with friends family ,Reading historical books and listing music 

Timeline

Project Engineer-R&D - Buen Manejo Del Campo India Private Limited
06.2023 - Current
Senior Design Engineer - BGLIIN Electricals Ltd
04.2014 - 06.2023
MIT Engineering College - B.E. Mechanical,
06.2009 - 02.2013
Akshay Murkute