

AutoCAD
GA drawings
BOM preparation
2D drafting
3D modeling
Assistance to the team for product developmenet
Production supervision
Technical drawing review
Plant execution supervision
Site layout planning
Quality inspection of product and machine
Atta Chakki Plant (2017) - 24 Chakki Plant - Completely designed and provided assistance as per the finalized design.
Besan Plant - 150 TPD Capacity (2017-18) (Gargara - 30TPD & Superfine - 120TPD) - Supervised the erection activity and assisted the erection team as per the design and timeline, Arranged the required items to continue progress of the project