Summary
Overview
Work History
Education
Skills
Timeline
Generic
Amit Panday

Amit Panday

Jaipur

Summary

Seeking a challenging position in an organization and enthusiastic about telecom specially computers and Communication network. Total 5 years + of experience in Telecom commination sector with Customer Service and Data Analysis. 10+ month of experience in field of Management. Expertise in alarm monitoring on M-2000 & OMCR team leader. Expertise in Circle MIS(O&M). Expertise in IP Signoff (Outage, Billing) & FMC Coordinator (O&M), MIS. Reliance JIO Infocomm Limited (RJIO) as infra (O&M) IP COLO lead (IP COLO Billing & Outage Signoff). Bharti infratel Ltd. (BIL) as infra (O&M) Asst. OSM lead (OPCO reward Billing & Outage Signoff). Now currently working in Bharti Airtel Ltd. (BHL) as Surveillance Manger. .

Overview

10
10
years of professional experience

Work History

Surveillance Manger

Bharti Airtel Ltd
11.2019 - Current
  • Infra Alarms tracking, rectification, restore sites Infra issue for All 4 OPCO Sharing sites
  • All 4 OPCO sharing sites on outage, reward & penalty signoff
  • ALL 6 Partners sharing sites on Outage, reward & penalty signoff
  • Ensure Smooth Functioning of all Electrical Equipment’s at Large & medium facility & all sites
  • Monthly Sharing Sites outage validation and signoff with all OPCO and vendors
  • Drive & Head OMCR for alarm escalation and monitoring
  • Daily Make the NWA, Outage reports, KPIs report for NHQ.SHQ, cause code report of IP sharing sites
  • Weekly & monthly review report & PPT making of IP COLO sites
  • Review with vendors regarding Energy and Pro-active corrective & preventive Maintenance action of Infra and Other Network and Ensuring quality of the same
  • Minimization of repeat Fault
  • Share the Infra rectification plan with all OPCO for outage & cost control
  • Punch point tracking and rectification for all OPCO Sharing sites
  • Mailing to vendors regarding probable HW/SW failure due to infra conditions
  • Daily make the NWA outage reports, KPIs report, monthly & weekly PPTs.

Operation Team Leader

Bharti Infratel Ltd
Jaipur
01.2019 - 10.2019
  • ( IP COLO Signoff)
  • Infra Alarms tracking, rectification, restore sites Infra issue for All 5 OPCO Sharing sites
  • All 5 OPCO sharing sites on outage, reward & penalty signoff
  • Ensure Smooth Functioning of all Electrical Equipment’s at Large & medium facility & all sites
  • Monthly Sharing Sites outage validation and signoff with all OPCO and vendors
  • Daily Make the NWA, Outage reports, KPIs report for NHQ.SHQ, cause code report of IP sharing sites
  • Weekly & monthly review report & PPT making of IP COLO sites
  • Review with vendors regarding Energy and Pro-active corrective & preventive Maintenance action of Infra and Other Network and Ensuring quality of the same
  • Minimization of repeat Fault
  • Share the Infra rectification plan with all OPCO for outage & cost control
  • Punch point tracking and rectification for all OPCO Sharing sites
  • Mailing to vendors regarding probable HW/SW failure due to infra conditions
  • Daily make the NWA outage reports, KPIs report, monthly & weekly PPTs.

Reliance Jio Infocomm Limited, RJIO, O
10.2017 - 01.2019
  • Profile : IP COLO lead(IP COLO Signoff)
  • Infra Alarms tracking , rectification ,restore sites Infra issue for All 9 IP Sharing sites
  • Ensure Smooth Functioning of all Electrical Equipment’s at Large & medium facility & all Airtel sites
  • Monthly Sharing Sites outage validation and signoff with all OPCO and vendors
  • Daily Make the NWA, Outage reports, KPIs report for NHQ.SHQ, cause code report of IP sharing sites
  • Weekly & monthly review report & PPT making of OPCO sites
  • Review with vendors regarding Energy and Pro-active corrective & preventive Maintenance action of Infra and Other Network and Ensuring quality of the same
  • Minimization of repeat Fault
  • Share the Infra rectification plan with all IP for outage & cost control
  • Punch point tracking and rectification for all IP Sharing sites
  • Mailing to vendors regarding probable HW/SW failure due to infra conditions
  • IP fee Billing and reward penalty make
  • Circle MIS for Aerial, solutions Pvt
  • Ltd
  • Daily make the NWA outage reports, KPIs report, monthly & weekly PPTs.

FMC Coordinator

ATC Telecom Infrastructure private Limited, ATC India
10.2016 - 10.2017
  • Infra Alarms tracking , rectification ,restore sites Infra issue for All 9 OPCO Sharing sites
  • Ensure Smooth Functioning of all Electrical Equipment’s at Large & medium facility & all RJIO sites
  • Monthly Sharing Sites outage validation and signoff with all OPCO and vendors
  • Daily Make the NWA, Outage reports, KPIs report for NHQ.SHQ, cause code report of IP sharing sites
  • Weekly & monthly review report & PPT making of IP COLO sites
  • Review with vendors regarding Energy and Pro-active corrective & preventive Maintenance action of Infra and Other Network and Ensuring quality of the same
  • Minimization of repeat Fault
  • Share the Infra rectification plan with all OPCO for outage & cost control
  • Punch point tracking and rectification for all OPCO Sharing sites
  • Mailing to vendors regarding probable HW/SW failure due to infra conditions
  • IP fee Billing and reward penalty make.

Ericsson India Ltd
08.2015 - 10.2016
  • Job profile : Circle MIS
  • Monitor and checked BSC, BTS, NODEB & RNC Status in Rajasthan through M-2000, M-5000 Server
  • Health checkup of the RNC/BSC
  • Back up of the RNC/BSC
  • Exposure to Huawei BTS (3012, DBS 3900) in fault rectification and troubleshooting which is used for 2G
  • Technical support and remote troubleshooting for Node B, BTS – Huawei
  • Regular check & analysis of various site status, their follow up & necessary
  • Escalation for maximum network availability
  • Prepare various kind of report according to the Status of NODEB, BTS & BSC, and follow up their necessary escalation
  • Daily Make the NWA, Outage reports, KPI, Zero call & cause code Report of GSM, CDMA & 3G Sites
  • Continually contact with the field Engineer Regarding status of NODEB, BTS & fiber cut
  • Find out the Causes of NODEB Unavailable to Login in to Cx-2000 Routers
  • Handle the NODEB in Different way as per their Configuration like 2-Port Ethernet, IP-Radio or Cx-2000
  • Maintenance and Real time proactive monitoring with 99.99% uptime
  • Found the Loop of GSM & CDMA Sites using various Commands
  • Regular check & analysis of various site status, their follow up & necessary Escalation for maximum network availability
  • Familiar with Huawei BTS HU-3012 & HU-3900.

Project Leader

Thomas cook India Pvt. Ltd
10.2014 - 08.2015
  • Month working field of Management in ISACON conference thorough experience in Thomas cook India Pvt
  • Ltd.

Education

B.Tech - Electronics and communication engineering

Sri Balaji College of Engineering and Technology
Jaipur, Rajasthan

Skills

PROFESSIONAL QUALIFICATION & COMPUTER SKILLSundefined

Timeline

Surveillance Manger

Bharti Airtel Ltd
11.2019 - Current

Operation Team Leader

Bharti Infratel Ltd
01.2019 - 10.2019

Reliance Jio Infocomm Limited, RJIO, O
10.2017 - 01.2019

FMC Coordinator

ATC Telecom Infrastructure private Limited, ATC India
10.2016 - 10.2017

Ericsson India Ltd
08.2015 - 10.2016

Project Leader

Thomas cook India Pvt. Ltd
10.2014 - 08.2015

B.Tech - Electronics and communication engineering

Sri Balaji College of Engineering and Technology
Amit Panday