Summary
Overview
Work History
Education
Skills
Spend time in Nature.
Timeline
Generic

ALTAF K PATEL

Mangalore,KA

Summary

Accomplished Project Manager with a proven track record at New Consolidated Construction Company Ltd., adept in operations management and staff development. Spearheaded multiple high-stakes projects, ensuring completion within deadlines and quality standards. Expert in staff management, with a focus on fostering teamwork and enhancing operational efficiency. Demonstrates exceptional problem-solving skills and a commitment to excellence.


Qualified Manager with 17 years of proven work experience in civil construction. Planning for resources and procurement for execution work for the completing of the Project .Project execution Coordination with Clint, PMC and Architect for execution of Residential project, High Rise Buildings, Expertise in construction engineering, Specialization in structures, finishing(block masonry, plastering, floor tiling & Painting), Managing the site and supervision, engineering analysis, management and dealings with clients and consultants to complete the project on scheduled time. A dedicated excellent analytical, problem solving, planning, estimation, costing, client meeting, supervision,

Overview

17
17
years of professional experience

Work History

Assistant General Manager

Urbanize Group
05.2023 - Current

§ Responsibility for all completion of the Project with in time, cost and Quality.

§ Planning for Material, mobilization of the labour and execution work for the completion of the project..

§ Execute finishing works such as plastering, floor tiling, painting etc.

§ Execute interiors works such as wall piping, false ceiling, wood flooring,

§ Responsible for the overall execution of structure and finishing works formwork and steel reinforcement.

§ Monitoring daily basis and resolving the issues in concern with Quality .Allocate required resources like material, manpower and machines to priority works. Discuss with Project engineers and supervisors on day today progress.

§ Through review of drawing on Constructability and missing details in drawings and raising Request for information to Design Consultants.

§ Quality of materials through inspection and testing done by QC Engineer

§ Ensuring Pre and Post Construction Checks are done as per Checklists

§ Quality plan in the project.

§ Knowledge of materials, methods, and the tools involved in the construction or repair of houses, buildings or other structures Estimating sizes, distances, and quantities; or determining time, costs resources or materials needed to perform a work activity.

§ Coordinate with client Engineer and prepare bar chart by using MS Project and schedule bar bending. Handle bill certification, variation of contractors and quantity surveying.

Project Manager

New Consolidated Construction Company Ltd.
07.2013 - 04.2023
  • Successfully managed multiple projects simultaneously by prioritizing tasks according to urgency, resource availability, and alignment with organizational goals.
  • Planned, designed, and scheduled phases for large projects.
  • Met project deadlines without sacrificing build quality or workplace safety.
  • Established effective communication among team members for enhanced collaboration and successful project completion.

Assistant Engineer

Ivrcl Infrastructure Private
08.2009 - 07.2013
  • Assisted in the development of technical specifications for engineering projects, ensuring accuracy and adherence to established guidelines.
  • Contributed to successful project completion by assisting with on-site inspections, testing, and quality control measures.
  • Reduced production downtime by troubleshooting equipment failures and implementing preventive maintenance measures.
  • Assisted in development, design and execution of projects.

Junior Engineer

New Consolidated Construction Company Ltd.
06.2007 - 08.2009
  • Ensured compliance with safety regulations during all phases of project implementation, resulting in zero incidents or accidents onsite.
  • Reduced production costs by implementing cost-saving measures in materials procurement and manufacturing processes.
  • Evaluated existing systems and processes to identify areas for improvement, leading to increased operational efficiency across projects.
  • Collaborated with engineering team to determine project specifications.

Education

Bachelor of Engineering - Civil - Civil Engineering

T K I E T
Kolhapur, India
06-2007

Associate of Science - HSC- Science

Devachand College Arjunnagar,
06-2003

Skills

  • Staff Management
  • Work Execution
  • Operations Management
  • Staff Development

Spend time in Nature.

I Have habit to spend time in nature whenever get free time. I like to play Carom. 

Timeline

Assistant General Manager

Urbanize Group
05.2023 - Current

Project Manager

New Consolidated Construction Company Ltd.
07.2013 - 04.2023

Assistant Engineer

Ivrcl Infrastructure Private
08.2009 - 07.2013

Junior Engineer

New Consolidated Construction Company Ltd.
06.2007 - 08.2009

Bachelor of Engineering - Civil - Civil Engineering

T K I E T

Associate of Science - HSC- Science

Devachand College Arjunnagar,
ALTAF K PATEL