Anindya Mukherjee

Anindya Mukherjee

Shahjahanpur

Summary

Present assignment as Maintenance Management and Capital Projects, with 16 years of experience in Operation, Maintenance, Project Management, Reliability, TPM, Materials Management and Team Management. Good entrepreneurial, managerial and leadership abilities coupled with effective communication skills, capable of handling projects independently and effectively steering a team of individuals to accomplish targeted goals. Aspiring for opportunities preferably in the role of Operation, Maintenance & Projects.

Overview

16
16
years of professional experience

Work History

Plant Maintenance and Capital Projects Leader

Wabtec Corporation
Shahjahanpur
11.2019 - Current
  • Leading the Plant Maintenance and Capital Projects in Wabtec Corporation, Roza Plant, Shahjahanpur (UP)
  • Planning and execution of maintenance activity for Plant Equipment’s
  • Develop and monitor investment and maintenance budgets, controlling costs and identifying opportunities for cost savings and operational efficiencies
  • Ensure compliance with relevant regulatory requirements, and safety standards
  • Deployment of safe operation and Maintenance for Machinery’s Overhead Cranes, Pumps, Diesel Generators, underfloor wheel lathe, Man lift, Drop Table, Compressor plant, and Utility
  • Instrumental in the daily scheduling and planning of the maintenance department
  • Liaisoning with govt departments like UP Electricity Board, Weight & Measure department
  • Implementing standard procedures for maintenance and considerably reducing downtime
  • Inventory Management, Asset history and Stock management
  • Annual Budgeting for Maintenance activity and tracking, CAPEX and OPEX both
  • Plant Maintenance budget planning
  • Cost control initiatives
  • Spare parts management and planning
  • Fulfilling Statutory compliance requirements for the Facility
  • KPI, MTBF, MTTR, TBM were introduced for construction equipments under using the methodology of TPM
  • Budget planning for equipment’s safety and reliability infrastructure
  • CAPEX planning for Major equipment’s and annually Budget allocation
  • Certified Internal auditor of ISO 9001-2015 and development for Maintenance shed
  • IMS 14001&45001 audit compliance .
  • Calibration planning of all maintenance tools, Pumps and instruments
  • MIS Preparation for Maintenance budget and Equipment level budgeting
  • Kaizen activity deployment for the facility
  • Identifying root cause of failures (RCFA Solve technique) and implementing quick breakdown solutions to put the equipment back in operation within minimum turnaround time
  • FMEA analysis or identify the critical spare parts and inventory stock level
  • Training requirements planning for Team against specialization
  • AMC and Contract Management for Plant Maintenance Vendor
  • SOP and SMP deployment for all equipment’s and facility operation
  • Facilitate the instruments calibration and Govt legislation requirement
  • Preparation and review of SLA for equipment’s AMC
  • Monitor employee work performance annually through a performance review for assigned employee.
  • Monitored workflow processes and identified areas of improvement.
  • Ensured compliance with organizational policies and procedures.
  • Coached and mentored individuals on professional development goals.

Highlight of Capital Projects

  • Full length Locomotive Paint Booth including Electric heater.
  • Turn table-170 tn Capacity.
  • Maintenance shed construction project including equipment installation.

EHS responsibilities-People first initiatives

  • Work permit system deployment.
  • Job safety culture deployment.
  • 2 minutes’ warning reporting.
  • LOTO implementation project for the Facility.

Operation & Maintenance Manager

Lodha Group
02.2017 - 11.2019
  • Leading the Plant and Equipment’s facility in Lodha Group projects in construction sector
  • Overseeing construction sites and analysing their requirements of tools and equipment’s needed
  • Enlisting the needed materials and equipment to ensure on time supply to the facility
  • MIS Preparation for Maintenance budget and Equipment level budgeting
  • Ensuring safety and engineering expertise in catering projects and facility requirements
  • Leading the facility of purchasing machinery for the Annual CAPEX against Projects requirement
  • Develop the Scope of work and Organizational requirement for Plant Machinery’s Operation and Maintenance
  • Planning and execution of maintenance activity for Machinery’s
  • Deployment of safe operation and Maintenance for Machinery’s like Earth Passenger hoist, Cranes, Pumps, Diesel Generators, Conveyor, Skid steer loaders, Backhoe loader, Compressor and Utility’s
  • Implemented standard procedures for maintenance and considerably reducing down time
  • Inventory Management, Asset history and Stock management
  • Costing part estimation of CAPEX and OPEX of project before and post execution
  • Preventive maintenance planning
  • Preparation of Preventive maintenance schedule / calendar and execution
  • Monitoring and analyzing the equipment to avoid unexpected breakdown and efficiently handling breakdown & modification by applying various efforts
  • Attending to all breakdown maintenance with the desired urgency to minimise the downtime
  • Breakdown analysis and corrective action planning to avoid recurrence / repetition of forced repairs
  • CAPA implementation for optimize the breakdown frequency
  • Identifying root cause of failures (RCFA Solve technique) and implementing quick breakdown solutions to put the equipment back in operation within minimum turnaround time
  • FMEA analysis or identify the critical spare parts and inventory stock level
  • Repairs of P &M at central workshop
  • Spares standardization
  • AMC and Contract Management for Plant Equipment’s Vendor
  • Maintaining record and documents of warranties and liasioning work with Government Departments
  • Arrangement of training at site for engineers / technicians in coordination with OEM's KPI, MTBF, MTTR, TBM introduced for construction equipment’s under using the methodology of TPM
  • Budget planning for equipment’s safety and reliability infrastructure
  • CAPEX planning for Major equipment’s and annually Budget allocation
  • TPM-PM pillar concept development regarding construction equipment
  • ISO-14001-2015 environmental Management system requirement preparation and audit arrangements for interdepartmental
  • SAP-PM module introduced for our all project site Equipment’s BD history capture
  • Tracking PM effectiveness for all construction equipment’s, Execute the RCFA solve technique for every BD
  • EHS Facility Development Health Safety Environment Training programs and Implementation
  • Accident /Incident –Near Miss Reporting, Investigation
  • Preparing Project HSE plans, HSE reviews audits, etc
  • Preparing Hazard identification and Risk assessment matrix as per project
  • Organize safety campaign, promotional activities
  • Create safety awareness through Tool Box Talk, training and educational program
  • Develop & implement EHS procedure at all sites
  • Leading EHS Capex’s for continual improvement and to meet global standard for all site Compliance check of all manufacturing sites, vendor, customer etc
  • Auditing of all sites against Global Standards
  • HIRA implemented for all Maintenance as well as new purchasing of equipment’s
  • Facilitated the environmental management systems

EHS Facility Development

  • Health Safety Environment Training programs and Implementation.
  • Accident /Incident –Near Miss Reporting, Investigation.
  • Preparing Project HSE plans, HSE reviews audits, etc.
  • Preparing Hazard identification and Risk assessment matrix as per project.
  • Organize safety campaign, promotional activities.
  • Create safety awareness through Tool Box Talk, training and educational program.
  • Develop & implement EHS procedure at all sites.
  • Leading EHS Capex’s for continual improvement and to meet global standard for all site
  • Compliance check of all manufacturing sites, vendor, customer etc.
  • Auditing of all sites against Global Standards.
  • HIRA implemented for all Maintenance as well as new purchasing of equipment’s.
  • Facilitated the environmental management systems ("EMS"). ISO 14001:2004.

Plant Maintenance Manager

CEAT Ltd
Mumbai
03.2016 - 02.2017
  • Heading the department of PM Cell and CAPEX. Implementation of TPM activities like Kaizen, QIP, and FI projects.
  • Preventive and Predictive Maintenance strategy development.
  • Equipment reliability increasing with the help of PM and restoration activity.
  • Spare parts and Inventory management with the help of FMEA and SPOT tools.
  • Equipment Knowledge enhancement with the help of T& E strategy.
  • Prepare schedules for repair, overhauling, and maintenance of all the machinery and tools in the plant
  • Provide installation guidance to the staff and train in basic troubleshooting
  • Enhance the productivity of the plant by recommending new machines and equipment
  • Zero defect vision implementation for equipment’s. KPI Selection for engineering team.

Projects:

  • Uni drive Mill installation for energy saving. Equipment improvement project and FI project for quality improvement plan initiated. CAPEX making for all projects.
  • MIS reporting for Maintenance and Project to Higher Management.
  • Installed Asset Management System (AMS) in all facility.
  • Reviewed and analyzed life cycle of equipment and created necessary arrangements for disposal
  • Analyzed best effective way to reduce cash outflow for the company with resource optimization
  • Managing & controlling Project Planning, Activity Scheduling, Cost Control and Resource Optimization with Supply Chain Management
  • Supervising & monitoring stock, consumption and non-moving spares at sites
  • Maintaining the end-to-end management of Purchase Order
  • Liaising with the Functional Heads of all teams for smooth implementation of the organizational objectives.
  • Preparing Budget and scheduling for existing/ future prospect jobs o P&M cost estimate for new sites.
  • Hire Cash Outflow budget and monitoring the cost.
  • Develop and implement measurement processes to trend, benchmark and report on asset management, utilisation and effectiveness.
  • Develop and implement risked based Key Performance Indicators (KPI).

Proejct and Reliability Manager

Owens Corning India
Mumbai
02.2015 - 02.2016
  • Drive the project team with proper planning, Engineering & Design. Identify the critical path and take the right decision. Preparing the CAPEX proposal with proper business case.
  • Lead the OC-Taloja brown field expansion project including engineering & design with Procurement.
  • Project cost will be near about-USD124Million.
  • Another specialization field of mine is Reliability which is covering CBM activity, Equipment health report,
  • Equipment Failure analysis by RCFA solve technique.
  • PM and Corrective action planning in SAP-6.0/7.0 including capacity planning and now we are using Prometheus for Graphical work order system.
  • TPM-PM Pillar concept implementation and sustaining improvement.
  • Familiar with FMECA for identify the equipment criticality rate and critical spare.
  • Planning and scheduling of efficient planned and predictive maintenance activities
  • Supervising Maintenance Planning personnel, Maintenance Purchasing/stores personnel, and Reliability crew
  • Participating in the business planning and budgeting process and developing short and long-term cost containment/reduction strategies
  • Determining and driving best practices in equipment reliability, total cost of ownership and providing technical support for proactive maintenance.
  • Driving Key Performance Indicators related to Engineering reliability
  • Updating Equipment Maintenance Plans (EMP) based on data analysis of failures
  • Working with capital project teams to ensure maintainability and reliability are integrated in all capital projects.
  • Controlled expenditures within limitations of project budgets and completed projects on time.

Plant Maintenance Sr Engineer

Ambuja Cements Ltd
Farakka
01.2012 - 12.2014
  • Implementation of Mechanical maintenance planning of all kind of Heavy, Rotary and Static Equipment.
  • Automated Wagon Loading system ,3000MT Structural Works, 10 KM Belt Conveyor Installation/Dry Fly Ash Handling, All plant implementation Projects Carried on Ambuja Cement .MAC(Maintenance of Cement) Implementation, Maintenance and Project Planning.
  • Automated Wagon Loading Project with Maintenance Scheduling Budget-70 Crores
  • Dry Flash Handling System project with Maintenance Scheduling Budget-30 Crores
  • Portable Cement Silo Project with Maintenance Scheduling -25 Crores
  • HOLCIM Certified Training regarding Equipment Reliability from South America.
  • Actively leading reliability team/participate in eliminating bad actors by implementing structured problem-solving techniques such Root Cause Failure Analysis.
  • SAP PM Module implementation, Maintenance workorder, execution planning, Maintenance notification.
  • Annual shut down and Maintenance activity planning.
  • Maintenance cost and Repair & replacement cost tracking.
  • Manage Maintenance costs to ensure adherence to the existing budget.
  • Provide timely and accurate maintenance cost analysis to ensure the budgeting process is accurate and meets the business requirements.
  • Participate in all site projects to ensure that safety, reliability, maintainability, and cost effectiveness requirements are delivered.
  • Key stakeholder in identifying and prioritizing site capital needs. Write, justify, submit and execute site capitalprojects as approved.

Enginering Asst Manager

Phillips Carbon Balck Limited
Mundra
06.2008 - 12.2011
  • Green Field Project of Rs. 500 Crores. Completed commissioning activities in Greenfield project=Areas erected and commissioned 16MW Power Plant, DM Plant and 270MT Carbon black plant(Chemical plant) plant./Also done the 8MW power plant project with Capital Project plant equipment implementation Commissioning with Power generation and implement the reliability system.
  • Identified and implemented multiple process improvements to increase the efficiency of the project management team
  • Planning & execution of preventive, condition monitorin,g and shutdown jobs.
  • Inspection, preventive, breakdown maintenance,and overhauling of plantequipmentss.
  • Maintaining equipment history sheets.
  • Enhance the productivity of the plant by recommending new machines and equipment

Education

Advanced Diploma in Industrial Safety -

MSBTE
Mumbai
01.2020

Chartered Engineer - Mechanical Valuation -

Institution of Engineers (India)
Kolkata
01.2020

B.Tech Mechanical Engineering - Mechancial Engineering

West Bengal University & Technology
Durgapur
06-2008

Skills

  • Plant Maintenance
  • Reliability
  • Project Management
  • Technical competitive sourcing
  • Capex
  • Opex
  • IMS 14001 & 45001
  • Expense Control
  • Operations Management
  • Inventory Control
  • Training and Mentoring
  • Employee Motivation
  • Staff Discipline
  • Goal-Oriented
  • Sustainability projects
  • Create cost saving opportunities
  • Process Improvement

Accomplishments

AmbujaAmbujaTalojaProjectutilizationutilisationutilisationCapex’sCapex’sliasioningminimizeanalyzingLodhaLodhagovtRoza

  • Young Manager 2009-2010 Award given by RPG groups
  • Team of the Month Award given by PCBL
  • Got the Internal Auditor Certificate ISO 9001-2008 (Quality Management System)
  • Rescue Training attend in Ahmadabad Fire and Emergency Services
  • Certified for open Gear Static and Dynamic inspector
  • SKF Certified Vibration Analyst Level2 with FFT analyser
  • HOLCIM Certified Trained Professional Equipment Reliability from South America
  • Trained personnel from Mahindra Institute Quality regarding Data and decision analysis
  • PROCESS CHAMPION’ Award given by GE Transportation, A Wabtec company
  • Pursue of Excellence Award from GE Transportation, A Wabtec Company
  • India Region “SAFETY STAR” award from GE Transportation, A Wabtec Company

Employment Chronicle

MaAmbujaAmbujaTalojaProjectutilizationCapex’sCapex’sliasioningminimizeanalyzingLodhaaintenancenance Cell, 03/16 Ambuja

  • Owens Corning India Limited, Manager Projects & Reliability, 01/15
  • AmCemLodhaimitedmited, Senior Engineer Plant Maintenance Cell, 01/12
  • Phillips Carbon Black Ltd, Asst. Manager Engineering, 06/08

Personal Information

  • Date of Birth: 03/29/86
  • Marital Status: Married

Training

  • 30 Days, Durgapur Steel Plant, Learned the various aspects of the plant including operations, maintenance, products, machineries, and management of different mills/plants. Produce a brief outline about the production process, which is carried out in the steel hub. Made a flow chart of the processes carried out in the Durgapur Steel Plant. Submitted a detailed report on the Continuous Casting Plant.
  • 30 Days, Central Mechanical Engineering Institute (CMERI), Submitted a detailed Project Report on the ‘Drying of Agro Crop ‘on Fluidized Bed Dryer. Learned & observe the various type of fluid measuring device

Languages

  • English
  • Hindi
  • Bengali

Languages

Bengali
First Language
English
Advanced (C1)
C1
Hindi
Intermediate (B1)
B1

Timeline

Plant Maintenance and Capital Projects Leader

Wabtec Corporation
11.2019 - Current

Operation & Maintenance Manager

Lodha Group
02.2017 - 11.2019

Plant Maintenance Manager

CEAT Ltd
03.2016 - 02.2017

Proejct and Reliability Manager

Owens Corning India
02.2015 - 02.2016

Plant Maintenance Sr Engineer

Ambuja Cements Ltd
01.2012 - 12.2014

Enginering Asst Manager

Phillips Carbon Balck Limited
06.2008 - 12.2011

Advanced Diploma in Industrial Safety -

MSBTE

Chartered Engineer - Mechanical Valuation -

Institution of Engineers (India)

B.Tech Mechanical Engineering - Mechancial Engineering

West Bengal University & Technology
Anindya Mukherjee