Summary
Overview
Work History
Education
Skills
Timeline
Generic
Amit Singh

Amit Singh

Rewa,M. P

Summary

Detail-oriented Structural Engineer with over 5 years of experience in designing railway bridges and road over bridges. Expertise in applying IRS and IRC standards for structural analysis and load evaluation. Experienced in developing detailed RSI models in MIDAS Civil, focusing on track resistance, temperature loads, and realistic rail–structure interaction.

Overview

10
10
years of professional experience

Work History

Design Engineer

Beaver Infra Consultants Pvt Ltd
Panna
01.2026 - Current
  • Design of Sub-Structures for Panna Khajuraho New BG Line Project under Indian Railway (WCR) - In Progress.
  • Designed sub-structures for proposed ROB No.-01 at Ch:-12/660km (1x30.0m span) welded steel composite girder between Station Rewa-Govindgarh under Rewa - Sidhi New BG Line Project, ensuring compliance with IRC-6-2017 standards.
  • Designed sub-structures for Proposed ROB No.-02 At Ch:-20/200km (1x18.00m+1x24.00m+18.00m Span) Welded Steel Composite Girder In Between Station Rewa- Govindgarh under Rewa - Sidhi New BG Line Project (Indian Railway WCR) (Loading Standard: IRC-6-2017)
  • Designed sub-structures for Proposed Approach Road Bridge at Nallah Crossing Between Station Sidhi Gajrahi under Rewa - Sidhi New BG Line Project (Indian Railway WCR) (Loading Standard: IRC-6-2017)
  • Performed rail structure interaction (RSI) analysis for major bridge no. 1200/1 (Magardha River) span 3x18.30m CG on Satna-Rewa doubling project, contributing to structural integrity assessments.
  • Performed rail structure interaction analysis to ensure structural integrity of railway bridges. Major bridges no. 1207/1 (Baghai Nallah) span 1x18.30m CG on Satna-Rewa doubling project (Indian Railway WCR).
  • Performed Rail Structure Interaction (RSI Analysis) Major bridges no. 22612 span 1x18.30m CG between Govingragh Baghwar Station under Rewa - Sidhi New BG Line Project (Indian Railway WCR).
  • Performed Rail Structure Interaction (RSI Analysis) Major bridges no. 45590 span 3x18.30m CG between Rampur Nikin-Churhat Station under Rewa - Sidhi New BG Line Project (Indian Railway WCR).

Structural Engineer

K.P. Techno
Bhopal
01.2023 - 01.2026
  • Designed Substructure for Bridge No. 252 - 37x30.50 M Composite Girder Span Important Bridge Cum Viaduct Over (Newaj River) At Ch. 145721.065. (Indian Railway, WCR)
  • Designed Substructure for Bridge 258a via-duct railway track at Bina Refinery crossing, facilitating safe rail transport in Rajgarh-Biaora section of Ramganj_Mandi-Bhopal new BG line project (Indian Railway, WCR)
  • Designed Substructure for Construction of RoB Across Hawra-Mumbai Railway Line In Km-704/1-3 (L.C.) No. 360) At Near Jairam Nagar Railway Station On Masturi - Seepat Road (Indian Railway, SECR)
  • Designed Substructure for Proposed 2 Lane Rob In Lieu Of Level X-Ing No.540 At Km. 1422/16- 18 On Mtj-Pwl Section Bet. Ajhai-Chata Station. (Indian Railway, NCR)
  • Designed Substructure for Proposed 2 Lane Rob In Lieu Of Level X-Ing No.551 At Km. 1447/0-1 On Mtj-Pwl Section Bet. Hodal-Kosi Kalan Station. (Indian Railway, NCR)
  • Designed Substructure for Proposed 2 Lane Rob In Lieu Of Level X-Ing No.540 At Km. 1422/16- 18 On Mtj-Pwl Section Bet. Ajhai-Chata Station. (Indian Railway, NCR)
  • Designed Substructure for Construction Of Proposed Rob At L.C. No. 104/C/2/T Railway Ch.No.1169/16-17 On Chimur-Sindewahi-Gangalwadi Road Sh 322 In Km.145/100 On Length Passing Through Sindewahi Town In Taluka Sindewahi, District - Chandrapur. (Indian Railway, SECR)
  • Designed Substructure for Construction Of Proposed Road Over Bridge (Rob) & Limited Height Subway (Lhs) On Gondia-Katangi-Balaghat Road Near Gondia Bus-Stand At Gondia City.
  • Performed Detailed RSI analysis for Bridge 212 - 3x30.50 m composite girder span on RMA – BPL new rail line project.
  • Performed Detailed RSI Analysis For Bridge 238 - 1x30.50 M Composite Girder Span On RMA – BPL New Rail Line Project (Indian Railway, WCR)
  • Performed Detailed RSI Analysis For Bridge 246 - 1x18.30 M Composite Girder Span on RMA – BPL New Rail Line Project (Indian Railway, WCR)
  • Performed Detailed RSI Analysis For Bridge 228 - 6x30.50 M Composite Girder Span on RMA – BPL New Rail Line Project (Indian Railway, WCR)
  • Executed proof checking of substructure for Bridge no. 105/1 - 1x30.5 m composite girder bridge, ensuring compliance with engineering standards on Panna Khajuraho new BG line project
  • Executed proof checking of substructure for Bridge no. 106/3 - RCC Box 1x6x5.65m (Panna Khajuraho New BG Line Project).
  • Executed proof checking of substructure for Bridge no. 108/2 - 2x18.3 m Composite Girder Bridge (Panna Khajuraho New BG Line Project).
  • Executed proof checking of substructure for Bridge no. 108/4 - 1x9.15m PSC Slab Bridge (Panna Khajuraho New BG Line Project).
  • Executed proof checking of substructure for Bridge no. 113/3 - 3x30.5 m Composite Girder Bridge (Panna Khajuraho New BG Line Project)
  • Executed proof checking of substructure for Bridge no. 113/1 - 1x12.2 m Composite Girder Bridge (Panna Khajuraho New BG Line Project)
  • Executed proof checking of substructure for Bridge no. 115/3 - 1x18.30 m Composite Girder Bridge (Panna Khajuraho New BG Line Project)
  • Executed proof checking of substructure for ROB no. 17 Between MNV-GVB Stn. in Bhopal - Bina Section.
  • Executed proof checking of substructure for ROB no. 47 Between RIKA-SHDR Stn. in Bhopal - Bina Section.

Structural Engineer

Paushkalya Civil Consultant
Umaria
06.2019 - 12.2022
  • Conducted structural analysis and design calculations for beams, columns, and slabs to ensure safety and compliance with regulations.
  • Coordinated with architects, engineers, and contractors during design and construction phases to ensure alignment and project success.
  • Drafted, modeled, and detailed structural components using AutoCAD to facilitate accurate project execution.

Teacher

Self
Indore
07.2016 - 03.2019
  • Delivered core engineering subjects to undergraduate students through lectures, demonstrations, and hands-on activities, fostering understanding and interest.
  • Instructed students in key engineering concepts, promoting clarity and engagement through practical application.

Education

Master of Engineering - Structural Engineering

Shri G.S Institute Of Technology & Science
Indore, M.P
12-2016

Bachelor of Engineering - Civil Engineering

Govt. Engineering College
Rewa, M.P
06-2013

Higher Secondary School Certificate Examination - Science (Mathematics)

Govt. Excellence Higher Secondary School, Board Of Secondary Education
Bhopal, M.P
04-2009

High School Certificate Examination -

Govt. Excellence Higher Secondary School, Board Of Secondary Education
Bhopal, M.P
06-2007

Skills

  • Bridge Design
  • Foundation Design and Analysis
  • Shallow and Deep Foundations Design
  • Structural Analysis and Design
  • Seismic Design
  • Design of Earth Retaining Structures
  • IRC CODES
  • IRS CODES
  • MIDAS CIVIL(RSI Analysis)
  • STAADPro
  • Computer-Aided Design (CAD)
  • Microsoft Office Suite

Timeline

Design Engineer

Beaver Infra Consultants Pvt Ltd
01.2026 - Current

Structural Engineer

K.P. Techno
01.2023 - 01.2026

Structural Engineer

Paushkalya Civil Consultant
06.2019 - 12.2022

Teacher

Self
07.2016 - 03.2019

Master of Engineering - Structural Engineering

Shri G.S Institute Of Technology & Science

Bachelor of Engineering - Civil Engineering

Govt. Engineering College

Higher Secondary School Certificate Examination - Science (Mathematics)

Govt. Excellence Higher Secondary School, Board Of Secondary Education

High School Certificate Examination -

Govt. Excellence Higher Secondary School, Board Of Secondary Education
Amit Singh