Summary
Overview
Work History
Education
Skills
Timeline
Generic
Ankur Bhowmik

Ankur Bhowmik

Kolkata

Summary

Accomplished Sub Project Manager with a proven track record at N Arc Consulting Enggpluss Pvt Ltd, specializing in underground cabling and project development. Expert in workforce training and systems implementation, achieving significant project milestones with efficiency. Demonstrates strong leadership in coordinating complex projects, ensuring seamless workflow and successful execution.

Overview

15
15
years of professional experience

Work History

Sub Project Manager, Under Ground Cabling Work

N Arc Consulting Enggpluss Pvt Ltd
Kolkata
01.2022 - Current
  • Maintained database records for all grants received and submitted.
  • Preparation of Daily/Weekly & Monthly Progress report as per part chart.
  • Preparation of Material Reconciliation & Feeder wise BOQ.
  • Coordination with client as per Project needs.
  • 33 kV, 11 kV, LT line (400/300/95 sq.) Under Ground Cable Laying, HDPE/GI pipe pulling work by HDD method and open trench method.
  • Under Ground cable new line and Fault line Testing (Megger testing & Pressure test at high temperature of power cable) Commissioning & charging.
  • HT UG Cable (400/240/95 Sqmm) indoor, outdoor & Straight through termination work.
  • LT overhead to UG Cable conversion, erection of Feeder box, service JB & plot JB.

Project Engineer, Under Ground Cabling Work

RECPDCL (through Randstad).
Bangalore
09.2020 - 12.2021
  • 33 KV, 11 KV, LT Line (400/ 240/ 95 Sq. mm) Under Ground Cable Laying, HDPE /GI pipe pulling Work by HDD method & Open trench method.
  • Under ground cable new line and fault line testing (Megger testing and pressure test at high temperature of power cable), commissioning, and charging.
  • RMU (2, 3, 4, 5, 6 WAY) Installation and connectivity. LT ABC (3×952 mm+1×162 mm+70mm) Stringing & charging.
  • HT UG Cable (400/240/95 Sqmm) indoor, outdoor & Stright through termination work.
  • DTR erection double pole to Single pole mounted with transformer seating (11 mtr spun pole) installation and as per Scheme.
  • 1 GOS to 3 GOS conversion work.

Senior Electrical Engineer, Reconductoring Work

Laser Power & Infra Pvt Ltd
Bhagalpur
06.2018 - 12.2018
  • Managing a team of 6-8 supervisors and approximately 80-100 workers.
  • Preparation of daily, weekly, and monthly progress reports as per part chart.
  • Billing of subcontractors and vendors.
  • Preparation of material reconciliation and village-wise BOQ.
  • Coordination with client as per Project needs.
  • Monitoring of 11 kV Squirrel, Weasel, Rabbit, to 11 kV Dog conductor conversion work.
  • Calculation of LT AB cable requirement: 50 sq mm, 70 sq mm, 95 sq mm, as per load.
  • DTR augmentation: 25 kVA to 63 kVA, 100 kVA to 250 kVA.
  • Joint Measurement with Client and PMC.
  • Preparation of handover/charging documentation.

Site Engineer, DDUGJY & Feeder Separation

SPML Infra Ltd
Berhampore
01.2018 - 06.2018
  • Erection of a new 11 kV agriculture line by the bifurcation of the old 11 kV line.
  • 33/11 kV substation renovation work, PTR augmentation, and new cable trench.
  • UG cable laying work execution as required in road/railway crossing.
  • Work planning should be done on a priority basis.
  • Solving ROW at the site.
  • Preparation of the Measurement BOQ and as per the reconciliation statement.
  • Charging of draw lines as per SLD.
  • Billings of subcontractors and vendors.
  • Joint Measurement/JMC.

Assistant Site Engineer, DDUGJY & IPDS

RECPDCL (through Randstad)
Berhampore
03.2015 - 09.2017
  • Meeting with the client's superintendent to update the progress of the project, quality of the workmanship, and material.
  • Preparation of the Bill of Quantities (BOQ) / Joint Measurement Certificate (JMC).
  • To prepare and submit all the documentation for the execution of the work at the site location (such as receiving the Work Order from J.E.). To hand over the certificate.
  • Responsible for the erection, installation, and commissioning of the distribution substation (33/11 kV), overhead HT line, underground HT line, double pole transformer structure as per standard, and LT line work as per standard.
  • To ensure that work is done in the minimum allocated time frame.

Planning Engineer, BRGF

L&T ECC (3rd party payroll)
Berhampore
06.2014 - 01.2015
  • Billing of subcontractors and vendors.
  • Maintaining and submitting the daily progress report.
  • Project monitoring of metering replacement and installation work.
  • Preparation of the daily report on infrastructure implementation achievements vs. targets.
  • Review with the client for a smooth flow of material at the site versus planning.
  • Preparation of reports for a thorough understanding of the client, as per the standard format.
  • Optimizing the agency to achieve the target by motivating and guiding on-site, with strong liaising with clients for smooth execution of the project.

Site Engineer, RGGVY II

Bajaj Electricals Ltd
Berhampore
03.2010 - 05.2014
  • Achievement: Successfully completed the erection, charging, and handing over (RGGVY-II) of two blocks in Murshidabad District. Client: NTPC and WBSEDCL.
  • Survey work, preparing village-wise BOQs and drawings (BRGF) of 4 blocks in Bhojpur District as a site in charge; Client: South Bihar State Electricity Board.
  • Project Responsibility: - Preparation of erection, retention, and withhold amount reconciliation statement, RA bills, and labor payment bill.
  • Preparation of the Progress Report, storing data, and the vendor/petty contractor material reconciliation statement.
  • Coordination with the Finance department.
    Coordination with the site team for the collection of data and documentation.
  • Responsible for preparation, checking, and billing for various works, materials, services, and reconciliation.
  • Preparing daily-wise targets. Achievement report. Preparing village-wise BOQ.
    Coordinating with the client.
    AutoCAD drawing.
  • Necessary approval from clients.
    Charging of consumers, village completion.
    Implementation of the route survey with the help of the GPS system and manual as well.
  • Erection of LT and 11 kV line for village infrastructure.
  • Meter installation work as per the proper list.
    Proper documentation for charging permission, JMC, shutdown letter, and handing over documents.

Education

Bachelor of Technology - Electrical Engineering

Camellia School Of Engineering & Technology
Barasat, Kolkata
06-2025

Advance Diploma In Industrial Safety - Industrial Safety

Indian Institute of Safety Management
Budge Budge, South 24 Parganas
11-2024

Diploma - Electrical Engineering

Dumkol Polytechnic
Dumkol, Murshidabad
06-2009

Skills

  • Workforce training
  • Systems implementation
  • Project development
  • Workflow planning
  • Feasibility analysis
  • Project tracking

Timeline

Sub Project Manager, Under Ground Cabling Work

N Arc Consulting Enggpluss Pvt Ltd
01.2022 - Current

Project Engineer, Under Ground Cabling Work

RECPDCL (through Randstad).
09.2020 - 12.2021

Senior Electrical Engineer, Reconductoring Work

Laser Power & Infra Pvt Ltd
06.2018 - 12.2018

Site Engineer, DDUGJY & Feeder Separation

SPML Infra Ltd
01.2018 - 06.2018

Assistant Site Engineer, DDUGJY & IPDS

RECPDCL (through Randstad)
03.2015 - 09.2017

Planning Engineer, BRGF

L&T ECC (3rd party payroll)
06.2014 - 01.2015

Site Engineer, RGGVY II

Bajaj Electricals Ltd
03.2010 - 05.2014

Bachelor of Technology - Electrical Engineering

Camellia School Of Engineering & Technology

Advance Diploma In Industrial Safety - Industrial Safety

Indian Institute of Safety Management

Diploma - Electrical Engineering

Dumkol Polytechnic
Ankur Bhowmik