To work in an organization, with invigorate enthusiasm, to prove my zeal for excellence, by discharging all my duties honestly
Overview
12
12
years of professional experience
1
1
Certification
3
3
Languages
Work History
Assistant Manager in Manufacturing department
Valeo India Pvt Ltd
12.2022 - Current
Supervised day-to-day operations to meet performance, quality and service expectations.
Improved customer satisfaction by addressing and resolving complaints promptly.
Prepare and maintain the daily Production and DLE report.
Participate in ISO/IATF audit preparation.
Prepare and procure the consumables required for production.
Participate in the daily APU QRQC meeting to discuss the previous day's issues, and take assignments to resolve and escalate them when required for management support.
Attend the daily stop scrap meeting and gemba round to eliminate scrap generation on the production lines.
Facilitated clear communication between employees and upper management through regular meetings and updates.
Ensured compliance with all safety regulations by conducting regular inspections of equipment/operations within the store.
Sr Engineer in Production department
Tenneco Clean Air India Pvt Ltd
06.2020 - 12.2022
Production plan as per the given PPC schedule.
Handle manpower and make a shift roster on a weekly basis.
I took a meeting with the team to discuss the production plan versus the actual output.
Maintain 4M loss, and review daily.
Maximize machine uptime with the support of the maintenance team.
Maintain the machine tools' spare list, and update it weekly.
Make a layout plan for new machines to maximize production output.
Involvement in KAIZEN activities for continuous improvements.
Handling and maintaining the ISO/TS documents.
Prepare the OEE report.
Implemented the Focus Factory concept at our line to make independent decisions for the growth of the line and the company.
Assembly line Engineer in Manufacturing department
Motherson Sumi Systems Ltd, Pithampur (M.P)
07.2018 - 06.2020
Monitor the daily production target as per the scheduled time, with quantity and quality.
Manpower handling & planning
Make shift roster and absenteeism planning.
Attending to the workers' complaints and resolving them.
Ensure the next shift kitting is done as per the PPC plan.
I took a morning meeting with TEAM10 members.
Analysis of customer complaints, and verification of past concern actions.
Attend meetings for continuous improvement on the shop floor.
Maintain 6's on the production floor.
Participate in cost-saving projects.
Ensure a healthy and safe work environment.
Production Engineer in Production department
Galaxy Components Pvt. Ltd, Pithampur (M.P)
08.2014 - 06.2018
Managed production schedules, ensuring timely delivery of products while maintaining high quality standards.
I took the morning meeting with the shop floor supervisors and decided on daily targets.
Performed root cause analysis and implemented corrective actions.
Provided technical support to troubleshoot equipment issues, minimizing downtime and maintaining production targets.
Minimize the setup changeover time by proper planning.
Participated in safety audits, ensuring a secure working environment for all employees.
Analyzed data trends from daily operations reports, identifying areas where efficiencies could be improved upon.
Streamlined workflows to reduce bottlenecks and improve overall productivity rates.
Identified risk mitigation actions to reduce injuries, accidents and hazards in production environment.
Education
Bachelor of Engineering - Mechanical Engineering
RGPV University
Bhopal (M.P)
05-2014
Higher Secondary - 12th
M.P.Board
Ujjain (M.P)
06-2010
High school - 10th
M.P.Board
Ujjain (M.P)
05-2008
Skills
Operations management
Documentation and reporting
Teamwork and collaboration
Staff training and development
Workplace safety compliance
Certification
Auto CAD
Interests
Playing Cricket, Cooking & Drawing
DECLARATION
I hereby declare that the above mentioned details are true and correct to the best of my knowledge and belief. Date: Amit Dhanesha Current Location: Pune(M.H)
ACADEMIC TRAINING
30days summer training from Kirloskar Brothers Ltd. Dewas (M.P) in 6th semester (June, 2013)
PERSONAL DETAILS
Father’s name: Mr. Kailash Dhanesh a
Date of Birth: 15 April,1991
Gender: Male
Marital status: Married
Languages known: Hindi, English
Permanent address: Flat-1208 Mangalam Paradise Pune (M.H)
Timeline
Assistant Manager in Manufacturing department
Valeo India Pvt Ltd
12.2022 - Current
Sr Engineer in Production department
Tenneco Clean Air India Pvt Ltd
06.2020 - 12.2022
Assembly line Engineer in Manufacturing department
Assistant Manager to Site Manufacturing Lead at Pepsico India Holdings Pvt. Ltd.Assistant Manager to Site Manufacturing Lead at Pepsico India Holdings Pvt. Ltd.