Summary
Overview
Work History
Education
Skills
Languages
Hobbies and Interests
Projects
Disclaimer
Well Known Concepts
Personal Information
Timeline
Generic

Akshay Nandkumar Veer

Pune

Summary

Dynamic SR. Fabrication Engineer with a proven track record at Elements Prefab Pvt Ltd, excelling in project management and innovative fabrication techniques. Spearheaded productivity improvements, achieving significant cost reductions while enhancing quality control. Adept at leading teams and implementing effective operational strategies to drive business growth and efficiency.

Overview

10
10
years of professional experience

Work History

SR.Fabrication Engineer

Elements Prefab Pvt Ltd
09.2019 - Current
  • Supervising for fabrication of Heavy Structural Steel, PEB and erection of Heavy steel structures and Pressed Components.
  • To achieve Daily, Weekly and monthly production target for Heavy, sheet metal fabrication and Press components.
  • Development of new product.
  • Ability to identify problem and resolutions in the areas of Production and Planning.
  • Productivity improvement through process study.
  • Preparation of schedule for projects or production.
  • Preparation of optimized cutting plan to reduce the scrap and off cuts.
  • Preparation of daily, weekly and monthly production reports.
  • Preparation of monthly, yearly material reconciliation statement.
  • Allocation of work for sub contractors.
  • Preparation for dispatch clearance report.
  • Preparation of inspection report documents.
  • Review of Daily Production, Quality and Blasting & Painting reports.
  • Participating daily operation review meeting.
  • Maintaining the quality control and quality assurance.
  • Planning for Dispatch and arrange the transport dispatch.
  • Review of Dispatch documents like DA.
  • Monitoring and control the preventive maintenance of all machines.
  • Supervising and maintain the tool history card.
  • Preparation and submission of bills to clients.
  • Co-ordination with client and third party inspection agencies for execution of job.
  • Co-ordination with Design and Quality department to increase the production.
  • Certifying sub contractor's bills.
  • Indent for Special Tools & Tackles for fabrication.
  • Allocation of cranes for contractors.
  • Certifying Materials issue slip to contractors.
  • Responsible for 5S activities in shop floor and maintaining OEE records and maintain safe atmosphere inside the plant.
  • Preparation of MIS for Production, quality on monthly.
  • Verify the Paint, Consumable, Raw materials stock on store.
  • Supervising of Blasting & Painting of steel

SR.Fabrication Engineer

Icon Turnkey Ventures LLP
03.2018 - 08.2018
  • Managed and directed more than 50 employees in all operations of the fabrication & erection of Wright Line product.
  • Designed and implemented raw material storage layout to support company growth and reduce costs.
  • Implemented raw material tracking software to assist with inventory accuracy, as well as reduced handling and searching.
  • Managed the execution of World Class Manufacturing including the implementation of Kanban for raw materials utilized during fabrication.
  • Improved complete and on-time shipments by leading a Kaizen Team reorganization of material flow from the paint line to assembly.
  • Plan & Co-ordinate production process on daily basis to produce high quality products.
  • Develop process improved mints to effectively utilize equipment & materials to maximize production.
  • Develop Operational Strategies to achieve production & financial objectives.
  • Document & utilize current production procedures to improve company standards & production department.
  • Developed & maintain documentation for entire production activities.
  • Reporting To manager.

JR. Fabrication Engineer

Suroj Buildcon Pvt.Ltd
Pune
06.2015 - 02.2018
  • Analyze all root causes or all fabrication issues & resolves same & implements all new process tools according to required order.
  • Design various ideas for all ladders & gantries & prepare detail drawings for all fabrication processes.
  • Prepare estimates & quotes for all supply materials & assist to fabricate & Weld all productes.
  • Coordinate With Sales Team & Prepare All Product designs & Develop products for R & D team.
  • Maintain Quality for All Fabrication from Conceptualize action To Implementation & Perform Inspection for All Painting & Sandblast.
  • Studying drawing and preparing front plan for fabrication of spools as per site requirement.
  • Responsible for fabrication and erection of critical piping system like main stream, feed water, extraction system, steam dump etc.
  • Responsible for erection and placement of heavy equipment's like heater, pump, tank.
  • Preparing all protocols and document related to fit-up, fabrication and erection.
  • Managing all documents fit up report and works as per client procedure and requirement.

Education

DME -

Vidya Pratishthans Polytechnic College
Indapur
01.2015

H.S.C -

S.W.V Walchandnager
Walchandnager, Maharashtra
01.2011

S.S.C -

S.W.V Walchandnager
Walchandnager, Maharashtra
01.2009

Skills

  • Project management and scheduling
  • Fabrication techniques and processes
  • Steel structure and pressure vessel fabrication
  • Material take-offs and costing
  • Welding procedures and inspections
  • Design engineering and project monitoring
  • Business development strategies

Languages

  • Marathi
  • Hindi
  • English

Hobbies and Interests

  • Playing Games
  • Reading
  • Driving
  • Listening Music

Projects

Kino Electric Converter, One Year, Kino Electric Converter Is A Machine Which Converts Reciprocating Motion into Rotary Motion Using Gear.

Disclaimer

I hereby declare that all the information provided by me in this application is actual and correct to the best of my knowledge and belief.

Well Known Concepts

  • Welding Technology
  • Production Technology
  • Automobile Engineering
  • Fabrication Engineering

Personal Information

Passport Number: U1787042

Timeline

SR.Fabrication Engineer

Elements Prefab Pvt Ltd
09.2019 - Current

SR.Fabrication Engineer

Icon Turnkey Ventures LLP
03.2018 - 08.2018

JR. Fabrication Engineer

Suroj Buildcon Pvt.Ltd
06.2015 - 02.2018

DME -

Vidya Pratishthans Polytechnic College

H.S.C -

S.W.V Walchandnager

S.S.C -

S.W.V Walchandnager
Akshay Nandkumar Veer