Overview
Work History
Timeline
Hi, I’m

Amit Gupta

Jodhpur,Rajasthan
Amit Gupta

Overview

16
years of professional experience

Work History

Nuvoco Vistas Corp. LTD.
Beawer, Rajasthan

Sr. Manager – E&I
10.2021 - Current

Job overview

  • Working as Instrument Head
  • Looking after the Guidance to Section heads
  • Provide support in troubleshooting
  • Fullfilling Environmental Statutory compliances (Instrumentation)
  • Fullfilling AREB Elora Compliance
  • Material & spare planning
  • Ensure Critical spare availability
  • OEM Service support
  • Budget Planning
  • Shutdown Planning
  • Kiln Capacity enhancement Project carried in our Plant from 5000 TPD to 6000 TPD. We have successfully hooked up project with Plant during KSD,23.

Jojobera Cement Plant

Manager – E&I
09.2020 - 09.2021

Job overview

  • Company Overview: Asia’s largest Grinding Unit with 7 MT capacity
  • Worked as Packing Plant In charge
  • Looking after the 11 Packer of 16 Spout with double discharge (FLSmidth, Beumer Ceverax, Enexco).
  • 8 Truck loading Machine.
  • 52 Wagon Loading Machine.
  • Bulker Loading System.
  • Weighbridge.
  • Silo Extraction
  • New works in Packing plant
  • Also Worked as Packing plant Project and commissioning engineer
  • Commissioned 3 FLS Packer
  • Commissioned 2 FLS Truck Loader
  • Commissioned 12 FLS Wagon Loader
  • Asia’s largest Grinding Unit with 7 MT capacity

Mejia Cement Plant

E&I Planner
08.2019 - 08.2020

Job overview

  • Company Overview: Greenfield Grinding Unit
  • Looking after the Manpower Planning
  • Material & spare planning
  • Ensure Critical spare availability
  • OEM Service support
  • Shift scheduling
  • Hands on in SAP
  • Budget Planning
  • All types of PR raising in SAP
  • Shutdown Planning
  • Greenfield Grinding Unit

Mejia Cement Plant

Packing Plant In charge
12.2009 - 07.2019

Job overview

  • Company Overview: Greenfield Grinding Unit
  • Looking after the 12 Spout Packer with double discharge.
  • Truck loading Machine.
  • Wagon Loading Machine.
  • Bulker Loading System.
  • Weighbridge.
  • Silo Extraction
  • New works in Packing plant
  • Successfully done VAC project.
  • Successfully done WRC project.
  • Successfully done the Packer performance improvement project.
  • Worked as Independent Shift Engineer
  • Handling of ABB DCS, MIMIC Display and HMI Systems
  • Level sensor, flow control gates, weighing systems
  • Ball Mill section, truck-loading machine, electronics packer, weigh feeder, solid flow feeder, belt weigher.
  • Looking after the Transformers up to 12 MVA, HT & LT switchgears & protection system of sub-station
  • PCC & MCC, material handling system and UPS system & other electronic instruments.
  • Greenfield Grinding Unit

Arasmeta Cement Plant
Bilaspur

E&I Trainee (GET)
04.2009 - 11.2009

Job overview

  • Company Overview: Integrated Unit
  • Worked for maintenance & inspection.
  • Acquired knowledge of commissioning of Gas Analyzer.
  • Worked as a team member of Clinker Silo Project.
  • Integrated Unit

Jojobera Cement Plant
Jamshedpur

E&I Trainee (GET)
08.2009 - 04.2009

Job overview

  • Company Overview: Grinding Unit
  • Worked for total shift operation in E&I and Mechanical Section.
  • Acquired knowledge of Allen Bradley PLC.
  • Looking after the Ball Mill, Roller Press Section.
  • Grinding Unit

Timeline

Sr. Manager – E&I
Nuvoco Vistas Corp. LTD.
10.2021 - Current
Manager – E&I
Jojobera Cement Plant
09.2020 - 09.2021
E&I Planner
Mejia Cement Plant
08.2019 - 08.2020
Packing Plant In charge
Mejia Cement Plant
12.2009 - 07.2019
E&I Trainee (GET)
Jojobera Cement Plant
08.2009 - 04.2009
E&I Trainee (GET)
Arasmeta Cement Plant
04.2009 - 11.2009
Amit Gupta