Summary
Overview
Work History
Education
Skills
Areas Of Expertise
Languages
Training
Profile Snapshot
Personal Information
Timeline
Generic
Anil Kumar Pradhan

Anil Kumar Pradhan

Angul

Summary

Dynamic Assistant Construction Manager with extensive experience at Larsen & Toubro Ltd., excelling in project management and site supervision. Proven track record in successful installation and commissioning of complex piping systems, ensuring quality control and timely project delivery. Adept at liaising with cross-functional teams and managing manpower effectively to achieve project milestones. Skilled Assistant Construction Manager with comprehensive understanding of project planning and management. Demonstrates ability to oversee all phases of construction projects, from design through completion. Strong background in team leadership, conflict resolution, and budget management. Notable contributions include successful delivery of complex projects on time and within budget while adhering to safety protocols. Results-oriented construction manager with several years of experience in industry. Demonstrated to manage and deliver projects on time and within budget. Extensive knowledge , financial operations and employee relations. Entrepreneurial mindset and skilled in developing trusted relationships.

Overview

13
13
years of professional experience

Work History

Assistant Construction Manager (Mechanical)

Larsen & Toubro Ltd.
Jamnagar
12.2025 - Current
  • Preassembly and erection of heavy bore pipe in trench in Underground Piping, Above Ground piping, SS spool Fabrication Structure.
  • Coordination Shop Drawings with respect to design drawings, fabrication & erection methods and its approvals.
  • Coating of underground piping using PG100, R95 and HSS of Joint.
  • Coordinate with other departments to obtain Spools and required support for carrying smooth works.
  • Responsible for erection and Hydro testing of Process and Utility piping.
  • Attending daily meetings regarding schedule of completion & implementation of site activities regarding QC aspects.
  • Involve all site works are raw material handling, welding process, manpower daily utilization.
  • Preparation of ISO drawing with respective site condition.
  • Fabricate and erection the spool as per prepared ISO.
  • Preparation of weld plan for site welding joints and Control the welders and sub-contractors.
  • Daily reported to Superiors & updating progress.
  • Also show the actual vs plan schedule and achievement.
  • Checking the flange Parallelism, supports drawing, gasket and bolts of the piping and equipment at the time Mechanical clearance.

Assistant Construction Manager (Mechanical)

Aquatech Systems (Asia) Pvt Ltd.
Chalik Energy
08.2025 - 12.2025
  • Coordinate with vendors to get the user manual of supplied system and incorporated those in user manual for ZLD system.
  • Preparation of site protocols/formats for daily report, weekly report, erection completion, hydrotest, vacuum test, water boiling trial and feed trail.
  • Following with vendor for complete the work on given time.
  • Site validation of running parameters versus design.
  • Complaint Handling and providing proposed resolution.
  • Review of PFD and P&ID w.r.t process, operation and maintenance. Incorporated of correction in documents.
  • Review of equipment layout, 3D models with engineering team on operation, maintenance and aesthetically.
  • Technical discussion and meeting with vendors on their offered products and validate them along with engineering team.
  • Coordinate with cross functional departments like project & procurement team to ensure on time delivery of bought out items at site to complete the erection work as per schedule and ensure timely commissioned & handover of projects.

Area Manager

Reliance Industries Ltd.
Jamshedpur
04.2023 - 08.2025
  • Responsible for Laying underground Pipeline through open trench or through HDD machine, and handover span link wise for operate the network.
  • Coordination with planning, vendor, sub-ordinate and NHQ team to complete the priority work as per target.
  • Successfully completed 1500 kms fiber link on management given deadline.
  • Attend daily work planning meeting with vendor and NHQ team.
  • Following with vendor for complete the work on given time.
  • Attending daily meetings regarding schedule of completion & implementation of site activities.
  • Liaoning with vendor and Local people and Authority to resolve the issue on field.
  • Verify the work quality and quantity as per workorder.

Senior Executive

Reliance Project and Pro Ltd.
Ranchi
10.2021 - 03.2023
  • Responsible for Laying underground Pipeline through open trench or through HDD machine, and handover span link wise for operate the network.
  • Attend daily work planning meeting with client and senior member.
  • Following with vendor for complete the work on given time.
  • Attending daily meetings regarding schedule of completion & implementation of site activities.
  • Liaoning with vendor and Local people and Authority to resolve the issue on field.
  • Verify the work quality and quantity as per workorder.

Assistant Engineer (Project)

Gannon Dunkerley & Co. Ltd
Jamnagar
05.2014 - 03.2018
  • Preassembly and erection of heavy bore pipe in trench in Underground Piping, Above Ground piping, SS spool Fabrication Structure. For Fabricated Pipes erection are done by using 600Ton, 300Ton, 100Ton, 70Ton, 40Ton crawler crane.
  • Coordination Shop Drawings with respect to design drawings, fabrication & erection methods and its approvals.
  • Coating of underground piping using PG100, R95 and HSS of Joint.
  • Coordinate with other departments to obtain Spools and required support for carrying smooth works.
  • Responsible for erection and Hydro testing of Process and Utility piping.
  • Attending daily meetings regarding schedule of completion & implementation of site activities.
  • Involve all site works are raw material handling, welding process, manpower daily utilization.
  • Preparation of ISO drawing with respective site condition.
  • Fabricate the spool as per prepared ISO.
  • Erection of pipe and spools as per ISO.
  • Preparation of weld plan for site welding joints.
  • Control the welders and sub-contractors.
  • Daily reported to Superiors & updating progress.
  • Also show the actual vs plan schedule and achievement.
  • Checking the flange Parallelism, supports drawing, gasket and bolts of the piping and equipment at the time Mechanical clearance.
  • Performing torquing and tensioning activates of the flanges as per company provided protocol.
  • Inspection for all Fabrication and erection of piping as per ISO drawing.
  • Performing pipeline cleaning by doing pigging, cardboard blasting and flushing operation after getting clearance from quality control.
  • Preservation of pumps, column, vessels, heat exchanger, molesleve, Regeneration Heater etc. according to the document supplied by vendor for preservation and related piping installation.
  • Load test of EOT CRANE for hand over to operation.
  • Play a key role in the installation of the EVC column and DCAC column internals and performing a hydro test and pneumatic test of the column.
  • Checking of Equipment erection and its pipe connections like heat exchanger, pumps etc.
  • Responsible for supervising field of Mechanical Equipment and Fabrications, Hydraulic & Pneumatic testing of Pipelines, Material Handling Systems, and Structural Construction, monitoring activities and technical guidance in interpretation of specifications, equipment, and productivity.
  • Coordinate with LINDE team for resolve the issues during project and commissioning time.
  • Final handover to operation after all commissioning activities with all the documents.

Engineer Trainee (MECHANICAL)

Ganesh Enterprises
Tamnar
04.2013 - 05.2014
  • Attend daily work planning meeting with client and senior member.
  • According to planning engage manpower for maintenance schedule.
  • Check all the equipment’s like Conveyor, Fluid Coupling, Gear Box, cyclone, impeller as per schedule routine given by the O&M team.
  • Metal refine screen maintenance as per schedule and on running condition also.
  • Fabrication and erection of pipeline and chute if any requirement for bypass the system temporarily for maintenance purpose.
  • Check all the instrument like TG, PG, INSTRUMENT VALVE and maintain all the record-on-record book.

Education

MBA - Operation Management and Marketing

Biju Patnaik University of Technology
Odisha
01.2020

B.Tech. - Mechanical Engineering

Centurion University of Technology and Management
Bhubaneswar, Odisha, India
01.2013

C.H.S.C. -

Regional College
Dhenkanal, Odisha

B.S.E. -

P.T.C High school
Angul, Odisha

Skills

  • Project Management
  • Installation & Pre-Commissioning
  • Testing & Validation
  • Erection & Commissioning
  • Site Supervision
  • People Management
  • Planning & Execution
  • Client Relationship Management
  • Liaison & Coordination
  • Quality Control
  • Project Scheduling
  • Progress Monitoring
  • Team Management
  • Coordination with Stores & Purchasing
  • Manpower Coordination

Areas Of Expertise

Experience in ETP, Telecom, Piping & Structure project execution (both EPC & contractually) in project management, construction and commissioning., Reviewing method of statement and work specific quality control plan., Coordinating with stores & purchasing department regularly.

Languages

  • Odia
  • Hindi
  • English

Training

  • Six Weeks, NATIONAL ALUMINIUM COMPANY LIMITED (NALCO), ANGUL, Odisha, Coal Handling Plant
  • Six Weeks, CTTC, Practical Training

Profile Snapshot

10+ years, ZLD, Telecom, Petrochemical, Project management, Installation of Telecom Tower, Process Piping, Utility Piping (UG, AG), Erection of Cryogenics piping & jacket piping, SS Spool Fabrication, Alloy steel (P91) spool fabrication

Personal Information

  • Passport Number: B6973081
  • Passport Expiry Date: 09/09/33
  • Father's Name: Ananda Chandra Pradhan
  • Date of Birth: 07/14/90
  • Gender: Male
  • Nationality: Indian
  • Marital Status: Unmarried

Timeline

Assistant Construction Manager (Mechanical)

Larsen & Toubro Ltd.
12.2025 - Current

Assistant Construction Manager (Mechanical)

Aquatech Systems (Asia) Pvt Ltd.
08.2025 - 12.2025

Area Manager

Reliance Industries Ltd.
04.2023 - 08.2025

Senior Executive

Reliance Project and Pro Ltd.
10.2021 - 03.2023

Assistant Engineer (Project)

Gannon Dunkerley & Co. Ltd
05.2014 - 03.2018

Engineer Trainee (MECHANICAL)

Ganesh Enterprises
04.2013 - 05.2014

MBA - Operation Management and Marketing

Biju Patnaik University of Technology

B.Tech. - Mechanical Engineering

Centurion University of Technology and Management

C.H.S.C. -

Regional College

B.S.E. -

P.T.C High school
Anil Kumar Pradhan