Summary
Overview
Work History
Education
Skills
Timeline
Generic

Amit Singh Rana

Ahmedabad

Summary

Experienced electrical engineer with over 7+ years of proven leadership and entrepreneurial success in the Power Plant industry and government-affiliated projects. Specialized in procurement, project management, and ensuring strict compliance with project specifications, including HSE standards and company protocols. Enthusiastic about advancing proficiency in automation testing. Recognized as a hands-on Project Manager for flawless execution and problem-solving abilities. Skilled in developing project scopes, maintaining documentation, and consistently delivering critical projects on schedule and within budget.

Overview

8
8
years of professional experience

Work History

Project Manager

Power Control
Ahmedabad
12.2023 - Current
  • Conducted post-project evaluations to identify improvement opportunities.
  • Directed the design and execution of electrical systems for commercial and residential projects.
  • Reviewed project risks and devised proactive strategies to avoid potential roadblocks.
  • Ensured quality assurance through regular testing and reviews.
  • Oversaw the installation of HT VCB, RMU panels, and other electrical panels.
  • Led the assembly and installation of LT switchgear, transformers, lighting arresters, and RMU panels.
  • Installed and maintained Busbar Trunking System (BBT) for panels and transformers.
  • Collaborated with clients to understand needs and propose cost-effective solutions.
  • Managed team to ensure timely project delivery within budget.
  • Conducted site visits to monitor progress and resolve technical issues.
  • Prepared and reviewed technical drawings, specifications, and reports.

Founder and Project Manager

Global Tech Engineering
Sasun
07.2017 - 10.2023
  • Implemented best practices in corporate governance standards.
  • Built strong relationships with stakeholders to ensure support.
  • Negotiated high-level contracts with suppliers and partners.
  • Managed overall operations, budgeting, and resource allocation.
  • Conveyer line project - Implemented the installation of 35km of optical fiber cable from plant silo to mines silo, involving OFC splicing. Spearheaded process automation, resulting in reduced installation timelines and improved project budgets. Oversaw a team of 25 individuals.
  • Bunker transmitter projects - Led the maintenance and repair of ultrasonic label transmitters and implemented SKADA automation. Implemented a dust extraction system plant-wide to enhance working conditions and employee safety.
  • Madhya Pradesh electric board - Managed Saubhgya Yojna across 60 villages, impacting 4000 homes, commended by the Division Engineer. Achieved notable reductions in project timelines and costs. Supervised the installation of electrical meters and maintained low-voltage lines under MPRVNL contracts. Managed a team of 70 individuals.
  • Turning Point project - Contributed to various projects involving commissioning and installation of coal handling plants. Received recognition and appreciation from DGM (C&I) and DGM (Electrical) at Reliance Industries for effectively insulating pull cord switches, belt sway switches, and zero-speed switches. Successfully completed process automation ahead of schedule using SKADA (Supervisory Control and Data Acquisition). Managed and supervised a team of 30 individuals.
  • Reliance Power (660*6 MW) AMC under Alok Power Control and Automation in Coal handling plant (C&I), Sasun - In this project, I led a team of 10 members, imparting knowledge of system features and products. Organized learning sessions for new technicians on instrument usage and framework. Supervised site installations of dust emission and suppression systems, as well as yard crossing sensors. Devised plans for primitive maintenance of conveyor lines and effectively debugged and fixed faulty instruments, resulting in significant cost savings. Additionally, contributed to the installation of Belt Weigher systems.

Site Engineer

Alok Power Control and Automation
Sasun
05.2016 - 07.2017

Engaged in software product testing for Rockwell Automation, focusing on the following key areas:

  • Programmable Logic Controllers (PLCs): Utilized to regulate machinery and processes within industrial settings.
  • Human-Machine Interface (HMI) Systems: Implemented graphical interfaces enabling operators to monitor and control machines and processes.
  • Sensors and Safety Systems: Integrated sensors and safety equipment to uphold worker and machine safety standards.
  • Industrial Networking: Provided networking solutions to interconnect and manage devices and systems within industrial environments.

Education

B. Tech - Electrical, Electronics Engineering Technologies

Babu Banarasi Das , UPTU
Lucknow
05-2015

Skills

    Professional Skills:

  • Proficient in interpreting electrical drawings and planning projects effectively
  • Skilled in utilizing various electrical instruments and conducting load consumption analysis
  • Advanced proficiency in MS Excel for data analysis and reporting
  • Experienced in handling electrical loads and conducting Root Cause Analysis
  • Competent in Compliance Monitoring to ensure adherence to regulatory standards
  • Proven track record in Schedule Management to meet project deadlines
  • Efficient in work flow planning to optimize productivity and resource utilization

Timeline

Project Manager

Power Control
12.2023 - Current

Founder and Project Manager

Global Tech Engineering
07.2017 - 10.2023

Site Engineer

Alok Power Control and Automation
05.2016 - 07.2017

B. Tech - Electrical, Electronics Engineering Technologies

Babu Banarasi Das , UPTU
Amit Singh Rana