Dynamic Safety Officer with extensive experience at Navayuga Engineering Company Limited, specializing in incident investigation and risk assessment. Proven track record in enhancing workplace safety through effective training and compliance initiatives, significantly reducing accidents. Strong communicator and collaborator, dedicated to fostering a culture of safety and regulatory adherence in high-stakes environments.
Khalwa Micro Lift Irrigation
The Khalwa Micro Lift Irrigation Project in Madhya Pradesh, India, is a large-scale irrigation scheme designed to lift water from a submerged reservoir and deliver it to 35,000 hectares of land using a piped micro-irrigation system. The project aims to provide pressurized water to small irrigation chaks (fields) through a network of pipes, with a residual head of 23 meters at each 2.5-hectare chak. The estimated cost of the project is 719.63 crore Indian rupees.
Parsa Kente Coal Mine : Operator: Adani Mining
Capacity: 15 million tons of coal per annum.
The Parsa Kente mine is part of Adani's wider strategy to increase its presence in the coal mining and power generation sectors. This mine is crucial for supplying coal to designated thermal power plants owned by RVUNL (Reliance Power Utilities Limited).
The 5230 MW integrated renewable energy storage project is a large-scale energy storage project in Andhra Pradesh, India, developed by Greenko. It will be India's largest and is designed to be the world's largest gigawatt-scale integrated project. The project includes solar, wind, and pumped storage components, enabling schedulable power on demand.
Components: Solar (3000 MW), wind (550 MW), and pumped storage (1680 MW).
The Rammam Hydro Electric Project (HEPP), Stage III, is a 120 MW run-of-the-river hydroelectric power project being constructed by NTPC Limited in the Darjeeling district of West Bengal.
Capacity: 120 MW (3 x 40 MW).