Amit Jilka

Amit Jilka

Jamnagar

Summary

Led the installation & commissioning activities involving resource planning, team building and co-ordination with internal / external departments.

Gained expertise in Invensys- Foxboro I/A series DCS, Bently Nevada 3500 Turbine supervisory instrument system & Machine condition monitoring system, Emergency trip system of turbine with allen bradley plc, CCC Compressor anti surge control system and Digital Electro-Hydraulic Governing system of turbine.

Capable of drawing-up a detailed plan to achieve each stage of the project & overhauling, selecting & leading a team, executing the plan within the safety rules & quality standards Skilled in ensuring the safety & quality procedures are followed as per the permit to work, inspection & test records, certifications and correct practices for executing the job

Efficient organizer, motivator, team player and a decisive leader with the skills to motivate teams to excel & win

Overview

14
14
years of professional experience

Work History

Assistant General Manager

Reliance Industries Limited
07.2022 - Current
  • Administrating Refinery, Petro chemical & CPP Rotary Equipment’s BN3500/System1 machines protection/condition monitoring system, CCC Antisurge/Performance control System & Turbine Governing control system
  • Works as a SME for systems like Bently Nevada 3500, Data manager 2000, System 1 classic & Evo condition monitoring system, CCC Series 3++/Series 5 Vanguard/Prodigy control system
  • Woodward 505, Protech 203 & BRAUN turbine governing and overspeed protections system
  • Actively Involved in new installations, upgradation & modification projects of BN3500/CCC
  • Preparation of specific requirements, Collection of required specifications data, Review of Budgetary offer from Vendor, Finalization of vendor offer, BOM, Procurements, Review of engineering documents, Conducting FAT/SAT, installations & commissioning activities
  • Managing BN3500/CCC/turbine governing control systems MRP
  • Formulating Reservation based PR, Releasing PR as per standard procedure, technical evaluation of vendor offers, material quality inspection
  • Material reservation, consumption posting, Inventory management
  • Executed turnarounds of FCCU unit of refinery & Steam turbines of CPP
  • Responsible for verification of MCMS proximity systems installations in Turbine/compressor/gearbox, float settings, Linearity checking of proximity system, healthiness checking of BN3500 rack/System1, support in start-up of rotary equipment’s
  • Manage to solve Problems in running machine in minimum time with root cause to avoid generation loss
  • Drive efficiency and effectiveness of the incident management process
  • Enforce process and standards
  • Demonstrated ability to lead RCA Root Cause Failure Analysis reviews & FMEA failure mode effect analysis
  • Develop and maintain standard operating procedures (SOP’s)
  • Support a robust reliability and failure analysis effort including providing training/coaching to the plant instruments team

Technical lead

Emerson Process Management Power & Water Solutions India Pvt. Ltd.
04.2022 - 07.2022
  • Executed Turbine control DCS engineering of Simens Turbine, Logic & graphics Development in Emerson ovation DCS
  • Completed project and delivered within time bound

Associate Manager Control & Instrumentation

Adani Power Mundra limited
06.2011 - 04.2022
  • Administering Turbine & Boiler of 660MW with specialization in DCS, DEH, ETS, MFT, BENTLY NEVADA 3500 and Turbine Instruments and other optimization measures for high efficiency
  • Monitoring and guiding in C&I maintenance to improve availability of Turbine, Boiler and DCS equipment by routine maintenance & overhauling
  • Conducting review of TMCS, FSSS, DEH, TSI, MFT and ETS as built logic for the smooth operation & study of Digital Electro-Hydraulic Governing of Turbine
  • Executing review and checking of interlock and protection of Turbine during overhauling
  • Installing instruments, configuring DCS as well as in PLC, logic and graphics implementation in DCS for various modifications, indignation, reliability and efficiency
  • Preparing Documents & drawings like MOC, Instrument index, Loop diagram, Hook up drawing, I/O list for new Installations, Modification and indignations projects
  • Selecting control schemes, identifying the appropriate control system, enquiry specification preparation and selections of instruments based on type of application for plant modification and indignation
  • Introducing professional project management practices and streamlining the critical planning processes throughout the project life cycle
  • Performing advance planning for resources, manpower deployment and rendering technical support
  • Interfacing for decision-making process, conducting profitability analysis and finalization of agreements for Material & Contract Management
  • Addressing project issues from technical, maintaining schedule and meeting project deliverables
  • Formulating purchase requisition of the plant material and services
  • Engaged in material reservation, quality inspection & consumption posting
  • Filing requisition for the material & special requirements, solving technical queries
  • Supervising the erection & commissioning of process control equipment and instrumentation systems
  • Resolving troubleshooting problems arising in the total execution of job and chalking out the check list for Pre-Commissioning & Commissioning Activities
  • Engaged as a core team in IMS audit as an auditee
  • Preparing & maintaining HIRA, Risk register, Skill matrix and OTP form/tracker for IMS
  • Preparing SOP, documents, manuals, drawing & record of system to access performance & easy maintenance

Education

Bachelor of Technology - Instrumentation and Control

Nirma University
01.2011

H.S.C. -

GHSEB Board
01.2007

S.S.C. -

GHSEB Board
01.2005

Skills

  • Instrumentation & control
  • Engineering
  • Project Management
  • Reliability
  • Installation & Commissioning
  • Inventory Management
  • Team Building & Leadership
  • Engineering Design & Drawings
  • Material Management

HIGHLIGHTS

· Executed installation of new Wet Gas Compressor project of FCCU unit in Refinery, Involved in Installation and Commissioning activities of BN3500/System1Evo and CCC prodigy Antisurge/Performance control System.

· Executed Upgradation project of FCC Power recovery Train CCC system from Series 4 to Prodigy.

· Executed many logic and graphics modifications in the DCS,PLC,CCC,BN3500&System1 for improving plant efficiency & reliability.

· Managed to solve problem in minimal time with root cause to avoid production loss.

· Executed many cost saving initiatives by indignation or developing alternate vendor for existing material

· Completed many capitals overhauling (Turnaround) of turbine/Compressors units within time frame by proper resource planning of material and man power.

· Executed Automatic Turbine Control Project

Completed the project of Invensys DCS upgradation from ICC to EVO within time frame

PERSONAL INFORMATION

Date of Birth: 28/03/1990

Present Address: Sector-21,Block-35/D, Reliance greens township,Motikhavdi,Jamnagar,Gujarat.361142.

Timeline

Assistant General Manager

Reliance Industries Limited
07.2022 - Current

Technical lead

Emerson Process Management Power & Water Solutions India Pvt. Ltd.
04.2022 - 07.2022

Associate Manager Control & Instrumentation

Adani Power Mundra limited
06.2011 - 04.2022

Bachelor of Technology - Instrumentation and Control

Nirma University

H.S.C. -

GHSEB Board

S.S.C. -

GHSEB Board
Amit Jilka