Overview
Work History
Education
Certification
Family Details
Training
Personal Information
Accomplishments
Additional Information
Software
Interests
Summary
Skills
Work Availability
Work Preference
Timeline
AMIT PAUL

AMIT PAUL

CIVIL ENGINEER
Guwahati,AS

Overview

33
33
years of professional experience
2
2
years of post-secondary education
1
1
Certification
1
1
Language

Work History

General Manager (Tech)

NEEPCO
05.2022 - Current
  • Company Overview: (A govt of India Enterprise)
  • Transfer of 3(three) Projects (Heo-186MW, Tato-I -240MW and Tato-II- 700 MW from Private developers to NEEPCO after successful due diligence and obtaining NOC and settlement of audited payment against works already done by the developers.
  • Signing of MOA with Govt, of Arunachal Pradesh for 5(five) Projects (Heo-186MW, Tato-I -240MW, Tato-II- 700 MW , Naying 1000 MW and Hirong 350MW )
  • Obtaining MOEFCC EC transfer for 3(three) Projects (Heo-186MW, Tato-I -240MW and Tato-II- 700 MW from Private developers to NEEPCO successfully
  • (A govt of India Enterprise)

Sr. Manager (Civil)

NEEPCO Ltd
01.2013 - 12.2020
  • Execution Supervision and Monitoring of Construction of Bichom Dam (Completed in 2020) working since 2013.
  • Presently O&M of Bichom Dam and reservoir.
  • Co-ordination with Design wing over any issue of Drawing/ site condition/foundation/methodology etc
  • Environment and Forest Issues
  • HM works and O&M of Bichom Dam
  • Electrical Works of Unit
  • Performing as Engineer-in-charge while EIC on other location at KaHEP from time to time.
  • Presently EIC for finalization of pending issues with M/s Patel Engineering Limited (Package contractor)
  • HM data collection compilation etc.
  • Any other works assigned from time to time by the controlling officer including infrastructure works and local issues at Arunachal Pradesh.

Sr. Manager (Civil)- Roads

NEEPCO Ltd
01.2011 - 06.2012
  • To look after 45 Km Hilly road.
  • Successfully shifted critical Over Dimension Components of Power House and High Pressure Tunnels.

Sr. Manager (Civil)- SG

NEEPCO Ltd
01.2011 - 06.2011
  • Posted in Chief Engineer Office as support group for technical matters for all the civil packages of the 600 MW Kameng H.E.Project.

Sr. Manager (Civil)- Planning

NEEPCO Ltd
01.2008 - 01.2011
  • Planning of H.E.Projects including preparation of DPR etc.

Dy. Manager (Civil)

NEEPCO Ltd
07.2004 - 06.2007
  • Providing supports to users of AutoCAD and STAAD Pro.
  • Structural design of RCC Building by STAAD Pro.
  • Layout and planning of Buildings using Autocad.
  • Monitoring of Backup systems.
  • Monitoring of internet services.

Astt. Manager ( Civil)

NEEPCO Ltd
07.2001 - 07.2004
  • (1) Supervision and execution of Construction of D/Tunnel, Saddle Dam (Earthen).
  • (2) Preparation of Progress report.
  • (3) Geotechnical exploration.
  • (4) Different types of piling.
  • (5) Structural design of building.

Engineer ( Civil)

NEEPCO Ltd
02.1998 - 07.2001
  • (1) Topographical Survey by using total station equipment for the entire project area.
  • (2) Setting out works for different major Structures like Tunnel, Dam, Powerhouse, etc.
  • (3) Collection, compilation and preparation of report of Hydro-meteorological data.

SDO (c )/ Engineer ( Civil)

NEEPCO Ltd
01.1997 - 02.1998
  • (1) Assessment of Catchments area, Reservoir area.
  • (2) Alignment survey of Hilly Road, Estimation.
  • (3) Collection, compilation and preparation of report of Hydro-meteorological data.

Lecturer in civil Engg.

Silchar Politechnic, Silchar, Assam
03.1992 - 12.1996
  • Company Overview: (Under Govt of Assam)
  • To deliver lecture in Soil Mech, RCC Design, Surveying.
  • In-charge: Material Testing Laboratory.
  • (Under Govt of Assam)

Education

B E - Civil Engg

REC/NIT Bhopal
01.1990 - 12.1990

M.Tech. - Geotech

Assam Engg College
01.1995 - 12.1995

Certification

I hereby certify that the information provided above is true to the best of my knowledge and in case any information as above is found to be false or incorrect or suppressed at any stage, I understand that I am liable to be terminated from the services forthwith without prejudice to any other legal and disciplinary action as deemed fit by the Management.

Family Details

  • Late Niranjan Paul, Father, 75, Retired from SBI in 2000, Barpeta Road, Assam
  • Smt Geeta Paul, Mother, 54, House wife, Hojai, Assam
  • Smt Jaya Ghatak (Paul), Wife, 23, Working as Asso. Professor (UGC Scale) in RNT, Pune
  • Sri Archishman Paul, Son, 23, Studying CSE at Pune, Pune

Training

  • 20 days, 06/2004, M/s Electrowatt Engineering ZURICH SWITZERLAND, On the job Transfer of Technology (TOT) Programme in Switzerland.
  • 7 Days, 06/2002, M/s KLG Systems, New Delhi, Application of Autocad for drafting and design in 2D and 3D.
  • 30 days, 11/1995, Technical Teachers Training Institute, Salt Lake Kolkata, Induction Programme in Teaching.

Personal Information

  • Expected Salary: Reasonable
  • Date of Birth: 12/02/66

Accomplishments

1. Project acquisition for 5 projects about 2100 MW Hydro Power in the State of Arunachal Pradesh, India

2. On site direct leadership in completion of construction of 75m height Concrete Gravity Dam of length 265m for 600MW Kameng H. E Project in record time saving manner and subsequent operation of the Dam for 2 years including reservoir management handling 25years return period floof during the period.

3. Preparation of DPR for several H E projects from planning wing of NEEPCO.

4. Proficiency in software like Autocad and STAAD PRO.

5. Direct on-site pre-construction survey and investigation works against 60MW H.E. Project in Mizoram.

6. A successful teaching officer experience during beginning of career under Govt. AICTE institute in Assam for 4 years.

Additional Information

A dynamic, leadership bearing multi language knowing ( English/Bengali/Hindi/Assamise/ Mizo to some extent) professional Civil Engineer dedicated for honest services.

Software

Autocad

STAAD Pro

Interests

Singing

Summary

Experienced with strategic planning, team leadership, and operational excellence. Utilizes forward-thinking approach to drive business growth and streamline processes. Track record of fostering collaborative environments and achieving measurable results.

Skills

Operations management

undefined

Work Availability

monday
tuesday
wednesday
thursday
friday
saturday
sunday
morning
afternoon
evening
swipe to browse

Work Preference

Work Type

Full Time

Work Location

Hybrid

Important To Me

Work-life balance

Timeline

General Manager (Tech) - NEEPCO
05.2022 - Current
Sr. Manager (Civil) - NEEPCO Ltd
01.2013 - 12.2020
Sr. Manager (Civil)- Roads - NEEPCO Ltd
01.2011 - 06.2012
Sr. Manager (Civil)- SG - NEEPCO Ltd
01.2011 - 06.2011
Sr. Manager (Civil)- Planning - NEEPCO Ltd
01.2008 - 01.2011
Dy. Manager (Civil) - NEEPCO Ltd
07.2004 - 06.2007
Astt. Manager ( Civil) - NEEPCO Ltd
07.2001 - 07.2004
Engineer ( Civil) - NEEPCO Ltd
02.1998 - 07.2001
SDO (c )/ Engineer ( Civil) - NEEPCO Ltd
01.1997 - 02.1998
Assam Engg College - M.Tech., Geotech
01.1995 - 12.1995
Lecturer in civil Engg. - Silchar Politechnic, Silchar, Assam
03.1992 - 12.1996
REC/NIT Bhopal - B E, Civil Engg
01.1990 - 12.1990
AMIT PAULCIVIL ENGINEER