ANIL KUMAR

ANIL KUMAR

Lead Piping Engineer
Mangalore

Summary

Results-driven Site Engineer with extensive knowledge of contractor requirements and operational practices. Adept at optimizing project workflows and ensuring compliance with industry standards. Proven track record in staff leadership and site management, fostering collaboration and enhancing team performance to achieve project goals. Expertise in construction methodologies and best practices contributes to the successful delivery of high-quality projects on time and within budget. Committed to continuous improvement and innovation in all aspects of site operations.

Overview

24
24
years of professional experience
3
3
Languages

Work History

Site Engineer (Pipeline/Piping)

CPEC
09.2025 - 10.2025

Scope of work:

Construction of 6 Nos. New Well PADs

12 Nos. New WELLBAYS.
BUHASA CDS modification.
Existing RDS’s and PLAT’s Modification.
Gas Lift and Water Injection Requirement.
Additional Produced Water and Disposal Wells Requirement & associated network.
New Off-pad & On-Pad Wells
Pipelines/ Associated piping works
OHL works

Responsibilities:

  • Shall be responsible for the execution and control of construction activities as per the method statement, and lead the construction team for the safe work execution at the site.
  • Shall ensure the latest revised approved construction drawing, or isometric drawing, for site activities.
  • Shall ensure that the proper field material is available.
  • Plan the activities in coordination with the Job Performer and the permit coordinator in advance.
  • Check in hand all the required documents, such as MS, JSA/FRA, approved drawings, third-party certificates, and a valid permit to work before work starts.
  • Coordinate with the HSE Officer from time to time to carry out the job safely and in an orderly manner.
  • Coordinate for the immediate suspension of work in the event of any emergency or uncertainty at the site, and inform site management to ensure the safe evacuation of all personnel whenever required.
  • Coordinate with the implementation contractor, permit controller, and site engineer for upcoming permits.
  • Coordinated with subcontractors, ensuring their work met project specifications, as well as monitored their progress toward completion.
  • Enhanced site safety by conducting regular inspections and enforcing strict adherence to safety protocols.
  • Oversaw quality control and health and safety matters for construction teams.
  • Troubleshot on-site issues promptly using analytical problem-solving skills resulting in minimal delays to the overall schedule.
  • Improved client satisfaction by providing regular updates and swiftly addressing any concerns or issues.

Site Engineer Pipeline/Piping Engineer

Archirodon Construction
11.2019 - 09.2023

Scope of work: The project scope is to build a BAB pipeline network (sub-headers and flow lines) to distribute treated seawater from the water-injected pump station main header pipeline to the wellhead piping water injection wells. It also includes PIG launchers/receivers, valve stations, and tie-in with existing wells. The flow lines are CS pipes lined with an inner layer of HDPE lining.

Responsibilities:

  • Coordinated with subcontractors, ensuring their work met project specifications, as well as monitored their progress towards completion deadlines.
  • Managed on-site resources effectively, including personnel allocation, equipment utilization, and material storage to ensure smooth project progression with minimal downtime.
  • Created work schedules and adjusted as needed to meet project deadlines and keep shifts properly staffed.
  • Recorded daily events and activities in site diary to evaluate process and improve productivity.
  • Reduced material waste through accurate estimation, procurement, and usage tracking of required resources.
  • Facilitated smoother project handovers with thorough documentation and clear communication with clients.
  • Visited project sites during construction to monitor progress and consult with contractors and on-site engineers.
  • Identified and resolved potential structural issues.
  • Acted as contact for client's communication with field personnel.
  • Interacted with state and local agencies concerning compliance with codes and regulations.

Lead Piping Engineer

M/s Robt Stone LLC.
11.2019 - 09.2023

Responsibilities:

  • Implemented quality control measures and continuous improvement initiatives to enhance the overall performance of piping systems throughout their lifecycle.
  • Collaborated effectively with stakeholders to gather requirements and develop customized solutions that met or exceeded expectations.
  • Drafted system functionality and performance requirements by integrating production and budgetary goals.
  • Increased overall plant safety by conducting regular inspections, identifying potential hazards, and recommending corrective action plans.

Projects:

Worked as a lead piping engineer at M/s Robt Stone in Abu Dhabi for ADNOC EPC projects.

Lead a team of supervisors and job performers.

In charge of the entire pipe fabrication, erection, and installation for the project.

Coordinate with the subcontractor for the fabrication of piping spools.

Supervise contractor activities at the site.

Approve time sheets, overtime, and incentives.

Encourage everyone to work in a good safety environment.

Attend the progress meeting with clients.

Coordinate with the engineering and procurement departments. For a smooth flow of materials.

Project 1

PROJECT MODIFICATION AND REQUISITION FORM-4 (EPC Project)

I worked as an approved piping engineer for ADNOC.

Plan for manpower and equipment.

I prepared the work schedule and applied for work permits.

l Maintain good relation with clients

l Coordinate with vendors for prefabricated pipe spools.

Project 2

Modification of nitrogen plant (MIRFA)(EPC Project)

l Worked as approved piping engineer from ADNOC.

l Fabrication of big bore CS pipes like 56”, 48”

l Insatllation/ erection of big bore fabricated spools

l Installation of pipe bridges/supports structures.

Project 3

Modification of 24” fire water ring /line inside crude oil main pump station (MPS)(EPC Project)

l Worked as approved piping engineer from ADNOC.

l Fabrication of 24”/16”/8”/4” CS pipes

l Victaulic coupling installation for pipe spool joints

l Monitor the progress of third party pipe fabrication.

l Follow with third party for fabricated pipe spools

Site Engineer (Pipeline/Flowline)

Al Haditha Petroleum Services
08.2018 - 11.2018
  • Worked for Daleel Petroleum.
  • Managed on-site resources effectively, including personnel allocation, equipment utilization, and material storage to ensure smooth project progression with minimal downtime.
  • Manage contractors site-activities.
  • Coordinate with contractors for site-activities, permits.
  • Conduct progress review meetings with contractors.
  • Fabrication of flow lines from wellhead to manifold station.
  • Fabrication of Pipeline header lines for water injection to wellhead.
  • Internal lining of Pipeline/flowlines with HDPE liners.
  • Co-ordinate with QC for inspection of lines and handover to hydro testing department.
  • Final handover of the system to the client.

Engineer (Piping)

Punj Lloyd
09.2008 - 09.2017
  • Manage contractor activities at site.
  • Do site visit with survey team.
  • Worked in pressure reduction stations, metering stations, BSVs, PIG launchers/receivers compound, and tanker loading area/piers.
  • Check for Piping ISO, GAD,P&ID's, Plot Plan sheets.
  • Manage fabrication of spools at fabrication yard.
  • Manage with piping fabrication contractor.
  • Erection of Block valves. ESDV, piping spools at BSV stations.
  • Attend progress meetings with the client.
  • Coordinate with contractors for site activities, permits, manpower handling.
  • Coordinate with civil team for road crossing works, NOC, survey team.
  • Coordinate with bending supervisor for pipe bends.
  • Supervise installation of PIG receiver and launchers.
  • Coordinate with coating supervisor for coating of pipeline joints.
  • Review of MS provided by contractors for approval.
  • Coordinate with HDD contractors for site activities and permits.
  • Coordinate with road crossing contractors for site activities and permits.
  • Maintenance of pipelines, piping systems, gas distribution station, pumps, pumping station, loading arms, filters in warranty period.
  • Coordinate with QC team for proper records of pipeline RFI.
  • Assist Perform pigging operations like cleaning PIGS, chemical pigging, caliper pigging, MFL pigging.
  • Maintenance of chemical injection pumps, corrosion inhibitor pumps.
  • Perform maintenance activities after Commissioning.
  • Perform first year operations and maintenance of equipments and system.
  • Perform maintenance of JIB cranes, Launcher /Receiver trolley.
  • Perform load test for JIB cranes for SWL.
  • Perform maintenance of PIG Launcher/Receiver.
  • Sampling of Gas in pipelines along with client representative and send it to lab for analysis and match the result with Gas Analyzer installed in the station in SCADA.
  • Ensure smooth flow of materials and equipment's for daily progress.
  • Maintain good relationship with planning and procurement department.
  • Encourage workers to work with full safety and strict discipline.
  • Conduct and attend safety and daily tool box meetings and explain the risk involved with the job.
  • Also involved in hydro testing of station piping and pipeline.
  • Apply for work permits as relative work has to be carried in live stations.
  • Assist in creating an inspiring work culture.
  • Developed and maintained relationships with suppliers to facilitate quality and timely delivery of materials.

Projects Worked for Qatar Petroleum.

  • Project 1: DUPRP (Doha Urban Pipeline Relocation Project)
  • Project 2: SGTP (EPIC of Strategic Gas Transmission Project)
  • Project 3: MPPL (Multi Product Pipeline Project)

Piping Engineer

Reliance Engineering Associates Limited
01.2007 - 09.2008
  • Project implementation, execution, & Monitoring project managements.
  • Project planning and scheduling activities and site engineer.
  • Preparation Specifications, enquiries and Feasibility plans models for various packages.
  • Developing conceptual, preliminary and final approach strategy for projects.
  • Technical discussions with contractors / suppliers and freezing scope and responsibility matrix.
  • Updating of project Plan at regular intervals. Identification of critical activities, follow-up with contractors/vendors for achievements of targets and preparing MIS reports.
  • Detailed engineering of the project, quantity estimation, budgets, material specification (procurement), Technical recommendations, drawings, & layouts.
  • Preparation of progress reports, evaluating trends and predicting their effect on project progress.
  • Tracking of contractor's performance/submittals, review of project progress report/gives necessary guide line & reporting to higher authority and preparing MIS.
  • Familiar with drawings and specifications.
  • Inspection of equipments at supplier's site.
  • Completely owned by Reliance Industries Limited through a consultancy Midland Corporation.

Mechanical Engineer

Sherlekar Industries
12.2001 - 12.2006
  • In charge of the entire fabrication department.
  • Explain the job to the technicians/Fitter and work with them.
  • Completion of the job within given time period.
  • Prepare the job for inspection from the company inspectors.
  • Install the job at work site.
  • Maintenance of aluminum extrusion machine.
  • Maintenance of impellers, blowers, EOT crane, agging furnace, heat exchangers, hydraulic press, diesel generators.
  • Dealing with Structural and Piping fabrication works for all major companies.
  • Project Works: Rolling of 20mm sheet to from a coupling for a high pressure pipe line and testing it for 50 kg/sq.cm pressure for Kudremukh iron Ore Company.
  • Fabrication of an Agging furnace to heat extruded aluminum to 180 degree centigrade for Sherlekar Industries.
  • Fabrication of a Coupling from sheet and weld it to a pipe line and test it for 50 kg/ sq.cm pressure for Kudremukh iron ore company.
  • Trusses for cranes fabricated from pipes to lift 08Tons capacity for Sherlekar Industries.
  • Fabrication of pipe lines for smooth flow of water through heat exchangers for Sherlekar industries.
  • Construction of Aluminum melting furnace and commissioning of furnace for Sherlekar industries.

Education

B.E. - Mechanical Engineering

Malnad College of Engineering
Hassan, Karnataka
08.2001

Diploma in Auto-Cad.Version 2004 - undefined

Manipal Institute of Computer Education
Mangalore

Skills

E3D AVEVA

undefined

Personal Information

  • Father's Name: P. Rama Naik
  • Date of Birth: 1978-07-25
  • Gender: Male
  • Nationality: Indian
  • Marital Status: Married

Salary Details

 USD 5000

Personal data processing

I hereby affirm that the above given information is accurate and true to the best of my knowledge.

Timeline

Site Engineer (Pipeline/Piping)

CPEC
09.2025 - 10.2025

Lead Piping Engineer

M/s Robt Stone LLC.
11.2019 - 09.2023

Site Engineer Pipeline/Piping Engineer

Archirodon Construction
11.2019 - 09.2023

Site Engineer (Pipeline/Flowline)

Al Haditha Petroleum Services
08.2018 - 11.2018

Engineer (Piping)

Punj Lloyd
09.2008 - 09.2017

Piping Engineer

Reliance Engineering Associates Limited
01.2007 - 09.2008

Mechanical Engineer

Sherlekar Industries
12.2001 - 12.2006

Diploma in Auto-Cad.Version 2004 - undefined

Manipal Institute of Computer Education

B.E. - Mechanical Engineering

Malnad College of Engineering
ANIL KUMARLead Piping Engineer