Looking forward to work with an organization where my efficiency is proved as a professional and to be able to contribute to organization’s success through my skills and activity
Global-ITAC primary functions is to provide technical support for RAN rollout projects for all Ericsson customers across all Regions, whose networks are based on LTE, NR, WCDMA, GSM technologies
Assist customer in troubleshooting project related all the RAN activities when they face issues or struck somewhere including Pre-integration issues, Post-integration till Acceptance (excluding the field optimization and tuning), Software upgradation related issues, Hardware Expansion related issues, KPI related issues, NRO Global Tools (PCI), NPI (FNI/FFI) Deliveries.
Knowledge of troubleshooting tools: LTNG and Logtool.
Trace analysis for troubleshooting for different issue
Analysis & troubleshooting on KPI issue of GNodeB & EnodeB's
Escalate to CSR (P-CSR) where the issue identified a Product Fault and PDU intervention is required.
Coordinate with CSR handler and PDU until the CSR is closed with an FA.
R-DOT configuration & Troubleshooting, Have the knowledge of LTE/WCDMA Combined cell configuration.
Role : RAN NI Specialist (SME)
Worked for NOKIA Multi vendor Project (AT&T – LTE & UMTS).
As a Technical Lead for LTE Project, responsible for RAN support on required SOW, &
Troubleshooting.
RET definition & Troubleshooting
5G Integration (Cold Start)
Auto Provisioning, Bulk License Loading, SW upgrade, Node Syncronization through ENM & OSS
Bridge Suport (Tower Crew Support)
Tower Work Support (RRH / Antenna Swap)
RSSI, SFP Losses troubleshooting
Supporitng Nexius & SAC Wireless Projects for AT&T LTE.
Supporting to On Site Field Technician/Engineer for their existing/New issues regarding HW &integration
Integration.
Weekly team meeting with SPOC & IMs of ATT regarding analysis of Schedule, RCA & week points.
PIM level troubleshooting using PILOTS tool. Perform Multi-Band PIM Interference and Load
Optimization Test (M-Pilot) to obtain result for noise on different sectors of BTS and noise load on
PUSCH/PUCCH.
Skill Sets Details
Fundamentals,
Equipment
& Software
Secure CRT, Putty, OSS / ENM platform.
WinFiol, Cygwin
Ericsson RBS2000 /3000/6000 series BTS
DUL , DUS, XMU03/503, Baseband 5216/5212/6630, TMA, RET, RRUs
Ericsson PDH Devices (ML-E & Traffic Node – 2P, 6P, 20P)
Ericsson OMT, MSM, ML Craft, NESA
Installation, Configuration, Commissioning, Integration, software up-gradation,
Acceptance Testing, Fault Management, Operations & Maintenance.
Basic knowledge of Active & Passive Infrastructure (SMPS, PIU, DG, Tower, etc).
Platforms Window98/XP/ 2000/ 2007.
RET scripting as per NTP0/RET Work Sheet and RFDS.
RETS alarms and script errors troubleshooting.
Remote troubleshooting and expertise for field support.
Branch wise troubleshooting of RSSI degradation using Quantum tool.
Alarm troubleshooting of various service affecting alarms during SCFT.
Sharing points with the higher management in issues/delay of the activity, its reasons and its resolution.
Supporting the team in modifying the existing MOP (Method of procedure) and suggesting for new
MOP of the trial activity done for particular scope of work.
Successfully 103+ LTE Sites (BB6630) deployed & On-Air (Launched First Time) in AIRTEL NIGER
100+ LTE & 2G mixed mode (G+L) sites deployed in AIRTEL NIGER
Worked for AT&T (US) LTE project.
As a Team lead for LTE Project, responsible for a team having 32 engineer.
Responsible for daily activity & Load Balancing capacity between Scheduled Sites & NIC.
Responsible for RC&I AT&T NIC Interrupt Analysis on weekly basis.
Weekly team meeting with SPOC & IMs of ATT regarding analysis of Schedule, RCA & week points.
Responsible for competency of my team, time to time to be update with newly launched product &
Services.
Supporting the management team in modifying the existing MOP(Method of procedure) and suggesting
for new MOP of the trial activity done for particular scope of work.
Part of a sub-team for Trial activity to be done or First Feature Activation (FFA) on customer network
of different site configuration (IDL2, Baseband Migration Q1 & Q2).
Sharing points with the higher management in issues/delay of the activity, its reasons and its resolution.
Providing training to the new members of the team for each scope of work in the project.
Support to field engineer for transferring the configuration version from Ericsson Digital unit for LTE
(DUL) to new DUL or Ericsson Standard digital unit (DUS).This activity increases the capacity of
enodeB.
Support & Coordination with Field engineer while Antenna change of the sector and
VSWR,RSSI,alarm and traffic monitoring of the site.
Call/data test and drive test support by locking/unlocking and barring/unbarring the cells. The multiple
carriers are given different priorities and different sector power to do the data test as instructed by
customer.
Giving sole technical support to Field Engineers for Alarm rectification or Site troubleshooting like all
type integration alarms (RET (remote electrical tilt device)and TMA(tower mount antenna device)
alarms, RRU and license alarms), OSF loading and extraction of Onsite integration log.
EnodeB integration/Sectorization/Reconfiguration/new site build/WLL scope of work supported &
integrated manually by running the scripts in CLI (moshell platform/secureCRT/ENM). Also Support
to Field engineer integrating with Smart Laptop (SL).
Working experience for Ericsson new OSS Plateform “ENM”
Working experience for CLI used for ENM.
New Site Built & DAS/COW/CRAN sites using Baseband-BB5216 & BB6630.
Bulk License Load by SHM, Alarm Monitor, Add/Delete site, AP Generation, Sync by ENM.
Migration from DULto DUS & DUS to BaseBand-5216 for capacity increase.
2 or 3 DUL/DUS to 1 or 2 BaseBand-5216 migrtaion.
Carrier addition / sectorization) with 2 Baseband Unit (IDLe - BB5216/BB6630) for LIVE site.
Multicarrier / BWE / Power Split for AWS or PCS carrier as per requirement of Customer.
BBU Migration on L19Q3 s/w
BBU Migration with Retofit (PCS or AWS)
IDL2 activity using DUS & XMU
End to End integration for various SOW with call test (SRS, E911, AWS_3, WLL), KPI monitor &
Fault management.
RET Troubleshooting/Reconfiguration, RET Scan
License loading manually and by Software management organizer (Moshell GUI /ENM/SHM ).
Remote support given to field engineers in the activity of enodeB power splitting of a particular sector
by dividing the power of the sector radios to two different carriers. Defining the configuration logically
with scripts.
Changing the NodeB Parameters as per given data / R&D CIQ (EnodeB name change, cell name
change, bandwidth, earfcn, sector power,electrical tilt).
Remote support to Field Engineer for hardware migration from RUS(radio unit) to AIR/A2 for
increasing the RX power and defining the same change logically in the endodeB by using the script.
Defining the enodeB Cross sector redundancy (CSRF) to Non CSRF conversion or vice versa with the
data provided by customer and creation of the same script.
Creation of site in OSS with templates prepared using the CIQ/Site details provided by the customer.
Generation of Onsite files using those templates.
Ericsson Global India Pvt Ltd.
DEC2011 TO SEP2014
NOC Enigneer
Responsible for all the fault related alarms of the Ericsson equipment like RBS6000 series.
Checking and doing the initial triage of the faults using the OSS-RCs and secure CRT.
Chekiang the backhaul and testing the Ethernet/TDM circuits in the Spirent/React tool.
Checking the IP aggregator ports.
Checking various network nodes like Minilink TN,AEM,AEC,EEGS using Service-On.
Responsible for Checking the connectivity between SP210/SP310 and the IPA.
Responsible for checking the connectivity between RBS and the Site integration unit.
Raising trouble tickets for the faults using Trams ticketing tool and engaging appropriate fixed agents.
Coordination with the Field techs and Switch techs for the high severity faults.
Opening the driving the bridge calls for the customer/network impacting high severity faults.
Handling of Alcatel Mux for E1 provisioning to TATA Sites
Take care of Nec microwave & Bg20 Mux implementation
Coordinating with subcon for E1 routing from BSC to the site end
Ring network formation & DCN planning for NMS visibility
E1 provisioning from BSC to the site ends by coordinate with the site engineers to integrate the sites.
Troubleshooting the e1 problems occurred in the site at the time of integration
E1 mapping for end to end e1 delivery for the Tata & Uninor sites
End to End to E1 delivery for the Datacomm sites
Coordinating with the customer for AT sign off.
Responsible for the overall Project Implementation which includes the Installation, Commissioning and
AT of new BTS and BSc Equipment’s.
Sites allocation of sub cons According to Customer Requirements.
Responsible for Network rollout of 3G BTS (DBS 3900, MIMO BTS) technical engineering
implementation, including engineering supervision, commissioning, system integration, maintenance
and technical support.
Using LMT SOFTWARE for commissioning
Co-ordination with vendor for critical network faults/new Implementation(Major card failures, wave
addition)
Huawei Microwave (910,950) Implementation
Commissioning & fault Analysis of Huawei Mux
Alarm Monitoring& Fault Analysis by Viewing through NMS
Commissioning & Fault Analysis of Huawei Microwave equipment
Coordinating with the sub cons to take care the Implementation
Coordinating with the client for the AT sign off
Trouble shooting of Huawei microwave problems
E1 migration from smaller Network to Larger network
Coordination with MS team to recover the site outages
GSM, WCDMA, LTE and NR technology
undefinedWinner of Ericsson well known Power & Star awards multiple time for contribution.
Customer Excellence award for AT&T RAN support.
Nokia Award for Successfully Implemention of ericsson project
Date of Birth : 7thjuly 1987
Marital Status : Married
Gender: Male
Languages Known : English & Hindi.
Permananet Address : Mig 107 SBS colony new housing Board , Gaya Bihar
I hereby declare that all the information mentioned above is true to the best of my knowledge.
Yours Sincerely,
Anjanay Ranjan
Winner of Ericsson well known Power & Star awards multiple time for contribution.
Customer Implemention
Date of Birth : 7thjuly 1987
Marital Status : Married
Gender: Male
Languages Known : English & Hindi.
Permananet Address : Mig 107 SBS colony new housing Board , Gaya Bihar
I hereby declare that all the information mentioned above is true to the best of my knowledge.
Yours Sincerely,
Anjanay Ranjan