Summary
Overview
Work History
Education
Skills
Disclaimer
Personal Skills:
Personal Details:
Timeline
Generic
Aman Kumar

Aman Kumar

Testing & Commissioning Engineer

Summary

Seeking a challenging position in a dynamic and well-established company that utilize my skills and abilities & make me unique in the industry that will result progress in all dimensions.

Overview

4
4
years of professional experience
1
1
Language

Work History

QA/QC Engineer

SIEMENS
11.2023 - Current
  • SAT& site Work activity inspection as per approved drawings / Specification.
  • Coordinated with clients, execution agencies, and subcontractors to facilitate quality surveillance activities, meetings, and improvement initiatives. Played a key role in forming a Quality Committee comprising the Project Director, Project Head, selected project members, and stakeholder representatives
  • Quality audit of work i.e. reviews of documents/stage inspection report/lab test reports etc. as per relevant standards.
  • Testing & Witness of equipment – (like- Power Transformer, ICT, Reactor,NGR,NIFPS CVT, LA, WT, CT, PT, Bushing, EOT crane , GIS & HT,MV Power Cabals Earthing etc.
  • Surveillance/Witness audit at time of transformer, Reactor, ICT, GIS, EOT and Electrical Panel, installation etc. and raising the punch points and NCR and Co-ordinate with client and execution agency in closing the NCR as per corrective and preventive action.
  • Prepare field quality plan, Work method statements, checklist, training calendar, Mock-up report and MIS tracker, etc.
  • Preparation & presentation of monthly, weekly & Daily progress report
  • Preparation & presentation of Commissioning report.
  • Review of all documents like. WMS, FQP, QAP, FAT/FWT report, testing procedure & Test report, etc. in line with document code & IS/IEC code of practice and as per standards.
  • FA, PA, BAS installation & testing commissioning etc
  • Prepare field quality plan, training calendar, Mock-up report and MIS tracker, etc.
  • Prepare Installation checklist, commissioning checklist.
  • HVAC Installation and testing for AHU, FAHU, exhaust and supply fan.
  • RCA, IMIR, BOM, RFI, & QC inspections
  • Test reports preparation for data center from L2-L3 MEP, PSI, QAQC, EE, STARTUP, TAB, THERMOGRAPHY, BAS, EPMS, Report testing witness & Solving ROW problem
  • Presentation of monthly, weekly & Daily progress report & Testing & Commissioning reports.
  • Provide quality training for every work along with mock-up as per activity.
  • Co-ordinate with clients to eliminate disputes at site to completing the project smoothly. Maintained SFQP as per client standard.
  • Raising the punch points and NCR and Co- ordinate with client and execution agency in closing the NCR as per corrective and preventive action.
  • Client: ADANI (MICROSOFT COSTUMER)
  • Project Name: 220KV/33KV GIS Substation Microsoft Data Center HYD01 & HYD11
  • Location - Hyderabad.

Testing Engineer

OM ELECTRICAL
10.2021 - 10.2023


  • Conducted testing and commissioning of Power Transformer, Reactor, NGR (Neutral Grounding Resistor), NIFPS (Nitrogen Injection Fire Protection System), Lightning Arrester (LA), CT, PT, Bushings, VCB, SF6 Circuit Breakers, ACB, LT Panels, HT Panels, GIS, MV/HT Power Cables, EOT Cranes, and Earthing System Testing.


  • Location - Many Location

Education

Secondary (10TH) -

K.S Inter Collage

Diploma - Electrical Engineer

Rajeev Gandhi institute of technology & Managements

Skills

Working knowledge in advanced excel, word and PPT

Disclaimer

I hereby declare that all the above statements are true to the best of my knowledge and belief. Place: Hyderabad Date

Personal Skills:

An effective communicator with a positive attitude & excellent interpersonal, learning, planning & co-ordination skills and team-oriented approach coupled with an ability to manage stress, time and people effectively. Achievement oriented with willingness to learn and a team facilitator having ability to lead the team in delivering positive results.

Personal Details:

  • Name: Aman Kumar
  • Date of birth: 2002-09-30
  • Father's Name: Ranvir Singh
  • Gender: Male
  • Marital Status: Single
  • Nationality: Indian

Timeline

QA/QC Engineer

SIEMENS
11.2023 - Current

Testing Engineer

OM ELECTRICAL
10.2021 - 10.2023

Diploma - Electrical Engineer

Rajeev Gandhi institute of technology & Managements

Secondary (10TH) -

K.S Inter Collage
Aman KumarTesting & Commissioning Engineer