Key Projects Handled:
Project: RAPP-EFB Project—Indonesia (From September 2022 till date)
- Developed Basic equipment layout and piping for Complete new Pulp Mill of Continuous Tube Digester and Washing Plant (First of its kind in World for the use of Raw material)
- Coordinating, Monitoring and Supervision of progress of piping and plant design project work to meet the tight document delivery schedule without compromising the quality of deliverables
- Interface between Customer and Overseas Technology office .
- Periodically conducted 3D model review using Navisworks to monitor the progress as well as the quality.
- Supported the Start up and Commissioning team for pre-commissioning activities.
Project: ITC PEP 4—India (From September 2020 to September 2022)
TNPL Unit 2 -India ( From September 2019 to December 2020)
- In ITC project-Developed Basic equipment layout and piping for new Single Bleach Fiberline as well as upgrade of Fiberline 1 and 2.New Digester # 7 was also included in scope of supply
- In TNPL project-Developed Basic equipment layout and piping for new Continues Cooking as well as Fiberline
- Coordinating, Monitoring and Supervision of progress of piping and plant design project work to meet the tight document delivery schedule without compromising the quality of deliverables.
- Interface between Customer and Overseas Technology office.
- Periodically conducted 3D model review using Navisworks to monitor the progress as well as the quality.
- Coordination with the customer during the equipment and Piping erection and effectively solving the queries through communication as well as site visits.
- Prepared lessons learnt of the project for Plant design during the project closure so as to include the same in database.
- Supported the Startup and Commissioning team for pre-commissioning and commissioning activities.
Project: Toba ODL—Indonesia (From December 2017 to August 2019)
RAPP-Kerinci—Indonesia (From December 2017 to August 2019)
Phoenix—Thailand (From May 2017 to December 2017)
Siam Cellulose BanPong-Thailand (From October 2015 to December 2016)
Siam Cellulose Wangsala-Thailand (From May 2014 to July 2015)
- Developed Basic equipment layout and piping for various Technologies of Pulp Mill like Continuoues Cooking , Fiberline Upgrade, Addition of new Batch Digester to the existing Digesters
- Coordinating, Monitoring and Supervision of progress of piping and plant design project work to meet the tight document delivery schedule without compromising the quality of deliverables.
- Interface between Customer and Overseas Technology office.
- Periodically conducted 3D model review using Navisworks to monitor the progress as well as the quality.
- Coordination with the customer during the equipment and Piping erection and effectively solving the queries through communication as well as site visits.
- Prepared lessons learnt of the project for Plant design during the project closure so as to include the same in database.
- Supported the Startup and Commissioning team for pre-commissioning and commissioning activities.
- Periodically conduct 3D model review using Navisworks to check the work done by the engineering company
- Supported the Start up and Commissioning team for pre-commissioning and commissioning activities.
Overseas Project Handled: Suzano Maranaho Papel e Cellulose SA,Brazil.-Curitiba Brazil – In year 2011
Job Profile:
- Developed Basic Layout and Piping using PDMS version 12 for the designated area.
- Generation of piping Isometrics and GA using Draft / Isodraft with PDMS Version 12
- Developing detail Piping engineering for the designated area which includes indoor &outdoor plants, rack piping, column piping, pump piping, exchanger piping.
- Checking the civil structure drawing and Inter-departmental coordination