Overview
Work History
Education
Skills
Accomplishments
Disclaimer
Languages
Timeline
Generic
Amrendra Kumar Sharma

Amrendra Kumar Sharma

Ahmadabad

Overview

23
23
years of professional experience

Work History

Site Manager

Thermax Ltd.
Becharaji
04.2022 - Current
  • Here I handling Overall O&M related activity.
  • Operation Management-
  • Overall daily operations of all utility equipment’s ensuring their efficient and reliable performance.
  • Monitor equipment’s performance, identifying and addressing any operational issues or inefficient promptly.
  • Ensure operational procedures, guideline and protocol to optimize system performance.
  • Maintenance-
  • Execute comprehensive maintenance program for boiler including preventive maintenance, scheduled inspection.
  • Coordinate with external vendor, contractors and supplier for maintenance, repair and spares replacement as required.
  • Conduct regular inspection of equipment to identify potential issues and address them proactively
  • Maintain record of maintenance activities, logbook, and work order and equipment service history
  • Ensure compliances with safety standards and regulation, conducting regular safety audits and implementing corrective measures.
  • Staff management and Training-
  • Supervise a team of technician responsible for the operation and maintenance of boiler and allied equipment s.
  • Provide guidance, training and support to team, ensuring they have necessary skill and knowledge to perform their duties effectively.
  • Plan and coordinate work schedule, assigning tasks based on workload and priorities.
  • Statutory and Regulatory compliances-
  • Ensure compliances of safety permit and safety protocol.
  • Ensure safety practices and completion safety audit point within deadline.
  • Implement EHS guideline and conduct various activities as per corporate guideline.
  • Implementing TBT, BBS practices at site and ensure compliance as per customer guideline
  • Resource Management-
  • Identify cost saving opportunities without compromising safety and system integrity.
  • Maintain sufficient spare, consumable, fuel inventory for smooth operation of site.
  • Manage all expenses within budget.

Site Manager

Thermax Ltd.
Mundra
02.2021 - 04.2022
  • Here I handling O&M of overall Utility say Compressed Air Plant, HVAC & Smoke extraction and ventilation, Ultra-pure water plant, Chemical distribution & storage, Process Exhaust (scrubbers), Process cooling water cell and module, Air Showers, Fire hydrant system and raw water storage, VAM system, PHE & pumps (central PHE system), STP, ETP, Ware House, FMCS, PCW Boosting station, Crane related to respective package, Centre of excellence only R&D related machines Utility.
  • With activity of Condition Monitoring (CM), Overhauling, Corrective Maintenance, Statuary clearance, Replacements & Refurbishment, Maintenance and testing of tools and Tackles, Maintenance log book, System improvements & Modifications, Documentation, Material management, Testing Calibration & interlock protection checking, Fire & Safety Equipment
  • Maintain PM compliance (98%), Man power compliance (97%), 5S (95%), OHS & Statutory compliance (zero accident), plant up time (99.95%).
  • AHU System, Screw Chiller -120 TR- 10 NOS. (Daikin)

Sr.Manager Engineering

Ashima Group
Ahmadabad
03.2014 - 01.2021
  • Here I handle Utility Section Steam boiler (Themax-15TPH, CVL-10 TPH), Thermo pack boiler (Capacity 3000000 Kcal/Hr.), Chiller and Air Compressor, Humidification Plant. Caustic Recovery plant.
  • Involved in project work say boiler bag filter and other plant related activity, plant expansion project, energy saving audit at utility in boiler air compressor. Reduced power consumption at boiler and air compressor.
  • Condensate water recovery and control air, steam and water loss which direct effect on utility budget control. Improve in boiler efficiency and coal consumption reduces.
  • Involve in legal formalities say GPCB, IBR, LPG yard storage through state and government of India.
  • Prepare monthly MCS report, Budget report, Breakdown report, and preventive maintenance report
  • DM Plant & Softener Plant

Mechanical Engineering Head

Aarvee Denim and Exports Ltd.
Ahmadabad
10.2009 - 03.2014
  • Centac (IR) -8000 CFM – 02 Nos, Centac (IR) -4000 CFM -01 Nos.
  • ZR-400/ 2200 CFM – 01 Nos, ZR-275/1600 CFM – 02 Nos.
  • GA-110/ 900 CFM – 01 Nos. GA-90/ 630 CFM – 02 nos.
  • Kaeser (Kaeser) – 730 CFM – 03 nos.
  • GA-75/530 CFM- 03 Nos. GA-45/300 CFM -01 Nos GA-22/ 01 Nos.
  • THERMOPACK -100000 KCL/ HR. 02 NOS.
  • THERMOFLUID BOILER -1.8 TPH
  • HRU, VAM UNIT, GAS FIRED BOILER -800 KGS/HR.
  • YARN CONDITIONING PLANT CAPACITY-1200 KGS, 1000 KGS.
  • ETP -800 M3/DAY
  • H-PLANT-14 nos. BOILER-6 Ton, and 12 FBC (ESP) Ton (IBL), RO Plant- 14.3M/hr. total 03 nos. Thermax make.
  • Project Work- Involve in Project handling new Process Machine say Dyeing Sizing, Plain Sizing, Zero, Merserize, Stenter, all pipe line work steam Line, Water Line, Air Line, Weaving machine (Air-Jet Looms),water distribution system, We are Handling Teamwork with all Kinds of work.

Mechanical Engineer

Gujarat Ambuja Exports Ltd.
03.2005 - 10.2010
  • ZT-250, VSD with Dryer (1462 CFM) Atlas Copco make.
  • ZT-200, with dryer (1210 CFM) Atlas Copco makes.
  • ZR-145, With Dryer (1000 CFM), Atlas Copco makes.
  • GA-45 (08 nos.) With dryer (210 CFM each) Atlas Copco make.
  • H-Plant –LTG. (Germany) -13 Nos. Plants (Auto motion Plant).
  • H-Plant –LUWA (Switzerland) -05 Nos. Plant (Auto motion Plant).
  • H-Plant –Botiboi Plant 01 Nos.
  • H-Plant –C-Doctor Plant-01 Nos.
  • Handling of Workshop with Fabrications & maintenance works.
  • Involve in Project of 2000 Spindle spinning plant of LUWA Auto motion.
  • With Traction & Installation of H-Plant.
  • New Power Plant (4.5 MW) Eraction worked.
  • Handling Chiller Plant & Boiler.
  • Worked of D.G. Diesel to F.O. Conversion.

Technical Adviser

Rasna (Waves) Foods Pvt. Ltd.
Piploi, Himmatnagar
01.2003 - 01.2005
  • Coordinate activities of all site utility management
  • Insure all job responsibilities; reports, etc. are completed on time
  • Prepare management scorecard information
  • Single point communication with Utilities (Water, Natural Gas, Electricity)
  • Prepare and monitor site utilities budget
  • Prepare and monitor project budget plans
  • Approve all monthly utility bills for payment
  • Work schedule planning for 24/7, 365 day with UAW Stationary Engineers, with OT and vacation scheduling
  • Manage vendors in accordance with all Site, Safety and Environmental Protocols
  • Organize, Plan, Manage and provide “real time” feedback to the Facility Manager during planned and unplanned utility shutdowns
  • Responsible for operation, maintenance, efficiency tracking and improvement of powerhouse equipment (i.e., chillers, compressors, boilers, etc.)
  • Support Facilities initiatives: Energy & Water reduction; Utility reliability
  • Excellent interpersonal skills and ability to build effective relationships at all levels of the organization
  • Strong teamwork with an ability to interact with people from all functions and levels within the organization
  • Good levels of English written and oral communication skills
  • Have previous experience on all utilities and plant engineering related systems
  • Participate in the Annual and Strategic Planning activity. Provide useful inputs regarding existing production and maintenance capacities, and requirements, to achieve the Projected Plans
  • Prepare Engineers and Supervisors for Succession Planning
  • Actively contribute in technology transfer processes to move towards automation
  • Apply new technology as a driving force for process simplification, economical and Effective payback times
  • Ensure that all engineering utilities activities – planned preventive maintenance, quality of work and staff safety
  • Ensure continuous improvement and efficiency in all work processes
  • Optimize the utilization of available Engineering resources to maximize outputs
  • Minimize and control utility equipment breakdowns
  • Planning the activities related to the maintaining and repairing of Physical systems of utilities equipment
  • Participate in cross-functional teams and provide engineering inputs Support services
  • Ensure continuous improvement, economical and efficient Engineering process
  • Control and manage engineering supplies and contractual service to ensure satisfied quality, spare inventory and service level
  • Monitor Engineering related Risks Assessment procedures as well as Self Inspections
  • Identify and implement cost saving projects to achieve site cost reduction targets
  • Compliance and Procedural Implementations
  • Develop and implement systems, policies, and procedure so that engineering activities are operated safely, support production, and comply with Group and Local regulatory requirements
  • Ensure that all engineering related systems are maintained within their validated Parameters to achieve consistent quality and reliability
  • Ensure that plant engineering design and construction comply with legal Requirements
  • Liaise with Government authorities and Utility Companies to fulfill Regulatory requirement and smooth operation of site
  • Prepare and implement Utility up gradation strategy to delivery timely good results
  • Responsible for performing all duties in accordance with all environmental, health and Safety
  • User performance development plans effectively for better performance and development of teams
  • Empower young engineers to make business decisions
  • Conduct Risks Assessment as well as Self Inspections

Education

B.E. - Mechanical

Nainital
01.2002

H.S.C. -

Auodhya
01.1996

S.S.C. -

Auodhya
01.1994

Skills

  • Swift India Course from NIIT, Allahabad center
  • AUTO CAD-2000 (Mechanical) Course
  • Working Knowledge of SAP
  • Equipment maintenance
  • Utility management
  • Operational optimization
  • Safety compliance
  • Project management
  • Team supervision
  • Vendor coordination
  • Staff training
  • Performance monitoring
  • Problem solving
  • Leadership skills
  • Staff evaluation
  • Documentation management
  • Safety monitoring
  • Reporting and documentation

Accomplishments

  • Award: I have won the Best Site Manager Award for 2022
  • I have won the Best Safety Site Zero Incident and Higher BBS Observation Award 2023
  • I have won the Best Site Team Award for 2024

Disclaimer

Place: - Ahmadabad Signature Date: [Amrendra Kumar Sharma]

Languages

Hindi
First Language
English
Proficient (C2)
C2
Gujarati
Intermediate (B1)
B1

Timeline

Site Manager

Thermax Ltd.
04.2022 - Current

Site Manager

Thermax Ltd.
02.2021 - 04.2022

Sr.Manager Engineering

Ashima Group
03.2014 - 01.2021

Mechanical Engineering Head

Aarvee Denim and Exports Ltd.
10.2009 - 03.2014

Mechanical Engineer

Gujarat Ambuja Exports Ltd.
03.2005 - 10.2010

Technical Adviser

Rasna (Waves) Foods Pvt. Ltd.
01.2003 - 01.2005

B.E. - Mechanical

H.S.C. -

S.S.C. -

Amrendra Kumar Sharma