Results-driven Site Engineer with extensive knowledge of contractor requirements and operational practices. Adept at optimizing project workflows and ensuring compliance with industry standards. Proven track record in staff leadership and site management, fostering collaboration and enhancing team performance to achieve project goals. Expertise in construction methodologies and best practices contributes to the successful delivery of high-quality projects on time and within budget. Committed to continuous improvement and innovation in all aspects of site operations.
Scope of work:
Construction of 6 Nos. New Well PADs
12 Nos. New WELLBAYS.
BUHASA CDS modification.
Existing RDS’s and PLAT’s Modification.
Gas Lift and Water Injection Requirement.
Additional Produced Water and Disposal Wells Requirement & associated network.
New Off-pad & On-Pad Wells
Pipelines/ Associated piping works
OHL works
Responsibilities:
Scope of work: The project scope is to build a BAB pipeline network (sub-headers and flow lines) to distribute treated seawater from the water-injected pump station main header pipeline to the wellhead piping water injection wells. It also includes PIG launchers/receivers, valve stations, and tie-in with existing wells. The flow lines are CS pipes lined with an inner layer of HDPE lining.
Responsibilities:
Responsibilities:
Projects:
Worked as a lead piping engineer at M/s Robt Stone in Abu Dhabi for ADNOC EPC projects.
Lead a team of supervisors and job performers.
In charge of the entire pipe fabrication, erection, and installation for the project.
Coordinate with the subcontractor for the fabrication of piping spools.
Supervise contractor activities at the site.
Approve time sheets, overtime, and incentives.
Encourage everyone to work in a good safety environment.
Attend the progress meeting with clients.
Coordinate with the engineering and procurement departments. For a smooth flow of materials.
Project 1
PROJECT MODIFICATION AND REQUISITION FORM-4 (EPC Project)
I worked as an approved piping engineer for ADNOC.
Plan for manpower and equipment.
I prepared the work schedule and applied for work permits.
l Maintain good relation with clients
l Coordinate with vendors for prefabricated pipe spools.
Project 2
Modification of nitrogen plant (MIRFA)(EPC Project)
l Worked as approved piping engineer from ADNOC.
l Fabrication of big bore CS pipes like 56”, 48”
l Insatllation/ erection of big bore fabricated spools
l Installation of pipe bridges/supports structures.
Project 3
Modification of 24” fire water ring /line inside crude oil main pump station (MPS)(EPC Project)
l Worked as approved piping engineer from ADNOC.
l Fabrication of 24”/16”/8”/4” CS pipes
l Victaulic coupling installation for pipe spool joints
l Monitor the progress of third party pipe fabrication.
l Follow with third party for fabricated pipe spools
Projects Worked for Qatar Petroleum.
E3D AVEVA
undefinedUSD 5000