Experienced in mechanical fitting and assembly, ensuring high-quality workmanship. Utilize technical drawings and blueprints for accurate task execution. Knowledgeable in equipment maintenance and repair to support operational efficiency and longevity.
Overview
11
11
years of professional experience
Work History
Fitter & Fabricator
Kumar Organic Products
12.2024 - Current
Troubleshot complex mechanical issues, developing effective solutions that minimized disruptions to project timelines.
Applied strong problem-solving skills to address unexpected challenges that arose during the fitting process.
Optimized workflow by organizing tools and materials, providing quick access for team members when needed.
Demonstrated adaptability by quickly adjusting techniques or strategies based on changing project requirements or specifications.
Followed safe work practices, which included fall protection and personal protective equipment.
Reduced machinery breakdowns with proactive identification and resolution of potential issues.
Maintenance Glass Lined Reactor, Stainless Steel reactor, Fermentor, Centrifugal pump, Water Cooled Chiller, Cooling Tower, Thermic Fluid Heater, Air Compressor and Biomass Boiler.
Fabrication installation of pipe lines and Structures.
Fitter and Fabricator
Sami Nutraceuticals Pvt Ltd
04.2024 - 11.2024
Conducted regular machinery inspections to ensure compliance with safety and quality standards.
Facilitated smoother operations by implementing preventative maintenance schedule.
Maximized tool lifespan through proper care and maintenance procedures resulting in reduced replacement costs.
Assisted in training new employees, sharing technical knowledge and best practices for efficient operations.
Developed safe and efficient workflows for construction projects.
Fabrication and Installation of pipe lines and structures.
Attending Breakdown maintenance on priority to minimize the machine downtime
Fitter and Fabricator
Kumar Organic Products
09.2020 - 03.2024
Troubleshot complex mechanical issues, developing effective solutions that minimized disruptions to project timelines.
Applied strong problem-solving skills to address unexpected challenges that arose during the fitting process.
Optimized workflow by organizing tools and materials, providing quick access for team members when needed.
Demonstrated adaptability by quickly adjusting techniques or strategies based on changing project requirements or specifications.
Followed safe work practices, which included fall protection and personal protective equipment.
Reduced machinery breakdowns with proactive identification and resolution of potential issues.
Maintenance Glass Lined Reactor, Stainless Steel reactor, Fermentor, Centrifugal pump, Water Cooled Chiller, Cooling Tower, Thermic Fluid Heater, Air Compressor and Biomass Boiler.
Fabrication installation of pipe lines and Structures.
Fitter and Fabricatot
Sri Manjunatha Engineering Works
02.2014 - 08.2020
Equipment erection and commissioning for pharmaceutical industries.
Fabrication and installation of pipe lines and structures
Preventive and breakdown maintenance of pump, Gear Box, Air Compressor, Cooling towers, Chillers, Glass Lined / SS Reactors, Various types of filter system,
Coordinated movement of materials and equipment to job sites.
Played key role in project completion by collaborating with engineers and other technicians on complex machinery setups.
Improved overall project completion time through proficient use of hand tools, power tools, and specialized machinery.
Ensured accurate alignment of machinery parts by precision measuring and adjustments, leading to increased equipment reliability.
Performed detailed inspections of completed assemblies, ensuring adherence to quality standards and client requirements.
Staff Nurse at SRI JAYADEVA INSTITUTE OF CARDIOVASCULAR SCIENCE AND RESEARCHStaff Nurse at SRI JAYADEVA INSTITUTE OF CARDIOVASCULAR SCIENCE AND RESEARCH