AutoCAD, Far vision, Costx(training), MS Office
OBJECTIVE
A dynamic professional with around 7+ years of rich experience in construction industry with complete project experience in real estate(Residential project) infra projects in following field.
1. Quantity Surveying (Pre & Post Contract)
2. RA Bill Certification.
3. Material Reconciliation.
4. BBS Preparation.
5. Budget Preparation.
6. Rate Analysis.
Currently working with JLL (Jones Lang Lassalle) at M3M India private limited Tee point Sec-65 Gurugram Haryana.
Hands-on experience in Site engineer, BOQ preparation, Quantity Surveying work, BBS, Bill preparation and Certification of the contractor.
English & Hindi
Project:- TPL-GIL (JV) Sahnewal-Pilkhani Lot-301 Project.
Employer:- EDFCC
Project Details:- 180 km Freight Corridor(Single Line ) Constructed by Tata project limited.
Project value:- 2450 Crore
Duration: - Feb-202to Mar-2023
Designation:- Quantity Surveyor(Pre Contract)
Roles & Responsibilities
1. Quantity take-off of various Building like station Building, Sand Model Room, CSD Quarters, Guest house, Staff Quarters, Road work etc. and BOQ Preparation.
2. Rate Analysis Through DAR, DSR and Plinth area rates.
3. Budget preparation.
4. Bill Certification.
5. Material Reconciliation.
6. BBS Preparation etc.
Project:-M3M C& D Office Sec-65 Tee Point Gurugram Haryana.
Duration:- April-2023 to Till Date.
Designation:- Billing Engineer(Post Contract)
Roles & Responsibilities
1. Bill Certification.
2. Material Reconciliation.
3. BBS Preparation etc.
Project:- Tata La-Vida Project, Sec-113, Bajghera, Gurugram Haryana.
Project Details:- 12 Acres Residential Projects with 8 Nos High rise Tower (B1 to B6-Ground+13th floor and A1 & A2-Ground+25 floor) with 2 basement. Structural part Constructed By JMC. Tower B1, B2 & B5 Finishing done Pashupati Construction and Engineering.
Project value:-7.8 Cr.
Roles and Responsibilities
1. Finishing Engineer on Residential Building.
2. Preparation of Shop Drawing of various Finishing Item.
3. Preparing BOQ for Finishing Item.
4. Preparation of Material Reconciliation Report.
5. Rate Analysis of Finishing Item
6. Certification client & sub-contractor bills.
Project:- DLF-The Camellias, Sec-42 Gurugram Haryana.
Project Details:- 17.5 Acres Residential Projects with 9 Nos High rise Tower Constructed by Leighton India Contractor Private Limited.
Project Value:- 1450 Cr.
Role & Responsibilities
1. Prepare Daily labour Report.
2. Supervision and Execution of work as per drawing and specification.
3. Preparation of work schedule as per requirement
4. Prepare Daily progress report.
5. Water proofing Packaging In-charge.
6. Reconciliation of Material
BOQ Preparation, IS -1200, SMM7, Quantity Surveying(Pre & Post), Bill certification, Budget Preparation, Rate Analysis, BBS Preparation, Material Reconciliation, Cost Report, Cost Control
AutoCAD, Far vision, Costx(training), MS Office