Dedicated Project Engineer, Manager successful at work flow planning, Having 8 years experience in the field of Cleanroom, HVAC, Utilities Projects. Keen to apply new and emerging project organization techniques to increase overall performance.
1. Dry powder line Turnkey Project : ISO-8 : 6 AHUs
2. Primary and Secondary Packing ISO-8 Turnkey Project : 23 AHUs
3. Pharmaceutical Finish Goods Store : 1800 Sq.Mtr. ( 94 TR HVAC Work)
4. Utility Project : 2400 TR ( 3 Compression Type Chillers Each 800 TR)
Piping, 11 Pumps, 9 Cooling Towers etc.
5. 3 TPH Boiler Installation and Piping
6. Purified Water Project with installation of Generation and Distribution loop.
7. Fire Fighting Project
1. Pharmaceutical Raw Material Store Turnkey Project ( 2700 Sq. Mtr.)
Installation of HVAC Ducts
Installation of the Package Units ( Air Cooled) : 6 Nos (Total=135 TR)
Installation of the Air Cooled Chillers : 2 Nos,
Installation of the Air Handling Units 8000 CFM : 4 Nos
Installation of the Electrical Works : AHU, Chillers, Package Units, Main Control
Panels, LED Lights,
Installation of the Metal false ceiling
PU Flooring Work
Material Racking Installation etc.
2. Dispensing and Sampling Area ISO-8 Clean Room Turnkey Project
Installation of HVAC Ducts
Installation of the Air Handling Units : 8 Nos
Installation of the Cleanroom modular partition System
Installation of the Electrical Works : AHUs, Main Control Panels, LED Lights,
PU Flooring Work
Validation of the project as per ISO-8 standard ( Filter Integrity, Particle Count, Recovery Test, Air Flow Balancing, Pressure Balancing
Project Handover