
Manufacturing professional brings experience in production, fabrication, and forklift operation. Results-oriented with excellent interpersonal skills.
Use wood fabrication equipment such as a nailer machine, boring table, shaper, and high-powered nagging for framing
Operated molding machine for production of molded boards and industrial skill saw for cutting to specified measurements
Responsible for splicing various weights and various widths a paper onto a moving production line for the production of desired orders of corrugated cardboard sheets
Event rental equipment included party tents ranging from 10x10ft tents to 60x120ft tents, stages of various desired heights and square footage, dance floors, graduation set-ups, which involved carpeting large arena style venues such as Notre Dame's hockey arena down to a private residences backyard.
Equipment used in the setup of such events involved luhl forklifts, Avant forklifts, regular forklifts, gas powered hammers, small box trucks, large box trucks, flatbeds
Had to coordinate with venue clients, event coordinator, local utility locators, and upper management for on time, execution of usually non reschedulable events
This company was contracted to the indianapolis colts for setting up their touchdown town event for all home games.
Responsibilities and duties are pretty much the same as my above descriptions for Aays, but at a far lesser scale
Logistics and transportation included the usage of three quarter ton, and above dualy trucks and eighteen foot open trailers and car haulers